Page 1: System analysis and design project
Page 2: System analysis and design project

S.K.SOMAIYA COLLEGE OF ARTS , COMMERCE & SCIENCE Mumbai - 400077

Department of Computer Science

2006 - 2007

A project report of System Software Analysis and Design

Submitted in partial fulfillment for the degree of B.Sc (Computer Science) as prescribed by the University of Mumbai.

By:

MR ROHIT PUJARI&

MISS PRITHIKA DEVADIGA

Guide:

Prof. Aarti Naik (Dept. of Computer Science)

Page 3: System analysis and design project

ACKNOWLEDGEMENT.ACKNOWLEDGEMENT.

We would also like to thank Prof (Mrs.) Aarti Naik for guiding through the

entire project.

We would like to thank Mrs. Rama v who was most co-operative and

provided us with all the necessary information needed during the

development phase of the project.

Finally I would like to thank my family members, friends and all others who

had helped me during the software development stage.

Mr Rohit Pujari

MISS Prithika Devadiga

Page 4: System analysis and design project

PREFACE.PREFACE.

This report aims at introducing the various process involved in Child

Adoption Center like Registration of Parents & children, Verifying their Age,

Salary, Family members , Guarantor Info , stores details of Activities held

for children & also keep Information of Donation given to the trust .

This reports depicts only the basic logic used for the software

development along with flowcharts so that any render may understand the

logic applied.

The intricate details of the software have not been introduced in the

project. For further information, readers may refer to source code provided

along with this report

Though this report has been prepared with almost care, error may

remain and readers are requested to intimidate to the author.

Mr Rohit Pujari

MISS Prithika Devadiga

Page 5: System analysis and design project

INDEX.INDEX.

Sr.No. Topic Page No.

1 System Study and Analysis

2Current System and shortcomings of current

system

3 Scope of the proposed system

4 System Development

5 Gantt Chart

6 Event Table

7 Entity Relationship Diagram

8 Data Flow Diagrams

8.1 Context Diagram

8.2 DFD Fragments

8.3 Diagram 0

9 System Flowcharts

10 Menu Tree

11 Program List

12 Data Dictionary

12.1 Table List

12.2 View List

13 Report List

14 System Coding Conventions

15 System Control & Standards

16 System Testing

17 Program Documentation

18 Coding

19 Screen Layouts

20 Report Layouts

21 Conclusion

22 References

Page 6: System analysis and design project

CHAPTER NO:1

SYSTEM STUDY AND ANALYSIS

Page 7: System analysis and design project

SYSTEM STUDY AND ANALYSISSYSTEM STUDY AND ANALYSIS ..

Methodology:

The way that is followed while carrying on with the development

application is as follows:

Phase I (Defining a Problem):

Defining the problem is one of the important activities of the project.

The objective is to define precisely the problem to be solved & thereby

determine the scope of the new system. This phase consists of 2 main

tasks. The 1st task within this activity is to review the basic needs that

originally initiated the project. The 2nd task is to identify, at an abstract or

general level, the expected capabilities of the new system. Thus, it helps

us to define the goal to be achieved and the boundary of the system. A

clear understanding of the problem will help us build a better system &

reduce the risk of project failure. It also specifies the resources that have to

be made available to the project.

Three important factors project goal, project bounds & the resource

limit are sometimes called the project’s term of references.

The output of this phase consists of project goal, it’s bounds and

terms of reference.

Phase II (Feasibility Study):

The feasibility study proposes one or more conceptual solutions to

the problem set for the project. The objective in assessing feasibility is to

determine whether a development project has a reasonable chance of

success. It helps us to determine the input & output of the system. The

following are the criteria that are considered to confirm the project

feasibility.

Page 8: System analysis and design project

Technical Feasibility:

At first it is necessary to check that the proposed system

is technically feasible or not and to determine the technology

and skill necessary to carry out the project. If they are not

available then find out the solution to obtain them. Hardware is

already available in the college.

