Married Accommodation Project Phase II Jalandhar Cantt SYNOPSIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR Six Month Industrial Training At NKG Infrastructure Ltd ,Jalandhar Cantt (From 31 st July 2014 to 31 st Nov. 2014) SUBMITTED BY Ram Kakkar D4CE2 110147 1283931 Civil Engineering Department GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA, INDIA
36
Embed
Synopsis for insustrial training of Civil engineering
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Married Accommodation ProjectPhase II Jalandhar Cantt
SYNOPSIS
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FORSix Month Industrial Training
At
NKG Infrastructure Ltd ,Jalandhar Cantt(From 31st July 2014 to 31st Nov. 2014)
SUBMITTED BY Ram Kakkar
D4CE2110147
1283931
Civil Engineering Department GURU NANAK DEV ENGINEERING COLLEGE
LUDHIANA, INDIA
Introduction to Company
NKG Infrastructure is a construction company in India, with expertise in theexecution and construction of infrastructure projects. Governed by a highlyqualified Board of Directors, the company deploys over 1,456 employees including412 professionals across its network of branches and work-sites. The company hasstrong construction capabilities and is empanelled with leading developmentalorganizations including National Highway Authority of India.
The company has capabilities in construction of roads, bridges,electrification network including erection of power substations, institutional andresidential buildings, and potable water and drainage lines. Certain major projectssuccessfully completed by us since our inception include widening of the Noida-Greater Noida Highway, Noida, Uttar Pradesh and strengthening of the Raj NagarZonal Road, under the ‘Raj Nagar Scheme’, Ghaziabad, Uttar Pradesh. NKGInfrastructure takes pride in executing challenging projects that involve specialskills, personnel, equipments and material. A dedicated and competent team ofplanners, designers and construction engineers enables it to optimize resources anddeliver quality infrastructure to its customers with cost and time advantages.
Recognitions & Awards :
NKG Infrastructure’s technical and project execution capabilities have been wellrecognized by various Governmental Bodies, Global Institutions and leadingInfrastructure Developers of India which is reflected in form of awards,empanelment and certifications. Some of them are:
Registered 'Grade A' Contractor with various State Government &Departments etc.
Chairman of the Company, Mr. N. K. Garg being conferred ‘UDYOGRATTAN’ award by ‘Institute of Economic Studies’ in September, 2007.
3rd CIDC Vishwakarma Award 2011 for the Best Professionally ManagedCompany, having turnover exceeding Rs. 1000 Crores from ConstructionIndustry Development Council – the apex body established by the PlanningCommission of India and the Construction Industry.
Accreditation of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007. Registration of NKG Infrastructure’s Logo under Trade Mark Act and
Copyright Act.
Management :
Mr. Naresh Kumar Garg; ChairmanHaving incepted NKG Infrastructure in 1989, Mr. N.K. Garg is the key architect ofits evolution as a professionally run company . He has over 30 years of experiencein construction business and has been responsible for strategic direction anddevelopment of our Company in relation to major construction projects of ourCompany.
Mr. Pradeep Kumar Garg; Managing Director A law graduate and a fellow member of Institute of 1Chartered Accountants ofIndia, Mr. Pradeep Kumar Garg has 19 years of experience in the constructionbusiness. As a key financial expert, his participation in arrangement offunds/working capital, cost analysis of the projects together with the exploration ofnewer avenues of investment is instrumental in the growth of the company.
Mr. Devendra Kumar Garg; Joint Managing Director Mr. D.K. Garg has been involved in the management of the Company ever since itsinception and has played an active role in its development. With almost 30 years ofexperience, he is the key person behind the execution of the company’s projects.
Mr. Rakesh Kumar; Executive DirectorMr. Kumar has over 22 years of experience in corporate finance, budgeting, systemimplementation and administration with various corporations such as the GujaratCo-operative Milk Federation Ltd. (Amul), Paradeep Phosphate Ltd. and TriveniStructures Ltd. Mr. Kumar is a commerce graduate and associate member of theInstitute of Cost & Works Accountants of India.
Introduction to Project
The company has get the tender from SNC Lavalin Infra. Ltd., Nodal for theconstruction of Military Engineering Services flats. at Jalandhar Cantt andAdampur. Thus the Project has been divided into various parts known as pocketsand Main office in Pocket G and our construction site is also in Pocket G. In thispocket there are twenty two Blocks and each block consists of G+6 storeybuilding.
