RMUCR_2~~~~E~D~M~IN~IN~G~S~C::::::.;H~E~M:..:!;_E ~1f(1 "'IIC;a ~~!I t-:~ . .....IooY--+-t+-t ~~e'F ~ffi (j'~,rS"J!tJ.. ,52 (3)(i) OF RMMCR 2017 FOR EXTRACTION OR ~:' ~l~~~~~PSUM FROM AGRICULTURE LAND FOR .. ~a tl>m~il tel "I f\N1l,Mt{~MPROVEMENT OF LAND) ~~~ For GYPSUM APPLICATION REF. NO. 201730589 Area-4.75 heet. NEAR VILLAGE -JAGGASAR TEHSIL -KOLA YAT DISTRICT -BIKANER r ~T:3"'~':' ;'C! :l 1 ~ ..... I". ' ' , ..... ~~" 1 ft p n~::: OVF flJ APPLICANT- SARDARU KHAN SIO GULAM RASUL 20 S M D MIRANWALA, ~ DISTRICT -BIKANER ",,-ida; ~ .• !~q~"", ~ l.. -1- t r-;r:" ""'l-rnT ...~t-,r;h CONSULTANT- GEOMIN SOLUTION PVT LTD OPP. PUGAL HOUSE, OLD GINNANI, BIKANER(RAJ) MOB. 09314185551, TEL. - 0151-2203255
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Index f. I'""' ~I ~ () V En J_"S.No DESCRIPTION PAGE NO.01 Detail of applicant 402 Detail of applied area 403 Copy of khasra map of Applied Area 404 Basic infrastructure available nearby applied area 405 Distance of habitation from applied area 506 Detail of earlier removed Gypsum /if any 507 Details of existing plantation in applied area 508 Scheme of collection and use of top soil 509 Detail of nalas, river, and water source nearby
applied area5
10 Plan for rain water diversion fif required 611 Plan for extraction or removal of gypsum and
required machineries6
12 Details of production and dispatch of gypsum 6
14 Measure taken for air pollution, noise pollution and 8
treatment of dust suppression
13 Detail of production of gypsum f per month 7
159Programme of afforestation
3=G-·rr;:'c',<~~.
APDR0\/EU;'
LIST OF PLATESS.no. Particulars Plate no.
1. Applied area map I2. Key plan 23. Surface plan 34. Surface geological plan & section 45. Year wise removal and extraction plan & 5
section
6. Environment plan 67. Conceptual plan 7
List of Annexure
1. Copy ofLOI.
2. Copy ofkhasra map
3. Copy of Jamabandi.
4. Copy of Joint Inspection Report.
----------- -- -- - - - ---- ----------
1. DETAIL OF APPLICANTa. Name of licensee Sardaru Khanb. Address of licensee 20 s m d Miranwala
c. Aadharno.
d. Application Ref. No. 201730589
e. Phone No. 7568724776f. Status of the licensee Individualg. Details of the Area Jaggasarh. District and State Bikaner & Rajsthan1. Tehsil KolayatJ. Village Jaggasar2. Detail of applied area :a. Khasara lMurabba No. 181/6b. Area of KhasaraiMurabba: See annexure 3c. LOI area 4.75 hect.d. Revenue Village Jaggasare. Patwar Circle Jaggsarf. Tehsil Kolayat
5. Distance of Habitation from applied area:
s. no Village name Population Distance and direction
from applied area01 Mlranwala 162 1.5 km, NE•~ 02 Nasooma 3.0 km, ESE141
03 Karnisar 606 6.0 km, NE
g. District Bikaner
3. Khasara map showing applied area -
4. Basic infrastructure available near applied areaRoad
Electricity
Telephone
Water supply
Dispensary
Post Office
School
Nearest Railway Station
Connecting road MDR 103
Available at Jaggasar
Not Available at applied area
Canal water of IGNP and Pvt. Tanker Supply
131~Tfr~~I
Primary School at Jaggasar 1(\ r P R0\.'~-~JKolayat
6. Detail of earlier removed gypsum lif any _
No, Applied area is in agriculture land and gypsum has not removed inthis area By applicant.
7. Detail of existing plantation in applied area-
Applied area is in Desert region hence it is!~ation and there
no significant number of trees or plants.
8. Scheme of collection and use of top soil -
Over burden is dune sand in this area and it will be collected and stack
separately at appropriate place after the mining of gypsum it will be used
for reclamation. r ~ =4 ,}l:..;=..;' ~ l,.........
fl ~~f:' )VEr~,Detail of nalas, river, water stream, and other source _ JArea fall in project of Indira Gandhi canal project main source of water
in this area only is canal water. The area situated in desertic zone of
Rajasthan and there is not natural water stream/nala present here.10. Plan for rain water diversion/if required _
9.
The applied area situated in thar desert of western rajsthan it is arid
climate average annual rainfall is about 200 mm. rain water scarcity is
too much so there is no requirement of rain water diversion.
11. Plan for Extraction or removal of gypsum and required machineryProposed Mining Method:-
The mineral Gypsum is overlain by Dune Sand Dune so for the
exploitation of mineral there is requirement of removal of the over
burden and stack soil cover separately at the appropriate location. Since
the deposit occurs at a depth of 0.50-1.20 mt and the average thickness
0.54 mt and sufficient to mineable. Semi mechanized open cast mining is
the suitable method for mining. The mining will be carried out as per
requirement. The overburden and mineral will be excavated with the help
of JeB. overburden will be removed and transportation of Gypsum from
mining pit to tractors and Trucks .. The overburden is unconsolidated and
alluvium sand. The mineralized bed is massive and homogeneous easily
extractable with help of JeB. In view the above drilling and blasting of
rock would not be required. Machineries for mining will arranged on hirebasis by applicant.
12. Details of production and dispatch of gypsum:-
It is not huge practice and mining will be done only upto 02mt deep from
surface. Gypsum is surface deposit and mining will be done as per demand.
As per demand mineral will be mined out and dispatched directly to user-industries.
13. Detail of production of gypsum / per month:
Detail of production of Gypsum is listed below-
Total deposit of Gypsum
Area(Sq. mt.) Thickness(mt) Volume(Sq. mt.) Density Tonnage
2.347500 0.54 25650
Year wise production of GypsumYear Production in Tons1st Year 196652nd year 196653rd year 19665
Average 3 Month ProductionMonthsyear Production in tons