Operational Feasibility:

The operational feasibility is obtained by consulting with

the system users. Check that proposed solution satisfies the

users need or not.

Software details of the proposed system-

Front End:- Visual Basic 6.0

Back End:- Microsoft Access

Phase III (System Analysis):-

The phase is detailed appraisal of the existing system. This appraisal

includes how the system works and what it does. It also includes finding

out in more detail- what are the problems with the system and what user

requires from the new system or any new change in system.

The output of this phase results in the detail model of the system.

The model describes the system functions and data and system

information flow. The phase also contains the detail set of user

requirements and these requirements are used to set objectives for the

new system.

Page 9: System analysis and design project

System Study:--

It is always necessary to study and recognize the

problems of the existing system, which will help in finding out

the requirements for the new system. System study helps in

finding different alternatives for better solution.

The project study basically deals with different operations

and steps involved in it. It includes:

1) Data gathering

2) Study of existing system

3) Analyzing problem

4) Studying various documents

5) Feasibility study for further improvements

Following are the steps taken during the initial study:

Initially, we collected all the information, which they

wanted to store

Then we studied the working of the current system which

is done manually. We noted the limitations of that system

which motivated them to have a new system.

Then we analyzed the format of the reports generated by

that system.

With the help of these documents we got basic ideas about the

system as well as input and output of the developed Inventory

System.

Page 10: System analysis and design project

CHAPTER NO:2

CURRENT SYSTEM

AND

SHORTCOMINGS OF CURRENT SYSTEM

Page 11: System analysis and design project

CURRENT SYSTEM.CURRENT SYSTEM.

Initially the center was using the manual resources (small notebooks,

people) for the transaction involved in the system. This led more overheads

in maintaining the transaction manually.

It was a tedious job to log the daily activities of the work in a paper

like matching expectations of Parents with child.

It was difficult to maintain the details of the children, parent and the details

of the guarantor.

In order to avoid these manual details and to automate entire

process of various kinds of transactions carried out in the center this

software is developed.

Shortcomings of the current system:

The existing system has many drawbacks. Some of them to list are

as follows:

Manually matching Expectation of the Parents.

No security of data.

Various kind of registers were maintained to keep the

records

To check the records of past few years then register has

to be gone through to acquire the information.

Page 12: System analysis and design project

CHAPTER NO:3

PROPOSED SYSTEM

Page 13: System analysis and design project

Proposed System:

The proposed system is fully computerised and is developed using

Visual Basic (6.0) and Microsoft Access.

Advantages of the proposed system:

Lot of time is getting saved.

Details of the Children, Parents, Guarantors and Sponsorer can

be saved in the database.

It is possible to easily retrieve information about data which is

as long as 10 years old or more (depends on the hard-disk

space you have in our system)

Limitations of the proposed system:

Children age should between one & eight year

Only single child can be adopted by a parent

There can be a single guarantor for a Parent

Parents Annual Income should be more than one lakh

SCOPE OF PROPOSED SYSTEM.

Page 14: System analysis and design project

The first task was in identifying what part of the system is to be

computerized. Some analysis and projection was done. Initially investment

would be only to impart on the software and the hardware.

The system is simple without complexities.

The child adoption process deals with the following aspects

Accepting the details from the sponsorer & donors.

Maintaining and updating the details of the child & Parent.

Maintain the database of the Children , Parent , Guarantors .

Automatic Matching Of Expectation of the Parent about

child.

Maintaining the records of the Adopted Children with their

Parents and related guarantor.