Contracting Model (Conventional Contract / General Contract / Design & Build)
General Contract
Pricing Model (Lump Sum / Item Rate /Cost Plus / Others-Specify)
Lump Sum
Total Value of Project (in Crores) 340
Date of Commencement Jan. 2009 Date of Completion
Name of Pocket G
No of Block 22
Storey G+6
Area of Block 5000sq ft.
For the proper continuation and execution of work responsibilities are divided intoa number of departments at site. These are controlled and inspected by each otherand depend on each other. This helps to maintain the continuity of work and alsomaintains the quality of work executed. These departments are:
1) Administration2) Planning department3) Execution department4) Quality Control and Quality Assurance 5) Billing department6) Site safety department7) PMV department
Site coordination process and responsibility matrix:
1) Mixer Plant: Mixer plant provide the facility to mix the various ingredients ofconcrete in required proportions at the in order to fufill the quantities of concreteand without more lead distance.
2) Transit Mixer:It is used to transport the concrete from the place of production to the site. Itscapacity is 6 cumecs and it revolves at a rate of 7 rpm while transportation.
3) Boom Placer: It is used to lift material from the bottom and take it to the heights of building which would have been very difficult by labour.
4) Needle Vibrator: The Needle Vibrator, also known as immersion or pokervibrator have a power unit and long flexible tube at the end of which a vibratinghead is attached. Wherever compaction is to be done, the vibrating head is insertedin the concrete.
5) Tilted Drum Mixer : A concrete mixer (also commonly called a cement mixer)is a device that homogeneously combines cement, aggregate such as sand orgravel, and water to form concrete. For smaller volume works portable concretemixers are often used so that the concrete can be made at the construction site,giving the workers ample time to use the concrete before it hardens.
6) Bar Straighter Machine: This machine is used for cutting the bar as perrequirement in large quantities. The machine can done the operation of cutting upto12mm dia. and for bar having dia greater than 12mm than Bar Cutter is used.
7) Concrete Pump: Concrete pump are used when large quantity of concrete is tobe transported continuously when Boom placer is not in working position cannotbe installed at site.
8) JCB Excavator:- Excavators are heavy construction equipment consisting of aboom, stick, bucket and cab on a rotating platform (known as the "house"). Thehouse sits atop an undercarriage with tracks or wheels. A cable-operated excavatoruses winches and steel ropes to accomplish the movements. They are a naturalprogression from the steam shovels and often called power shovels.
9) Cranes :- These are used taking off heavy objects and also to transport them from one to other place at the site.
ROLE AS A TRAINEE IN THE FIRM:
During my training, I look forward to learn as much as I can about the practical
application of all the concepts I have studied in Civil Engineering so far.
As a trainee my role is as follows:
To properly study and understand the various drawings of reinforcement,
concreting of foundations, columns, slabs & beams. The ways and methods to construct and check the various components of
the structure such as that of a foundation, slab, beam and column etc. To become accustomed with the machinery involved in construction like
batching plants, concrete pumps, load cells, excavators etc. To make daily report of the work done at the site for the daily Diary. To learn the basic tips and tricks of everyday on-site work like managing labour
and overcoming any obstacles faced during everyday construction.
Ram Kakkar
Married Accommodation ProjectPhase II Jalandhar Cantt
SYNOPSIS
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR
Six Month Industrial Training
At
NKG Infrastructure Ltd ,Jalandhar Cantt(From 31st July 2014 to 31st Nov. 2014)
SUBMITTED BY Suraj Kakkar
D4CE2110152
1283939
Civil Engineering Department GURU NANAK DEV ENGINEERING COLLEGE
LUDHIANA, INDIA
Introduction to Company
NKG Infrastructure is a construction company in India, with expertise in theexecution and construction of infrastructure projects. Governed by a highlyqualified Board of Directors, the company deploys over 1,456 employees including412 professionals across its network of branches and work-sites. The company hasstrong construction capabilities and is empanelled with leading developmentalorganizations including National Highway Authority of India.
The company has capabilities in construction of roads, bridges,electrification network including erection of power substations, institutional andresidential buildings, and potable water and drainage lines. Certain major projectssuccessfully completed by us since our inception include widening of the Noida-Greater Noida Highway, Noida, Uttar Pradesh and strengthening of the Raj NagarZonal Road, under the ‘Raj Nagar Scheme’, Ghaziabad, Uttar Pradesh. NKGInfrastructure takes pride in executing challenging projects that involve specialskills, personnel, equipments and material. A dedicated and competent team ofplanners, designers and construction engineers enables it to optimize resources anddeliver quality infrastructure to its customers with cost and time advantages.
