Top Banner
T-870-INTE Mjölnir Fuel and nozzle team Milestone presentation Instructor: Joe Foley Students: Ingi Mar Jónsson, Jóhannes E. Valberg Sverrir Haraldsson Department of Science and Engineering (TVD) Reykjavík University April 28, 2014
13

T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Sep 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

T-870-INTE MjölnirFuel and nozzle team

Milestone presentationInstructor: Joe Foley

Students: Ingi Mar Jónsson, Jóhannes E. ValbergSverrir Haraldsson

Department of Science and Engineering(TVD)

Reykjavík UniversityApril 28, 2014

Page 2: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

● Introduction

● Requirements

● Explosives

● Orders in progress

● RockSim Simulations

● Launchpad

Overview of the Talk

● Status

● Next Steps

Page 3: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Introduction

● Explosives○ Seminar○ Coast Guard

● Rocket motors○ 98 mm○ 38 mm

● External Rocket body○ Custom Rebel Space ○ Broken Arrow 5 XP

● Launchpad

Figure www.briandevlin.com

Page 4: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Requirements

● Safety at all times (fuel/engine, launch tactics and more)

● Able to carry ~4 kg payload

● Ultimate goal of reaching altitude of 6+ km

● Stable flight pattern○ Center of gravity placed within 3 - 5 x diameter of rocket total center of

area.

Page 5: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Explosives

● Seminar○ regulations○ basic theories○ calculations for industrial use

of explosives

● Coast guard ○ quick overview of how to

handle live unstable rockets○ what to do and what not to do

in the field

Page 6: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Orders in progress

● Pro98 Wrench

● Pro98 4 Grain Hardware Set○ 4 Grain casing, Forward Closure, Nozzle Holder, Retaining Ring and

Closure Set.

● Pro98 4 Grain Reload Kit, White○ Dimensions 98 x 702 mm ○ Total Impulse 10.366,9 Ns○ Maximum Thrust 2216,4 N○ Burntime 5,89 s○ Total Weight 5.727 g

● Estimated cost○ 480.000 ISKr

Figure:http://www.rebelrocketry.com/shop/product_info.php?info=p607_Pro98-4-Grain-Hardware-Set.html

Figure:http://www.rebelrocketry.com/shop/product_info.php?info=p198_Pro98-Wrench.html

Page 7: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Orders in progress

● Pro38 2 Grain Motor Case

● Pro38 2 Grain Reload Kit, White○ Dimensions 38 x 186 mm ○ Total Impulse 269,1 Ns○ Maximum Thrust 127,5 N○ Total Weight 325,3 g

● Estimated cost○ 30.000 ISKr

Figure:http://www.rebelrocketry.com/shop/product_info.php?info=p3124_Pro38-2G-269-H110-WH-14A-Reload-Kit--White.html

Page 8: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

External Rocket Body

● Rebel Space Level 3 Custom kit○ Includes GPS, Altimeter, Recovery Setup ○ 102 x 2813 mm○ Estimated dry weight 5,5 kg○ 12.000 EUR + shipping

● Broken Arrow 5 XP from ProLine○ Level 2 - 3 rocket for K to N motors○ G12 Airframe○ 98 mm motor mount○ 127 x 3040 mm○ Dry weight 11 kg○ Delivered!

Figure:http://rocketrywarehouse.com/product_info.php?products_id=651

Page 9: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

RockSim simulation

Page 10: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Launchpad

● Designed in SolidWorks○ Based on previous design○ Adjustable base○ Security tilting mechanism ○ Material ordered

Page 11: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Status

● Rocket motors have been ordered○ In shipping ○ Delivered to Kemis for storage

● Rocket Bodies○ Broken Arrow XP5 rocket has arrived, requires assemble○ 38 mm test rocket has arrived, requires assemble○ Custom Rebel Space rocket ordered

● Explosives seminar○ Finished○ B license acquired

● Launchpad○ Design finished○ Waiting for material

Page 12: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

Next steps

● Assemble launchpad (02.05.14)

● Write safety and pre-launch procedures (05.05.14)

● Internal design and assembling of mounting mechanism (09.05.14)

● Assemble rocket (09.05.14)

● Launchpad setup (13.05.14)

● Rocket Launch (14.05.14)

Page 13: T-870-INTE Mjölnir - repository.cs.ru.is · Explosives seminar Finished B license acquired Launchpad Design finished Waiting for material. Next steps Assemble launchpad (02.05.14)

End of presentation

Thank you

QUESTIONS?