This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Slide 1
Systems Engineering Forum Oct 15, 2004 Ver 1.16 DEFENSE
LOGISTICS AGENCY Transformation -- Supporting The Warfighter
Slide 2
2 Scope of Business 45,000 Requisitions/Day 8,200 Contracts/Day
#54 Fortune 500 Above Northrop Grumman #2 in Top 50 Distribution
Warehouses 25 Distribution Depots 5.2 Million Items 24.7M Annual
Receipts and Issues 1411 Weapon Systems Supported 147.7M Barrels
Fuel Sold (FY 03) $12.5B Annual Reutilizations/Disposals 21,490
Civilians 524 Active Duty Military 637 Reserve Military Located in
48 States/28 Countries Foreign Military Sales Sales: $719M
Shipments: 580K Supporting 124 Nations FY 02 Sales/Services: $21.5B
FY 03 Sales/Services: $25B FY 04 Projection: $28.9B
Land/Maritime/Missiles: $ 2.7B Aviation: $ 3.3B Troop Support:
$10.2B Energy:$ 5.2B Distribution: $ 2.2B Other: $ 1.4B ~95% of
services repair parts 100% of services subsistence, fuels, medical,
clothing & textile, construction & barrier materiel The DLA
Enterprise as of Oct 1, 04 People
Slide 3
3 J-3 L OGISTICS O PERATIONS J-1 H UMAN R ESOURCES DNSC
DIRECTOR VICE DIRECTOR DLA S UPPORT S ERVICES DSCR J-8 F INANCIAL O
PERATIONS SPECIAL STAFF J-9 J OINT R ESERVE F ORCES DLA Director
Vice Admiral Keith W. Lippert Supply Corps, United States Navy
DLA-EDLA-P Vice Director Major General Mary Saunders United States
Air Force J-4 C USTOMER O PERATIONS & R EADINESS CORPORATE
STAFF DDCDSCPDESC J-6 I NFORMATION O PERATIONS DSCCDRMS DLISDAPS
BUSINESS UNITS SERVICE ACTIVITIES DLA-C Defense Logistics
Agency
Slide 4
4 10 Major IT modernization programs 2 ACAT 1A $1.8+ billion
net savings committed for return to the Services Agencys core
business model changing Support to Services driven by future
requirements Suppliers manager and integrator Supply Chains
effective, efficient and seamless Partner End-to-end internal
business process re-engineering based on COTS integration
Collaborating with Services, Agencies and Combatant Commanders DLAs
Transformation Strategy
Slide 5
5 Legacy systems do not meet current and future operational
needs Does not support Joint Vision 2020, DoD Force-Centric
Logistics and DLA Strategic Plan Does not support changing business
rules Obsolete code and outdated/inflexible technology No real-time
access to logistics data High maintenance costs, increasing
unreliability Legacy environment does not support DLAs Vision for
Warfighter Customer Support Why DLA Needs To Modernize Its Business
Systems
Slide 6
6 Major Transformation Effort--Massive Change for our
Workforce, Creation of an Enterprise Incorporating Best Practices
via Commercial-Off-The-Shelf (COTS) Based Tools BSM Replaces
30-year old Materiel Management Systems and our processes were
embedded in those systems The Core of DLAs Enterprise Architecture
Using best business systems engineering practices Managed as ACAT
1A program DLAs Business Systems Modernization (BSM)
Slide 7
7 Economic Analysis Summary: Investment $ 506.7 M Return$ 772.1
M Return on Investment 1.52 Payback FY 09 July 03 Economic
Analysis. EA is being updated for Full- Rate Production Deployment
Review Expected Benefits: Improved demand forecasting accuracy
Better stock positioning Improved financial accountability Achieve
auditable financial statements Retire 15 legacy systems Reduce risk
of catastrophic failure Program Attributes: Major Acquisition
Program Within Program Objective and Threshold Core of DLA
Transformation strategy Reengineered business process and best
practices Enterprise Resource Planning (ERP)/COTS Commercial Data
Center Program Timeline: Analysis of AlternativesJan 99 Scripted
Demonstration of COTSAug 99 Mission Need validated/approved by
JROC/Milestone 0 Nov 99 Approval to begin Concept Development by
ASD(NII)/Milestone 1/2 Aug 00 Blueprint/Design/Build/Test
Jan01-Jun02 Approval to being Concept Demonstration by
ASD(NII)/Milestone CJul 02 Initial Operating CapabilityFY 05 Full
Operating CapabilityFY 06 BSM Program Summary
Slide 8
8 Business Systems Engineering Approach Design Deliverables
Functional Designs Scenarios & Scripts Data
Migration/Conversion Approach Training Execution Plan Training Gap
