Scott BrownriggPeter Caplehorn Technical Director Scott Brownrigg Architects
Sustainability Fire
The Architects Perspective
Scott Brownrigg
Sustainability Fire
Scott Brownrigg
Sustainability Fire
1New Principles
New Materials
New Construction Techniques
New Equipment
A lot to learn
Scott Brownrigg
Sustainability Fire
2We also have problems in current construction
Timber Frame
Interpretation Materials specs
Risk assessments Adequate guidance and supervision
These are amplified when applied to projects where sustainable values are applied
Scott Brownrigg
Sustainability Fire
3Minimise the risk Maximise the opportunity
we don’t know what we don’t know.
You need to close down the uncertainty and the risk to ensure that what you understand to be achievable actually is.
Scott Brownrigg
Sustainability Fire
4Domestic - Commercial -
Different perspectives
Challenges in each sector
Scott Brownrigg
Sustainability Fire
5
Fabric More insulation different types Air tightness to much higher standard Mass - lightweight heavy weight
Mix of materials complex
Scott Brownrigg
Sustainability Fire
6
Shading shutters etc
Solar panels water and pv Green Roofs Access limited Spread of flame
Scott Brownrigg
Sustainability Fire
7 Equipment and services
Heat Pumps Wind generators Bio mass
Mix of services
Scott Brownrigg
Sustainability Fire
8site, access ,Building access Fire service access Lobbies
Air sealing New layouts and facilities
Scott Brownrigg
Photo-voltaic cells - electrical power
Solar panels - hot water
Rainwater harvestingSystem
Ventilation turbines
Motorised clerestory windows
Sustainable drainage
Excellent BREEAM rating
Scott Brownrigg
Sustainability Fire
Means of escape –
Safe routes Doors widows Green elevations Finishes
9
Scott Brownrigg
Sustainability Fire
Fire spread and Compartmentation
10
Workmanship difficult to see what you are getting
Traditionally the weak points
Scott Brownrigg
Sustainability Fire
11
Challenges Ahead drawings need to be clear,
planning and building regulation approvals,
Monitor during construction,
Not easy to Identify defects and quality problems
Scott Brownrigg
Scott Brownrigg
Scott Brownrigg
Winner OAS Award 2005 – Best Bespoke Development Outside Central London
Scott Brownrigg
RED KITE House
Scott Brownrigg
Sustainability Fire
12
Lots to learn
Need to make progress
What about refurbishments
Final thoughts -
Scott Brownrigg
Sustainability Fire
Thank you