System is developed in Microsoft Access as backend and Visual Basic 6.0

as front-end. It will provide:

1. More user friendly since visual basic-6.0 is best GUI.

2. Minimization of redundancy in well maintained data.

3. Maximum Data security.

4. Achieve facility.

Page 15: System analysis and design project
Page 16: System analysis and design project

CHAPTER NO:5

GANTT CHART

Page 17: System analysis and design project
Page 18: System analysis and design project
Page 19: System analysis and design project

CHAPTER NO:6

EVENT TABLE

Event Trigger Source Activity Response Destination

Registration of Child

VerificationOf Age of child

Hospital / Police

Store details of

Child

Child Registratio

n No. is given

Child

Request for

Parent

Registratio

n

VerificationOf Information

Parent Store details of

Parent

Parent Registratio

n No. is given

Parent

Registratio

n Of

Guarantor

VerificationOf Information

Guarantor

Store informatio

nOf

Guarantor

Parent Number is

given

Guarantor

Child Adopt

ion

Verification Child & Parent

Information

Trust Store Child & Parent

information

Parent

Registratio

n Of

Donat

Verification of Modes of Payment

Donor Donation is accepted

& store details

Receipt is given

Donor

Page 20: System analysis and design project

or

Page 21: System analysis and design project

CHAPTER NO:6

ENTITY RELATIONSHIP DIAGRAM

Page 22: System analysis and design project
Page 23: System analysis and design project

CHAPTER NO:6

DATA FLOW DIAGRAM

Page 24: System analysis and design project

8.1 CONTEXT DIAGRAM

Parent

Trust

Parent request

Parent registration No. / denied

Hospital / Police

Child Register No. Child

0 Child-Adoption System

Page 25: System analysis and design project

8.2 DFD FRAGMENTS

1.2Records Non-Adopted Child

Child 1.1Checking age of child

Parent

2.1 Verify Eligibility

2.2Registration of Guarantor

2.3Record of Parents Expectation

Child History

Child Info

Parent Info

Guarantor Info

Guarantor Info

Expectation

Trust

3.1Record details of Adopted Children

3.2Update Child Record & parent Record

4.1 Donor’s Registration

4.2Accepting Payment & Giving Receipt Number.

AdopCInfo

Child Record

PCInfo

Donor Info

Page 26: System analysis and design project

8.3 DIAGRAM ZERO

Child

1Child Register

Child Info

Parent 2Parent Register

Parent Info

Guarantor Info

Expectation

Trust

5Activity Info

4Donator Info

Adopted Child Info

Expectation

Donation Info

Activities Info

3Child Adoption System

Child Info

Parent Info

Guarantor Info

Page 27: System analysis and design project

PROGRAM DOCUMENTATION

Program Name: Login Form

Program Id: Form No. 1

File Name: frmLogin.frm

Program Function Explanation:

This form is basically used to authenticate the users before

using the System.

Data Entry Screen:

In this form first the user is allowed to enter the username and

then the password. Then the OK button is pressed and the form is

submitted for validation. If the username and password are correct

then the user is allowed to use the system otherwise the user is not

allowed to use the system.

Program Name: Main Menu form

Program Id: Form No. 2

Page 28: System analysis and design project

File Name: MDIForm1.frm

Program Function Explanation:

This form shows the form, which contains the main menus

through which the system can be operated. The main menu further

contains the sub menus that allow the user to enter various details or view

the reports.

Data Entry Screen:

In this form first the user is allowed to select the required

menu, from which the user can select the sub menus using which the user

can explore the system. The menus contain utilities such as adding,

updating, deleting dealers, customers and employee information. It also

provide to insert record of product purchased, store details of product

manufactured by the employee and sales it to the customers. Then the

appropriate form is selected and the necessary actions are taken.

Program Name: Dealers Record Adding form.

Program Id: Form No. 3

File Name: frmdealerinfo.frm

Program Function Explanation:

User1, 01/03/-1,
user cannot enter data in sub-menu
User1, 01/03/-1,
Fragment, consider revising.
Page 29: System analysis and design project

This form is basically used to accept the dealer’s information

such as their name, address, sex, mobile number and phone number.

Data Entry Screen:

In this form the user is allowed to enter the required

information and then submit the form. Then the form is validated. If the

entered details are correct and valid then the dealer information is stored

in the system’s database otherwise the form is sent back for corrections.