Analysis Competency Profiles BSM Roles & Responsibilities Build
Deliverables Technical Specifications Source Code Training Material
Unit Test Plan & Results System/Product Test Plan
Conversion/Mock Conversion Test Plan Performance/Stress Test Plan
Regression Test Plan Configuration Rationale Assembly Test Plans
Test Deliverables Functionality Test Cases/Test Scripts/Data Sheets
Integrated Test Cases/Test Scripts/Data Sheets System/Product Test
Execution Plan/Log Security Test (Application) Plan & Results
User Acceptance Test Plan & Results System Product Test Results
Conversion/Mock Conversion Test Results Performance/Stress Test
Results Regression Test Results SIR Report with Completion Status
Build TRR Requirements ITR Design PDR CDR Test ORR OA Independent
IOT&E Independent Validation and Verification (IV&V)
Documented in SEP/TEMP Responsibility of the Program SE Lead
Process Validation by the SE Chief In Coordination with the SE
Technical Authority OTRR SRRIBR Technical Blue Print Review RICE
Object Validation Business Systems Modernization (BSM)
Slide 9
9 ChiefInformationOfficer Portfolio Management Portfolio
Management Program Management Enterprise Architecture Program
Executive Officer Chief Architect Enterprise Portfolio Manager
Business Systems Engineering Enterprise Solutions J-6
Organizational Relationships
Slide 10
10 DLA Portfolio Management Process
Slide 11
11 Strategic Planning (Cyclical-Annual) Mission Analysis (Event
Driven) Portfolio Management (POM Driven) Systems Acquisition
(Phased Milestone-Driven) TEB Process Owners Portfolio Manager
Architecture Information Repository Portfolio Information
Repository Process Information Repository Enterprise Models
Operational Models Functional Proponent s System and Infrastructure
Models PEO and MDAs Functional Proponent s PMs TEB Architecture
compliance Architecture Baselines J-1 / J-3 / J4/ J-6 / J-8/ J9/
DSS Functional Rqmts Gaps/Overlaps Investment Phasing Transition
Plan ( Master Schedule) Enterprise Architecture Process for
change
Slide 12
EXECUTE LOGISTICS ELIMINATE/DEMOTE ENABLE LOGISTICS PLAN
LOGISTICS Plan Materiel Provisioning Logistics Chain OV2.1 Analyze
Data From CBM+ Monitor Intransit Visibility Monitor Asset Location
Monitor Maintenance History Monitor Cost Integrate Asset Collect
Historical Maintenance Data Validate and Verify Modification Kit
Install Modification Kit SourceMakeDeliverSustain Contract Award
Contract Administration Program Structuring, Planning &
Scheduling Project Execution Program Structuring, Planning &
Scheduling Plan Acquistion Strategy Conduct Test & Evaluation
PackagingDelivery Plan Fielding and Allocation Scrap (TLCSM)Sales
(TLCSM)Gains & Losses (TLCSM)Surplus (TLCSM) Asset Visibility
Plan Materiel Provisioning PublicationsBills of Materials Plan
TLCSM This is outside of Logistics and is in the role of
Acquisition BEA-Log DoD Enterprise View DoD Domain Views DLA Supply
Chain View BEA BEA Activity Overview Perform Organizational
Management Manage Benefits Manage Payroll and Travel Pay Identify
Financial Compliance Report Requirements Identify Management Report
Requirements Prepare Information Product Disseminate Information
Product Analyze Customer/ Vendor Information/ Credit Perform
Billing/ Establish Receivables Manage Receivable/ Debt Manage Cash
Liquidate Receivable/ Debt Establish Strategic Requirements
Establish Future Year Defense Plan/ Program and Budget Allocate and
Control Funding Execute Current Year Business Plan Improve
Strategic Planning and Budgeting Processes Perform Procurement and
Acquisition Manage Payables Manage Purchase Card Program Disburse
Funds Design/Maintain Code Structure/Chart of Accounts/ Accounting
Methodology Map/Post/ Accumulate Information Conduct Closing and
Review Perform Accounting Analysis and Review Human Resource
Management Execute Logistics Plan Logistics Enable Logistics
Financial Management & Reporting Process Collection/ Acct Rec
& Manage Cash Perform General / Cost Accounting Perform
Strategic Planning & Budgeting Manage Procurement / Payable /
Acq / Disbursing Perform Logistics Manage Operations PlanningOrder
Fulfillment Procurement Finance BSM Alignment with DOD
