Top Banner
SVX-II David Stuart, UC Santa Barbara May 11, 2006
33

SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

SVX-IISVX-IIDavid Stuart,

UC Santa Barbara

May 11, 2006

David Stuart,UC Santa Barbara

May 11, 2006

Page 2: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• Why

• What

• How

Outline

Many details in following talks, so I’ll just review the design goals and then givea tour of the detector and its construction.

Page 3: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns

• Rad-hard

• Longer

• Double-sided

• Trigger-able

Design goals

The first 2 were required (well thought to be, vs 396 ns). The rest were desired.The last was critical for Bs mixing, and it drove the design.

Page 4: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• Wedge geometry

SVT requirements

Page 5: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 6: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 7: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• Wedge geometry

• Precision alignment during construction

• r and z

SVT requirements

Page 8: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 9: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 10: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 11: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• Wedge geometry

• Precision alignment during construction

• r and z

• Fast, deadtime-less readout

• See Ankush’s SVX3D talk

SVT requirements

Now, I’ll describe the detector with a photo tour.

Page 12: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Bulkheads for mounting and cooling

Page 13: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

SVXII LaddersLayer 1 Quarter Ladder

BeO Hybrid glued to siliconMounting tab

Thermal bridge

HDI, with LV boost wires

Finger and jumper on next page

Page 14: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Fingers

Page 15: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Jumper bus to z-side

Page 16: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Reason for calling them ladders

Note folded cables

Page 17: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Assembled into barrels

Page 18: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 19: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 20: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 21: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 22: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 23: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 24: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 25: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Spacers to allow lid to close over cables

Page 26: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
Page 27: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

Ready to s

lide into

ISL

Page 28: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

…after some packaging

Page 29: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns

• Rad-hard

• Longer

• Double-sided

• Trigger-able

Recall Design goals

Page 30: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns ?

• Rad-hard

• Longer

• Double-sided

• Trigger-able

Recall Design goals

Page 31: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns ?

• Rad-hard

• Longer ~

• Double-sided

• Trigger-able

Recall Design goals

Page 32: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns ?

• Rad-hard

• Longer ~

• Double-sided ~

• Trigger-able

Recall Design goals

Page 33: SVX-II David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.

• 132 ns ?

• Rad-hard

• Longer ~

• Double-sided ~

• Trigger-able ! !

Recall Design goals