Program Name: Dealer Record Updating or deleting form

Program Id: Form No. 4

File Name: frmsearch.frm

Program Function Explanation:

This form provides the details of various dealers in a grid in

which the user can select a particular field of a grid to update or delete the

User1, 01/03/-1,
Dealer is a living thing, replace ‘it’ with ‘their’
Page 30: System analysis and design project

details of dealers. This form also contains a list of dealers ids in a combo

box from which the user can select a one which has to be updated or

deleted.

Data Entry Screen:

In this form the details of all the dealers are provided in a grid,

which is a non-updateable grid. Therefore, to update or delete a

particular dealer’s record the user has a select a particular row of a

grid by double-clicking the grid and a form opens up which displays

all the details of that particular dealer to update or delete. User can

then enter the required information to update the details. The

inputted values are checked by the system and any invalid entry will

send the form back for correction.

Program Name: Customers Record Adding form.

Program Id: Form No. 5

File Name: Garment.frm

Program Function Explanation:

This form is basically used to accept the customers’

information such as their name, address, sex, mobile number and phone

number.

Data Entry Screen:

Page 31: System analysis and design project

In this form the user is allowed to enter the required

information and then submit the form. Then the form is validated. If the

entered details are correct and valid then the dealers’ information is stored

in the system’s database otherwise the form is sent back for corrections.

Program Name: Customer Record Updating or deleting form

Program Id: Form No. 6

File Name: frmsearch.frm

Program Function Explanation:

This form provides the details of various customers in a grid in

which the user can select a particular field of a grid to update or delete the

records of customer. This form also contains a list of customer ids in a

combo box from which the user can select a one which has to be updated

or deleted.

Page 32: System analysis and design project

Data Entry Screen:

In this form the details of all the customers are provided in a

grid, which is a non-updateable grid. Therefore, to update or delete a

particular customer record the user has a select a particular row of a grid

by double- clicking the grid and a form opens up which displays all the

details of that particular customer to update or delete. User can then enter

the required information to update the details. The inputted values are

checked by the system and any invalid entry will send the form back for

correction

Page 33: System analysis and design project

Program Name: Employee Record Adding form.

Program Id: Form No. 7

File Name: frmdealerinfo.frm

Program Function Explanation:

This form is basically used to accept the Employees information

such as their name, address, sex, mobile number and phone number.

Data Entry Screen:

In this form the user is allowed to enter the required

information and then submit the form. Then the form is validated. If the

entered details are correct and valid then the employee’s information is

stored in the system’s database otherwise the form is sent back for

corrections.

Program Name: Employee Record Updating or deleting form

Page 34: System analysis and design project

Program Id: Form No. 8

File Name: frmsearch.frm

Program Function Explanation:

This form provides the details of various employees, in a grid in

which the user can select a particular field of a grid to update or delete the

details of employee. This form also contains a list of Employee ids in a

combo box from which the user can select a one which has to be updated

or deleted.

Data Entry Screen:

In this form the details of all the employees are provided in a

grid, which is a non-updateable grid. Therefore, to update or delete a

particular employee record the user has a select a particular row of a grid

by double- clicking the grid and a form opens up which displays all the

details of that particular dealer to update or delete. User can then enter

the required information to update the details. The inputted values are

checked by the system and any invalid entry will sent the form back for

correction.

Program Name: Purchasing Detail Form.

Program Id: Form No. 9

File Name: frmpurchasingdetails.frm

Program Function Explanation:

Page 35: System analysis and design project

This form is basically used to insert the records of the products

supplied by the supplier.

Data Entry Screen:

In this form the details of the product supplied by the supplier

is entered and the form is submitted. Then the form is validated. If the

entered details are correct and valid then the product detail is stored in the

system’s database otherwise the form is sent back for corrections.

Program Name: Expenses Form.