Recognitions & Awards :
NKG Infrastructure’s technical and project execution capabilities have been wellrecognized by various Governmental Bodies, Global Institutions and leadingInfrastructure Developers of India which is reflected in form of awards,empanelment and certifications. Some of them are:
Registered 'Grade A' Contractor with various State Government &Departments etc.
Chairman of the Company, Mr. N. K. Garg being conferred ‘UDYOGRATTAN’ award by ‘Institute of Economic Studies’ in September, 2007.
3rd CIDC Vishwakarma Award 2011 for the Best Professionally ManagedCompany, having turnover exceeding Rs. 1000 Crores from ConstructionIndustry Development Council – the apex body established by the PlanningCommission of India and the Construction Industry.
Accreditation of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007. Registration of NKG Infrastructure’s Logo under Trade Mark Act and
Copyright Act.
Management :
Mr. Naresh Kumar Garg; ChairmanHaving incepted NKG Infrastructure in 1989, Mr. N.K. Garg is the key architect ofits evolution as a professionally run company . He has over 30 years of experiencein construction business and has been responsible for strategic direction anddevelopment of our Company in relation to major construction projects of ourCompany.
Mr. Pradeep Kumar Garg; Managing Director A law graduate and a fellow member of Institute of 1Chartered Accountants ofIndia, Mr. Pradeep Kumar Garg has 19 years of experience in the constructionbusiness. As a key financial expert, his participation in arrangement offunds/working capital, cost analysis of the projects together with the exploration ofnewer avenues of investment is instrumental in the growth of the company.
Mr. Devendra Kumar Garg; Joint Managing Director Mr. D.K. Garg has been involved in the management of the Company ever since itsinception and has played an active role in its development. With almost 30 years ofexperience, he is the key person behind the execution of the company’s projects.
Mr. Rakesh Kumar; Executive DirectorMr. Kumar has over 22 years of experience in corporate finance, budgeting, systemimplementation and administration with various corporations such as the GujaratCo-operative Milk Federation Ltd. (Amul), Paradeep Phosphate Ltd. and TriveniStructures Ltd. Mr. Kumar is a commerce graduate and associate member of theInstitute of Cost & Works Accountants of India.
Introduction to Project
The company has get the tender from SNC Lavalin Infra. Ltd., Nodal for theconstruction of Military Engineering Services flats. at Jalandhar Cantt andAdampur. Thus the Project has been divided into various parts known as pocketsand Main office in Pocket G and our construction site is also in Pocket G. In thispocket there are twenty two Blocks and each block consists of G+6 storeybuilding.
Contracting Model (Conventional Contract / General Contract / Design & Build)
General Contract
Pricing Model (Lump Sum / Item Rate /Cost Plus / Others-Specify)
Lump Sum
Total Value of Project (in Crores) 340
Date of Commencement Jan. 2009 Date of Completion
Name of Pocket G
No of Block 22
Storey G+6
Area of Block 5000sq ft.
For the proper continuation and execution of work responsibilities are divided intoa number of departments at site. These are controlled and inspected by each otherand depend on each other. This helps to maintain the continuity of work and alsomaintains the quality of work executed. These departments are:
8) Administration9) Planning department10) Execution department11) Quality Control and Quality Assurance 12) Billing department13) Site safety department14) PMV department
Site coordination process and responsibility matrix:
1) Mixer Plant: Mixer plant provide the facility to mix the various ingredients ofconcrete in required proportions at the in order to fufill the quantities of concreteand without more lead distance.
2) Transit Mixer:It is used to transport the concrete from the place of production to the site. Itscapacity is 6 cumecs and it revolves at a rate of 7 rpm while transportation.
3) Boom Placer: It is used to lift material from the bottom and take it to the heights of building which would have been very difficult by labour.
4) Needle Vibrator: The Needle Vibrator, also known as immersion or pokervibrator have a power unit and long flexible tube at the end of which a vibratinghead is attached. Wherever compaction is to be done, the vibrating head is insertedin the concrete.