Architectures
Slide 13
13 Sponsorship/Leadership Reporting Process DLA Oversight
Overarching IPT (OIPT) Change Management Change Management
Knowledge Transfer Knowledge Transfer Risk & Issue Management
Risk & Issue Management Site Transition Site Transition
Contracts & Acquisition Contracts & Acquisition Solution
Integration Solution Integration Solution Sustainment Solution
Sustainment Program IPTs Integrating IPT (IIPT) Working IPTs
(WIPTs) Acquisition Technical Testing Earned Value/Resource
Monitoring Earned Value/Resource Monitoring TEB Corp. Board
CIOPartners PEO Program Oversight Weekly Solution Integration
Status Weekly Change Control Board Monthly Program Manager
Assessment Quarterly Program Implementation Group Quarterly Defense
Acquisition Executive Summary Report PM Program Milestones Exit
Criteria Reviews For Each Phase System Readiness Preliminary Design
Critical Design Test Readiness Operational Readiness Program
Integration Monthly Corporate Board Bi-Monthly TEB Enterprise
Architecture Reviews Program Reporting OMB Circular A-11 (Budget
cycle) Clinger Cohen Act Certification Federal Information Security
Management Act (FISMA) Domain Reporting Business Enterprise
Architecture FFMIA Comptroller Certification Logistics Program
Review IPT Reporting Weekly WIPT Meetings Bi-Weekly WIPT Leadership
Reviews Information Assurance Information Assurance CAE MDA
Director PMO SI CIO
Slide 14
DLA Policy and Guidance PMs Monthly Assessment -Sample-
Delivering Transformation through Disciplined Business Systems
Program Management Practices
Slide 15
SEP TEMP Overarching IPT (OIPT) Integrating IPT (IIPT) PEO
Review Board Program Alignment, Engineering Authority ACAT III
ProgramsACAT IA Programs DLA Chief Information Officer J-6 Chief
Technology Officer PEO Design ---------- Build ---------- Test
System Solution Integrator MDA PEO Review Board Program Alignment,
Integration and Engineering Oversight MDA Technical Reviews Program
Oversight Technical Reviews IT Solutions Document Enterprise
Architecture LCM for Emerging Systems -One Book AIS Program
Management -One Book IT Acquisitions-One Book CMMI Data Quality
CMMI Reviews CAE Acquisition Oversight DLIS - Data Integrity System
Integrator Best Practices DLA Business Systems Engineering
Governance
Slide 16
16 SEP Policy/ Procedures Technical Authority Best Practices
Lessons Learned Education/ Training Tools Contract Incentives SE
Partnerships SEP Policy/ Procedures Technical Authority Best
Practices Lessons Learned Education/ Training Tools Contract
Incentives SE Partnerships Business Systems Engineering
Characteristics Enclosure 10 Capability Analysis Functional
Requirements Analysis and Allocation Design Requirements Loop
Verification Design Loop Business Systems Capabilities Needed
Capabilities Acquisition Planning Requirements Mgmt Configuration
Mgmt Risk Mgmt Project Mgmt Test and Evaluation Integrated Teams
Solicitation and Source Selection SE Partnerships Acquisition
Planning Requirements Mgmt Configuration Mgmt Risk Mgmt Project
Mgmt Test and Evaluation Integrated Teams Solicitation and Source
Selection SE Partnerships Business Systems Engineering Process
Software Acquisition (SA) Process Improvements Section 804 Build
Test Test Loop Software Acquisition/Business Systems Engineering
Process Improvement Approach
Slide 17
Testing Process Management Project Management Plan
Configuration Control Board (CCB) Contemporary Systems Director,
Enterprise Solutions Design ---------- Build ---------- Test DLA
Sustainment Organization (J-6) System Oversight IT Solutions
Document IT Acquisition One Book Enterprise Architecture LCM for
Contemporary Systems One Book IEEE/EIA 12207.1 SPI CMMI CM/TM Tools
DLA Chief Information Officer J-6 Chief Technology Officer
Technical Reviews Data Quality DLIS - Data Integrity DLA Business
Systems Engineering Governance
Slide 18
18 How do we close the Gap DLAs Business Systems Engineering
Workforce Ensure transition plan in place Reduce legacy demand
Ensure quality hand-off from BSM program office Set realistic
expectations with the business Use contractor support for legacy
and move organic to BSM Ensure people are Job Ready Requires
