Saverio Minutoli INFN Genova 1 Saverio Minutoli INFN Genova 1 T1 Electronic status Electronics Cards: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine Other development: 16chs preamplifier. Cabling and Power Supplies: Platform to T1 cabling High Voltage Low Voltage Patch panels Conclusions CERN Collab. Meeting 3 - 6 Dec. 2007
Electronics Cards: A node F ront E nd C ard C athode F ront E nd C ard R ead- O ut C ontrol card VFAT hybrids T 1 T rigger M ezzanine Other development: 16chs preamplifier. Cabling and Power Supplies: Platform to T1 cabling High Voltage Low Voltage Patch panels Conclusions. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Saverio Minutoli INFN Genova
1Saverio Minutoli INFN Genova
1
T1 Electronic status
Electronics Cards:
Anode Front End Card Cathode Front End
Card Read-Out Control card VFAT hybrids T1 Trigger Mezzanine
Other development: 16chs preamplifier.
Cabling and Power Supplies:
Platform to T1 cabling High Voltage Low Voltage Patch panels
Conclusions
CERN Collab. Meeting 3 - 6 Dec. 2007
Saverio Minutoli INFN Genova
2Saverio Minutoli INFN Genova
2
Electronics Cards
Saverio Minutoli INFN Genova
3Saverio Minutoli INFN Genova
3
VFAT hybrid input ground isolation new feature.
5 pieces of 1P and 5G already produced. Waiting for the components loading.
Mass production launched. PCBs ready within Dec. 2007. Decision on passive components networks
within ½ Jan. 08 Components mounting within ½ Feb.08 End tests, validation and CSCs soldering
March 08
AFEC
Saverio Minutoli INFN Genova
4Saverio Minutoli INFN Genova
4
CFEC (1)
Final layout routing in progress.
Ten PCBs ready ½ Jan. 08 PCBs mounted within end
Jan. 08
Decision on passive components networks within end Jan. 08
Mass production ready within ½ Feb.08
End tests and validation March 08.
Saverio Minutoli INFN Genova
5Saverio Minutoli INFN Genova
5
CFEC (2)
Upgrade to high resolution.
New layout Feb. 08 Few prototypes ready
March 08. End tests and
validation April 08. Mass production
frozen.
Saverio Minutoli INFN Genova
6Saverio Minutoli INFN Genova
6
ROC (1)
Some delays due to CERN custom components procurement. Needed to avoid wrong components packages association.
Several features implemented: DOHM and CCUM emulation. DOHM I2C lines handling (follow the CCUM-SCR redundancy
scheme). Trigger VFAT Mezzanine GOHs mezzanines input pattern generator. Several Data GOH DAV sources available. Several Trigger GOHs DAV sources (BC0, Static, Timed by CCUM) Foreseen a SPY Mezzanine based on T1 Digital Mezzanine.
The layout is done. 5 PCB ready Dec.07 3 Circuits mounted and (fully??) tested Jan.08 PCBs mass production Feb. 08 Full ROCs ready within March 08.
Saverio Minutoli INFN Genova
7Saverio Minutoli INFN Genova
7
ROC (2)
Saverio Minutoli INFN Genova
8Saverio Minutoli INFN Genova
8
ROC (3)
BC0b
IDLEb/ON
TR_GOH_DAV
I/O CCUM
MUX
CSC1
A
DATA_GOH_DAV
I/O CCUM
MUX
MUX
MUX
I/O CCUM
CSC2
A
K
K
K
TRIGGER
DAV
DATA
DAV
Has been tested ???
Saverio Minutoli INFN Genova
9Saverio Minutoli INFN Genova
9
VFAT hybrids
The installation of 1 arm (30 CSCs) involve 200 VFAT hybrids. This number is equivalent to the full T1 anode VFATS hybrids
production including spares. In this installation 60 will be dedicates for the anodes and 80 for
the cathodes (CFEC VFAT only based). Hybrids production (PCBs and components mounting) at CERN. 200 VFAT hybrids production must end Feb. 08 (Ruy). Bonding may be made in Genoa.