5) Tilted Drum Mixer : A concrete mixer (also commonly called a cement mixer)is a device that homogeneously combines cement, aggregate such as sand orgravel, and water to form concrete. For smaller volume works portable concretemixers are often used so that the concrete can be made at the construction site,giving the workers ample time to use the concrete before it hardens.
6) Bar Straighter Machine: This machine is used for cutting the bar as perrequirement in large quantities. The machine can done the operation of cutting upto12mm dia. and for bar having dia greater than 12mm than Bar Cutter is used.
7) Concrete Pump: Concrete pump are used when large quantity of concrete is tobe transported continuously when Boom placer is not in working position cannotbe installed at site.
8) JCB Excavator:- Excavators are heavy construction equipment consisting of aboom, stick, bucket and cab on a rotating platform (known as the "house"). Thehouse sits atop an undercarriage with tracks or wheels. A cable-operated excavatoruses winches and steel ropes to accomplish the movements. They are a naturalprogression from the steam shovels and often called power shovels.
9) Cranes :- These are used taking off heavy objects and also to transport them from one to other place at the site.
ROLE AS A TRAINEE IN THE FIRM:
During my training, I look forward to learn as much as I can about the practical
application of all the concepts I have studied in Civil Engineering so far.
As a trainee my role is as follows:
To properly study and understand the various drawings of reinforcement,
concreting of foundations, columns, slabs & beams. The ways and methods to construct and check the various components of
the structure such as that of a foundation, slab, beam and column etc. To become accustomed with the machinery involved in construction like
batching plants, concrete pumps, load cells, excavators etc. To make daily report of the work done at the site for the daily Diary. To learn the basic tips and tricks of everyday on-site work like managing labour
and overcoming any obstacles faced during everyday construction.
Suraj Kakkar
Married Accommodation ProjectPhase II Jalandhar Cantt
SYNOPSIS
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR
Six Month Industrial Training
At
NKG Infrastructure Ltd ,Jalandhar Cantt(From 31st July 2014 to 31st Nov. 2014)
SUBMITTED BY Simranjit Singh
D4CE2110078
Civil Engineering Department GURU NANAK DEV ENGINEERING COLLEGE
LUDHIANA, INDIA
Introduction to Company
NKG Infrastructure is a construction company in India, with expertise in theexecution and construction of infrastructure projects. Governed by a highlyqualified Board of Directors, the company deploys over 1,456 employees including412 professionals across its network of branches and work-sites. The company hasstrong construction capabilities and is empanelled with leading developmentalorganizations including National Highway Authority of India.
The company has capabilities in construction of roads, bridges,electrification network including erection of power substations, institutional andresidential buildings, and potable water and drainage lines. Certain major projectssuccessfully completed by us since our inception include widening of the Noida-Greater Noida Highway, Noida, Uttar Pradesh and strengthening of the Raj NagarZonal Road, under the ‘Raj Nagar Scheme’, Ghaziabad, Uttar Pradesh. NKGInfrastructure takes pride in executing challenging projects that involve specialskills, personnel, equipments and material. A dedicated and competent team ofplanners, designers and construction engineers enables it to optimize resources anddeliver quality infrastructure to its customers with cost and time advantages.
Recognitions & Awards :
NKG Infrastructure’s technical and project execution capabilities have been wellrecognized by various Governmental Bodies, Global Institutions and leadingInfrastructure Developers of India which is reflected in form of awards,empanelment and certifications. Some of them are:
Registered 'Grade A' Contractor with various State Government &Departments etc.
Chairman of the Company, Mr. N. K. Garg being conferred ‘UDYOGRATTAN’ award by ‘Institute of Economic Studies’ in September, 2007.
3rd CIDC Vishwakarma Award 2011 for the Best Professionally ManagedCompany, having turnover exceeding Rs. 1000 Crores from ConstructionIndustry Development Council – the apex body established by the PlanningCommission of India and the Construction Industry.
Accreditation of ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007. Registration of NKG Infrastructure’s Logo under Trade Mark Act and
Copyright Act.
Management :
Mr. Naresh Kumar Garg; ChairmanHaving incepted NKG Infrastructure in 1989, Mr. N.K. Garg is the key architect ofits evolution as a professionally run company . He has over 30 years of experiencein construction business and has been responsible for strategic direction anddevelopment of our Company in relation to major construction projects of ourCompany.