Supervisor focus and accountability to affect workforce change
Measure and hold employees accountable Drive skill development with
continued focus on training and job assignments Establish
meaningful IDPs * Based on extrapolation of Employee estimates of
skill progress Steady State Projected Demand = 177 employees Steady
State Target Budget Staffing = 119 Employees Steady State Projected
Demand = 177 employees Steady State Target Budget Staffing = 119
Employees 10/200312/2003 R1.1 03/2004 R1.2 5/2004 R1.3 8/2004 R2.0
9/2006 FOC As of: July 2004 DLAs Sustainment Workforce
Slide 19
19 DLA Response Wynne Direction: All Programs Apply robust
Systems Engineering (SE) approach to balance total system
performance and total ownership costs within FOS/ SOS context
Develop a SEP for MDA approval for each Milestone Review and
integrated with the Acquisition Strategy Describe programs overall
technical approach in SEP Technical Approach Technical Reviews DLAs
IT business systems programs are implemented using COTS solution
integration best practices consistent with systems engineering best
practices In DLA, business SE is applied to both Emerging and
Contemporary IT Business Systems DLA is updating and developing One
Book Topics to address business SE and SEP requirements DLA is
revising the MS Exit Criteria to include business SE for ACAT III
Programs Oversight is accomplished through the Alignment,
Integration, and Engineering Organization Moving to a COTS Business
Systems Engineering Focus as an Enterprise Wynne Systems
Engineering Plan Direction and DLA Response
Slide 20
20 Streamline, Leverage and Collaborate Awareness, Change
Readiness, Training and Education Enhance Portfolio Management
Active Engagement/Effect Process Change Streamline, Leverage and
Collaborate Awareness, Change Readiness, Training and Education
Enhance Portfolio Management Active Engagement/Effect Process
Change FOCUS Tailored COTS business systems engineering approach
across Logistics Domain DUSD(L&MR) Program Implementation Group
Defense Acquisition System (5000) Streamlining with AT&L
Logistics Cross-Domain Integration Data Integration Data
Interoperability Logistics COE Data Strategy consistent with
Net-Centric Enterprise Services Business Enterprise Architecture
Defense Acquisition University (CEBS) EI Toolkit DLA Collaboration
Efforts
Slide 21
21 COTS Lifecycle Overview
Slide 22
22 Coordination of multiple organizations for ACAT IA programs
(SE/Test, BEA, IA, etc.) Evolving Net-Centric context Agency
resources stretched where some PMOs consist of only 2-3 personnel.
Must rely on industry for business SE processes Program impact when
applied to post-Milestone B ACAT IA programs Tailoring for COTS
integration business systems implementation Business Systems
Engineering Concerns
Slide 23
23 Delivering Transformation through disciplined business
systems engineering, portfolio management, and program management
practices Implement business SE within each program, using BSM
practices as the Model Provide oversight through PEO Program
Alignment, Integration, and Engineering Office Business SE a part
of Milestone Reviews and CMMI reviews Leverage Industry COTS
business systems engineering practices Updating Policies in the DLA
One Book Conclusion DLA Implementation Approach
Slide 24
24 Backup Slides
Slide 25
SE Technical Authority Enclosure 10, DODI 5000.2 Requirement
J-64 Enterprise Solutions PROGRAM SE Lead Technical Review Board
SEP TEMP PROGRAM SE Lead Technical Review Board SEP TEMP PROGRAM SE
Lead Technical Review Board SEP TEMP SE Chief Alignment,
Integration, and Engineering J-621 Business Systems Engineering
Compliance Structure DRAFT PEO Office PEO J-62
Slide 26
26 Requirements ITR Initial Technical Review SRR System
Requirements Review Design Test ORR Operational Readiness Review
OTRR Operational Test Readiness Review Production & Deployment
IBR Integrated Baseline Review PCA Physical Configuration Audit IBR
Integrated Baseline Review TRR Test Readiness Review Build
Operations & Support In-Service Review MS C IOC FOC Technical
Review Boards PDR Preliminary Design Review CDR Critical Design
