ALL FIRE SPRINKLER PIPING SHALL BE CONCEALED ABOVE CEILING OR IN SPRINKLER CONTRACTOR SHALL COORDINATE SPRINKLER HEAD INSTALLATION WITH NEW LIGHTING AND DIFFUSER LOCATIONS. ALL SPRINKLER HEADS SHALL BE PLACED IN THE CENTER OF ALL CEILING TILES WHERE NEW CEILING TILES ARE LOCATED. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY CONTRACTOR AT THE SITE. REQUIREMENTS. PIPE SIZING SHALL BE BY HYDRAULIC CALCULATION. INSTALLATIONS SHALL CONFORM TO NFPA AND INSURANCE UNDERWRITER OF WORK AND SPECIFICATIONS. ALL SPRINKLER SYSTEM COMPONENT WALLS, WHERE POSSIBLE. 3. 5. 4. 2. SUPPRESSION INSTALLATION AS PER THE INTENT OF THE PROJECT SCOPE RESPONSIBLE TO PROVIDE ALL COMPONENTS FOR A COMPLETE FIRE REVIEW AND INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS SPRINKLER SYSTEM COMPONENTS ARE INDICATED ON THE DRAWING FOR FIRE PROTECTION GENERAL NOTES 1. QUICK RESPONSE UPRIGHT SPRINKLER HEAD (SP) ON DRAWING AND NOTE NUMBER INDICATES NOTE LOCATED ELSEWHERE QUICK RESPONSE DRY PIPE SPRINKLER HEAD (SP) FUNNEL DRAIN GENERAL CONTRACTOR HEATING CONTRACTOR HC CAP OR PLUG CHECK VALVE GATE OR GLOBE VALVE BALANCING COCK OS & Y SUPERVISED VALVE FNL DR GC CLG BLW ABV CEILING BELOW ABOVE QUICK RESPONSE SEMI-RECESSED PENDENT FIRE PROTECTION SYMBOL AND ABBREVIATION SCHEDULE FIRE STANDPIPE LINE (F) F FIRE SPRINKLER LINE (FS) FS SPRINKLER HEAD (SP) QUICK RESPONSE SIDEWALL SPRINKLER HEAD (SP) QUICK RESPONSE UPRIGHT SPRINKLER HEAD BELOW OBSTRUCTION (SP) FIRE DEPARTMENT CONNECTION XX FIRE SPRINKLER WATER DEMAND SEE SCHEDULE .10 GPM/SQ FT SEE SCHEDULE CATEGORY 2 GUEST ROOMS AND PUBLIC AREAS SPRINKLER TEMPERATURE RATING: SEE SCHEDULE SPRINKLER SCHEDULE: EXCEPT AS INDICATED BELOW: ROOM/SPACE $// 635,1./(5 +($'6 6+$// %( 48,&.5(63216( ) 72 ) 6(0,5(&(66(' 7<3( QUICK RESPONSE, CORROSION RESISTANT SPRINKLER TYPE MECHANICAL/ELECTRICAL ROOMS ELEVATOR MACHINERY SWIMMING POOLS QUICK RESPONSE QUICK RESPONSE TEMPERATURE RATING ) ) 72 ) ) 1. FIRE SPRINKLER WATER DEMAND INDICATED ABOVE PENDING INSURANCE UNDERWRITER NOTE: AND AUTHORITY HAVING JURISDICTION APPROVAL. HOSE STREAM ALLOWANCE: SPRINKLER HEAD TYPE: SPRINKLER 'K' FACTOR: 250 GPM K=5.6 SEE SCHEDULE 100 GPM K=5.6 BACK OF HOUSE AREAS DESIGN AREA OF WATER APPLICATION: TYPE OF SPRINKLER SYSTEM: OCCUPANCY CLASSIFICATION: MINIMUM DENSITY: .15 GPM/SQ FT 1500 SQ FT ORDINARY GROUP 1 WET WET LIGHT 1 CATEGORY 1 SEE SCHEDULE 250 GPM SEE SCHEDULE K=5.6 2 ORDINARY GROUP I .15 GPM/SQ FT 1500 SQ FT WET KITCHEN AND KITCHEN STORAGE CATEGORY 3 3 WITH SHALLOW (1/2" D) ESCUTCHEONS (IF VISIBLE) QUICK RESPONSE PENDENT TYPE IN GUEST LAUNDRY, ADMIN AREA, AND BACK-OF-HOUSE AREAS. WHITE FINISH QUICK RESPONSE SEMI-RECESSED IN GUEST SUITES AND PUBLIC SPACES. CAGE-TYPE COVERS IN SERVICE AND UTILITY AREAS. 