Mr. Pradeep Kumar Garg; Managing Director A law graduate and a fellow member of Institute of 1Chartered Accountants ofIndia, Mr. Pradeep Kumar Garg has 19 years of experience in the constructionbusiness. As a key financial expert, his participation in arrangement offunds/working capital, cost analysis of the projects together with the exploration ofnewer avenues of investment is instrumental in the growth of the company.
Mr. Devendra Kumar Garg; Joint Managing Director Mr. D.K. Garg has been involved in the management of the Company ever since itsinception and has played an active role in its development. With almost 30 years ofexperience, he is the key person behind the execution of the company’s projects.
Mr. Rakesh Kumar; Executive DirectorMr. Kumar has over 22 years of experience in corporate finance, budgeting, systemimplementation and administration with various corporations such as the GujaratCo-operative Milk Federation Ltd. (Amul), Paradeep Phosphate Ltd. and TriveniStructures Ltd. Mr. Kumar is a commerce graduate and associate member of theInstitute of Cost & Works Accountants of India.
Introduction to Project
The company has get the tender from SNC Lavalin Infra. Ltd., Nodal for theconstruction of Military Engineering Services flats. at Jalandhar Cantt andAdampur. Thus the Project has been divided into various parts known as pocketsand Main office in Pocket G and our construction site is also in Pocket G. In thispocket there are twenty two Blocks and each block consists of G+6 storeybuilding.
Contracting Model (Conventional Contract / General Contract / Design & Build)
General Contract
Pricing Model (Lump Sum / Item Rate /Cost Plus / Others-Specify)
Lump Sum
Total Value of Project (in Crores) 340
Date of Commencement Jan. 2009 Date of Completion
Name of Pocket G
No of Block 22
Storey G+6
Area of Block 5000sq ft.
For the proper continuation and execution of work responsibilities are divided intoa number of departments at site. These are controlled and inspected by each otherand depend on each other. This helps to maintain the continuity of work and alsomaintains the quality of work executed. These departments are:
15) Administration16) Planning department17) Execution department18) Quality Control and Quality Assurance 19) Billing department20) Site safety department21) PMV department
Site coordination process and responsibility matrix:
1) Mixer Plant: Mixer plant provide the facility to mix the various ingredients ofconcrete in required proportions at the in order to fufill the quantities of concreteand without more lead distance.
2) Transit Mixer:It is used to transport the concrete from the place of production to the site. Itscapacity is 6 cumecs and it revolves at a rate of 7 rpm while transportation.
3) Boom Placer: It is used to lift material from the bottom and take it to the heights of building which would have been very difficult by labour.
4) Needle Vibrator: The Needle Vibrator, also known as immersion or pokervibrator have a power unit and long flexible tube at the end of which a vibratinghead is attached. Wherever compaction is to be done, the vibrating head is insertedin the concrete.
5) Tilted Drum Mixer : A concrete mixer (also commonly called a cement mixer)is a device that homogeneously combines cement, aggregate such as sand orgravel, and water to form concrete. For smaller volume works portable concretemixers are often used so that the concrete can be made at the construction site,giving the workers ample time to use the concrete before it hardens.
6) Bar Straighter Machine: This machine is used for cutting the bar as perrequirement in large quantities. The machine can done the operation of cutting upto12mm dia. and for bar having dia greater than 12mm than Bar Cutter is used.
7) Concrete Pump: Concrete pump are used when large quantity of concrete is tobe transported continuously when Boom placer is not in working position cannotbe installed at site.
8) JCB Excavator:- Excavators are heavy construction equipment consisting of aboom, stick, bucket and cab on a rotating platform (known as the "house"). Thehouse sits atop an undercarriage with tracks or wheels. A cable-operated excavatoruses winches and steel ropes to accomplish the movements. They are a naturalprogression from the steam shovels and often called power shovels.
9) Cranes :- These are used taking off heavy objects and also to transport them from one to other place at the site.
ROLE AS A TRAINEE IN THE FIRM:
During my training, I look forward to learn as much as I can about the practical
application of all the concepts I have studied in Civil Engineering so far.
As a trainee my role is as follows:
To properly study and understand the various drawings of reinforcement,
concreting of foundations, columns, slabs & beams. The ways and methods to construct and check the various components of
the structure such as that of a foundation, slab, beam and column etc. To become accustomed with the machinery involved in construction like
batching plants, concrete pumps, load cells, excavators etc. To make daily report of the work done at the site for the daily Diary. To learn the basic tips and tricks of everyday on-site work like managing labour
and overcoming any obstacles faced during everyday construction.