Review System Development & Demonstration Concept Refinement
Technical Development MS B MS A Technical Reviews Approach
Slide 27
Acts as the MDA for ACAT III programs Chairs the PEO Review
Board Provides Program Assessment and Status Reporting Implements
LCM Policy and Procedures Provides Comments to the DAES Reports
Oversees PM Training and Certification Provides oversight to
Program Funding Provides oversight for systems integration Provides
guidance and direction to the PMs Informs CIO/CAE of program
critical issues Implements the IT systems acquisition policy and
procedures Reports directly to the CIO Reviews and/or approves
appropriate LCM program products CAE PEO CIO Director DLA TEB PEO
Responsibilities Jointly sets IT systems acquisition policy and
procedures through the One Book Process Provides IT investment and
programmatic oversight and support to the PEO Reviews and concurs
with IT ACAT IA Acquisition Program Baselines Provides IT
capabilities through IT program implementation and performance
through the PEO Reviews IT program EA/BCAs for quality and ROI
Certifies CCA Compliance Selects and Assigns PMs for IT ACAT IA and
ACAT III Programs Oversees IT PM training and certification
Participates as a member of the TEB Jointly identifies IT special
interest programs CIO Responsibilities Jointly sets IT systems
acquisition policy and procedures through the One Book Process
Provides acquisition program oversight and support to the PEO
Reviews and concurs with ACAT IA Acquisition Program Baselines
Delegates MDA to PEO for ACAT III Programs Delegates MDA to CIO for
Special Interest Programs Assigns PEO responsibilities through the
One Book Process Approves service acquisitions to include IT
Provides CAE comments to DAES Reports Participates as a member of
the TEB Identifies PM reporting directly to the CAE Jointly
Identifies Special Interest IT Programs CAE Responsibilities IT
Acquisition Program Responsibilities
Slide 28
28 DT&E StatusDT&E Earned Value As of 6/11/04, Pass 2
is 99% complete with 4 remaining functional test cases The 4
functional Pass 2 test cases are as follows: OF: BW reports ECD of
6/18/04 FI: APVM ECD of 6/18/04 PL: DFU Hierarchy ECD 6/18/04 PR:
Awards in DPACS ECD of 6/15/04 Regression Testing is underway
without being impacted by these 4 test cases R2.0 Pass 2
Status
Slide 29
29 May 04Jun 04Jul 04Sep 04Oct 04Dec 04 R2.1.1 Suffix Code
Redesign Schedule Aug 04Nov 04 Design Detailed Functional Design
documentation for suffix code re- design, and partial cancellations
Technical Design documentation Internal and External Communications
Build Build RICE objects as outlined in Technical Designs Unit
testing Interface assembly testing with DAASC Develop test cases
Finalize cutover schedule Design and develop and relevant training
materials Internal and External Communications CDR Test System test
Regression Test Training Internal and External Communications TRR
ORR Cutover Kick off Design start 10 May Design end16 Jul CDR19 Jul
Build start19 Jul Build end1 Oct TRR4 Oct Test start4 Oct Test
end26 Nov ORR29 Nov Go Live1 Dec
Slide 30
30 Activity FY 2001 234 1234 FY 2002FY 2003FY 2004FY 2005FY
2006 1234123412341 Design/Build/Test System Demo (R 1.0) MILESTONE
C FRPDRFOC BSM Major Milestones BPR Business Process Setting
Revised BPR DESIGNBUILDTEST System Demo (R 2.0) Sys Configuration
ID- Baselines Sys Deployment TEST R 2.0 Test Cycle FOTE IPR
Critical Design Review DT/OA TRR R 1.1 I O C Sustainment
Audits/Tests/ Verification OA IOT&E DT R 1.0 R 2.1 R 2.2
ROLLOUTS BUILDDESIGN SRR R 1.1 Test Cycle DT DESIGNBUILDTEST SRR
ORR TRR CDR R 1.2/R 1.0 DPACS RETROFIT DESIGNBUILDTEST BUILDDESIGN
R 2.0 R 2.2 TEST BUILDDESIGN R 1.1 ROLLOUTS Design/Build/Test
System (R 2.2) Design/Build/Test System (R 2.1) System Demo (R 1.1)
BDU/DISMS R 2.1 Design/Build/Test System Demo (R 1.2/R 1.0 DPACS
RETROFIT) Design/Build/Test OA TRRCDRORR R 2.0 Reviews R 1.1
ReviewsR 1.0 Reviews/Test Cycle R 1.2/DPACs Test Cycle DT SRR ORR
TRR CDR R 1.2/DPACs Reviews R 2.2 Test Cycle DT/OA SRR ORR TRR CDR
R 2.2 Reviews R 2.1 Reviews CDR TRR ORR OA LIFE CYCLE SUPPORT 1234
OIPT IIPT R 2.1 Test Cycle P3I DT/OA As of: August 2004 Current BSM
Timeline