3. 2. 1. SPRINKLER APPLICATION CRITERIA: 1500 SQ FT DATE OF TEST: 04/24/13 WATER TEST INFORMATION TEST HYDRANT ELEVATION: STATIC PRESSURE: RESIDUAL PRESSURE: SOURCE OF INFORMATION: FLOW RATE: TEST HYDRANT: BAUM & VINTAGEB1480, BAUM B747 --- 75 PSI 72 PSI 1280 GPM RYCO FIRE PROTECTION CONCEALED PENDENT SPRINKLER HEADS ARE NOT PERMITTED. 4. STAINLESS STEEL, WAX COATED REFER TO MARRIOTT MODULE 14 AND THE PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING FIRE SPRINKLER SYSTEM REQUIREMENTS. SPRINKLER CONTRACTOR SHALL COORDINATE BRANCH PIPING INSTALLATIONS TO AVOID PIPING INSTALLATIONS IN BEARING WALLS. 6. 7. QUICK RESPONSE EXTENDED COVERAGE SIDEWALL SPRINKLER HEAD (SP) SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COMPLIANCE WITH MARRIOTT MODULE 14. 8. POOL EQUIPMENT THE RESULTS OF A WATER FLOW TEST FROM THE LOCAL WATER AUTHORITY. THE TEST MUST BE DATED LESS THAN ONE (1) YEAR FROM THE PRESENT DATE TO BE CONSIDERED AN ACCEPTABLE TEST. IF THE WATER AUTHORITY CANNOT PROVIDE THIS INFORMATION, THEN THE FIRE SPRINKLER CONTRACTOR SHALL CONDUCT A NEW WATER FLOW TEST. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY COSTS INCURRED TO DO THE NEW WATER FLOW TEST, AND WILL CONDUCT THE TEST WITH THE OWNER, ENGINEER AND INSURANCE COMPANY PRESENT AS WITNESSES. ANY NEW WATER FLOW TEST SHALL BE COORDINATED WITH THE LOCAL WATER AUTHORITY. 9. QUICK RESPONSE DRY SIDEWALL SPRINKLER HEAD (SP) ELEVATOR HOISTWAY QUICK RESPONSE ) F0.01 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES FIRE PROTECTION
9
Embed
SYMBOLS, ABBREVIATIONS - Erie Construction Councilerieconstructioncouncil.com/plan_room_documents/FP Bid Set of 9.pdf · symbols, abbreviations and general notes fire protection.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
ALL FIRE SPRINKLER PIPING SHALL BE CONCEALED ABOVE CEILING OR IN
SPRINKLER CONTRACTOR SHALL COORDINATE SPRINKLER HEAD INSTALLATION
WITH NEW LIGHTING AND DIFFUSER LOCATIONS.
ALL SPRINKLER HEADS SHALL BE PLACED IN THE CENTER OF ALL CEILING
TILES WHERE NEW CEILING TILES ARE LOCATED.
ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED
BY CONTRACTOR AT THE SITE.
REQUIREMENTS. PIPE SIZING SHALL BE BY HYDRAULIC CALCULATION.
INSTALLATIONS SHALL CONFORM TO NFPA AND INSURANCE UNDERWRITER
OF WORK AND SPECIFICATIONS. ALL SPRINKLER SYSTEM COMPONENT
WALLS, WHERE POSSIBLE.
3.
5.
4.
2.
SUPPRESSION INSTALLATION AS PER THE INTENT OF THE PROJECT SCOPE
RESPONSIBLE TO PROVIDE ALL COMPONENTS FOR A COMPLETE FIRE
REVIEW AND INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR IS
SPRINKLER SYSTEM COMPONENTS ARE INDICATED ON THE DRAWING FOR
FIRE PROTECTION GENERAL NOTES
1.