Needs agreement with the people in Genoa lab. Needs to know all the rules and material used by the CERN
bonding lab. Needs some VFAT dummy chips in order to test all the
procedures. Could be useful a training period at CERN of our bonding
technician. Validation of the first hybrids in agreement with the CERN people
(W.S.- P.A.). Hybrids bonding and test time schedule TTP dependent.
Saverio Minutoli INFN Genova
10Saverio Minutoli INFN Genova
10
T1 Trigger Mezzanine
T1 detector have 15 trigger fibers per each ¼ while each OptoRx mezzanine accept up to 12 fibers.
In order to merge and manipulate with a dedicate algorithm all the trigger bits (30 fibers in total), we will need the custom TTM mezzanine to add to the Trigger TOT-FED.
The trigger system is not completely fixed, need some more iterations within the trigger group.
TTM not needed at the beginning (March 08). Expected to be available in June 08.
Saverio Minutoli INFN Genova
11Saverio Minutoli INFN Genova
11
16 channels preamplifier (1)
This small boards use the same FE preamplifier device integrated inside the VFAT chip (see Jan Kaplon).
Needed for final studies on T1 CSC detector.
PCBs ready. Components mounting 3rd w/Dec.07
Saverio Minutoli INFN Genova
12Saverio Minutoli INFN Genova
12
16 channels preamplifier (2)
TOP BOTTOM
Saverio Minutoli INFN Genova
13Saverio Minutoli INFN Genova
13
Cabling and Power Supplies
Saverio Minutoli INFN Genova
14Saverio Minutoli INFN Genova
14
OLD Section
Saverio Minutoli INFN Genova
15Saverio Minutoli INFN Genova
15
Platform to 6th T1 Frame cable tray
Who is responsible for this cables ??(Putting in work and purchase)
NEW Section
Saverio Minutoli INFN Genova
16Saverio Minutoli INFN Genova
16
Platform Service Racks
Saverio Minutoli INFN Genova
17Saverio Minutoli INFN Genova
17
CSC#1
CSC#15
HV ch#1
HV ch#15
Patch Panel on 6th frame
Patch Panel on T1 Platform
A1
55
0P
-Ca
en
HV
24
ch
sH
V P
.S.
100m HV Cable
15m HV Cable
Counting Room
T1 Rack Platform
T1 ¼
Ma
in F
ram
eS
Y1
52
7
Inside T1 1/4
T1 ¼ HV cabling schematicS.M. 24/04/2007
Saverio Minutoli INFN Genova
18Saverio Minutoli INFN Genova
18
Low Voltage and High Voltage components.
Placed order at CERN for WIENER MARATON low voltages system. Two simple VME crates are also purchased for
the MARATON remote control cards. Delivery expected within March 2008 T2 spares as back-up solution in case of
longer delay Placed an order to CAEN for HV modules
A1550P, and one mainframe SY1527. Delivery expected March/April 2008.
Saverio Minutoli INFN Genova
19Saverio Minutoli INFN Genova
19
Patch panels
Hosted on the platform racks: High Voltage to be done, but ok for March 08.
Connectors procurement done.
Hosted on the 6th T1 Frame: Low voltage prototype almost ready, ok March 08. High Voltage all boxes made, one cabled
prototype almost ready, ok March 08. Optic fiber to be done, need a fiber cable fan-out
and MPO connector for the dimensioning of the box (see W.S.).
Saverio Minutoli INFN Genova
20Saverio Minutoli INFN Genova
20
Christmas wish list.
Dear Santa: In order to debug the ROC optic sections
and the slow control ring we need a dedicated DAQ (H8 style) system for us either in Genova or in Bld188 already now.
We need a user friendly TTP based test-setup beginning Feb. 08 to do and test hybrid bonding.
Need a DAQ system able to test all the ROC features towards end of Jan.08 .