Program Id: Form No. 10

File Name: frmexpenses.frm

Program Function Explanation:

This form is basically used to insert the records of the expenses

incurred in the company.

Page 36: System analysis and design project

Data Entry Screen:

In this form the various expenses incurred in the industry are

entered and the form is submitted. Then the form is validated. If the

entered details are correct and valid then the details are stored in the

system’s database otherwise the form is sent back for corrections.

Program Name: Salary Form.

Program Id: Form No. 11

File Name: frmsalarydetails.frm

Program Function Explanation:

This form is basically used to insert the records about the work

done by the employee on a particular day i.e. this form maintains the

details about work done by the employee on particular kind of the product.

It also keeps track of the amount of work given to the employee and their

Page 37: System analysis and design project

previous pending stock. On basis of these details salary of the employee is

calculated.

Data Entry Screen:

In this form the various details such as employee id, date of

work, product on which he has worked, number of cutting pieces given to

him, ready stock details etc are entered. Also the salary of the employee is

calculated based on the rate of his work. Then the form is validated. If the

entered details are correct and valid then the details are stored in the

system’s database otherwise the form is sent back for corrections. There is

a calculate button provided in the form which when clicked opens another

form wherein user can calculate the salary based on the monthly bases,

weekly bases or based on number of days the employee has worked

Program Name: Reorder Form.

Program Id: Form No. 12

File Name: frmreorder.frm

Program Function Explanation:

This form is basically used to set the reorder level and the

sales rate of the products manufactured. It is only after entry being made

in this form the products are available for sale in the market.

Data Entry Screen:

In this form the various product details are entered and their

reorder level and sales rate is set. Then the form is validated. If the

Page 38: System analysis and design project

entered details are correct and valid then the details are stored in the

system’s database otherwise the form is sent back for corrections.

Program Name: Sales details Form.

Program Id: Form No. 13

File Name: frmsalesdetails.frm

Program Function Explanation:

This form is basically used to insert the details about the sale

carried out in the shop. It is only after entry being made in this form the

products are available for sale in the market. There is facility for automatic

bill generation in the form itself.

Data Entry Screen:

In this form the various sales details such as sale is made to

which customer and what amount is given by the customer for that

product, even the customer can purchase goods on the basis of credit but

Page 39: System analysis and design project

his records are saved and every time the customer makes another visit the

sales person is notified by the system about his balance remaining. Then

the form is validated. If the entered details are correct and valid then the

details are stored in the system’s database otherwise the form is sent back

for corrections.

Program Name: Products Form.

Program Id: Form No. 14

File Name: product.frm

Program Function Explanation:

This form is basically used to insert the details about the

various kinds of products purchased by the user. This forms appears as a

pop-up form in the Sales Details form

Data Entry Screen:

In this form the customer identification number is displayed

automatically on the form and here the entry for products purchased is

entered. After each entry the details are validated and if valid then the

Page 40: System analysis and design project

details are stored in the system’s database otherwise the form is sent back

for corrections. After each successful entry the question pops-up that if the

user has made any more purchases. Sales person may select appropriate

option.

Conclusion

The quality and reliability of the software depends on the result of phases in the system development. The software quality includes the modularity, good documentation, user friendliness, maintainability etc.

The software reliability depends on the less chances of failure and enhancements in the system even in stressed situations.

As far as my developed system is concerned, we have tried to make the system as user friendly as possible where a layman can handle the system very comfortably.

During detail design the system is designed into modules so, it is easy to understand and helpful to the management.

Suggestions for Future :

Page 41: System analysis and design project

The system is developed by keeping in mind the present conditions and rules. If there are changes in the rules and conditions , system needs maintenance according to the changes.

22 References

Mastering Visual Basic 6.0 by Evangelous Petroutsos

System Analysis and design in the changing world (2000) by Satzinger

Software Engineering-A Practitioners Approach by Roger Pressman

System Analysis and Design methods (1998) by Whitten and Bentley

Page 42: System analysis and design project