QUICK RESPONSE UPRIGHT SPRINKLER HEAD (SP)
ON DRAWING AND NOTE NUMBER
INDICATES NOTE LOCATED ELSEWHERE
QUICK RESPONSE DRY PIPE SPRINKLER HEAD (SP)
FUNNEL DRAIN
GENERAL CONTRACTOR
HEATING CONTRACTORHC
CAP OR PLUG
CHECK VALVE
GATE OR GLOBE VALVE
BALANCING COCK
OS & Y SUPERVISED VALVE
FNL DR
GC
CLG
BLW
ABV
CEILING
BELOW
ABOVE
QUICK RESPONSE SEMI-RECESSED PENDENT
FIRE PROTECTION SYMBOL AND ABBREVIATION SCHEDULE
FIRE STANDPIPE LINE (F)F
FIRE SPRINKLER LINE (FS)FS
SPRINKLER HEAD (SP)
QUICK RESPONSE SIDEWALL SPRINKLER HEAD (SP)
QUICK RESPONSE UPRIGHT SPRINKLER HEAD BELOW OBSTRUCTION (SP)
FIRE DEPARTMENT CONNECTION
XX
FIRE SPRINKLER WATER DEMAND
SEE SCHEDULE
.10 GPM/SQ FT
SEE SCHEDULE
CATEGORY 2
GUEST ROOMS AND PUBLIC AREAS
SPRINKLER TEMPERATURE RATING:
SEE SCHEDULE
SPRINKLER SCHEDULE:
EXCEPT AS INDICATED BELOW:
ROOM/SPACE
ALL SPRINKLER HEADS SHALL BE QUICK-RESPONSE, 155° F TO 165° F, SEMI-RECESSED TYPE
QUICK RESPONSE, CORROSION RESISTANT
SPRINKLER TYPE
MECHANICAL/ELECTRICAL ROOMS
ELEVATOR MACHINERY
SWIMMING POOLS
QUICK RESPONSE
QUICK RESPONSE
TEMPERATURE RATING
212° F
155° F TO 165° F
212° F
1. FIRE SPRINKLER WATER DEMAND INDICATED ABOVE PENDING INSURANCE UNDERWRITER
NOTE:
AND AUTHORITY HAVING JURISDICTION APPROVAL.
HOSE STREAM ALLOWANCE:
SPRINKLER HEAD TYPE:
SPRINKLER 'K' FACTOR:
250 GPM
K=5.6
SEE SCHEDULE
100 GPM
K=5.6
BACK OF HOUSE AREAS
DESIGN AREA OF WATER APPLICATION:
TYPE OF SPRINKLER SYSTEM:
OCCUPANCY CLASSIFICATION:
MINIMUM DENSITY:
.15 GPM/SQ FT
1500 SQ FT
ORDINARY GROUP 1
WET
WET
LIGHT
1
CATEGORY 1
SEE SCHEDULE
250 GPM
SEE SCHEDULE
K=5.6
2
ORDINARY GROUP I
.15 GPM/SQ FT
1500 SQ FT
WET
KITCHEN AND KITCHEN STORAGE
CATEGORY 33
WITH SHALLOW (1/2" D) ESCUTCHEONS (IF VISIBLE)
QUICK RESPONSE PENDENT TYPE IN GUEST LAUNDRY, ADMIN AREA, AND BACK-OF-HOUSE AREAS.
WHITE FINISH
QUICK RESPONSE SEMI-RECESSED IN GUEST SUITES AND PUBLIC SPACES.
CAGE-TYPE COVERS IN SERVICE AND UTILITY AREAS.3.
2.
1.
SPRINKLER APPLICATION CRITERIA:
1500 SQ FT
DATE OF TEST:
04/24/13
WATER TEST INFORMATION
TEST HYDRANT ELEVATION:
STATIC PRESSURE:
RESIDUAL PRESSURE:
SOURCE OF INFORMATION:
FLOW RATE:
TEST HYDRANT: BAUM & VINTAGEB1480, BAUM B747
---
75 PSI
72 PSI
1280 GPM
RYCO FIRE PROTECTION
CONCEALED PENDENT SPRINKLER HEADS ARE NOT PERMITTED.4.
STAINLESS STEEL, WAX COATED
REFER TO MARRIOTT MODULE 14 AND THE PROJECT SPECIFICATIONS FOR