Pictorial view of Inauguration Suspension Bridge of Sadiq Abad UC Chapar Wari Programme for Economic Advancement and Community Empowerment (PEACE) Implemented by SRSP Dir Upper (Prepared: By Syed Zahid Jan) Regional engineer elaborated the roles and responsibilities of the project, audit and O&M committees. He also gave detail cost of the project. Total cost of the project is 4,079,353 PKR with 600 HHs. He also explained the contractor’s role and the material that would be supplied by the contractor. Though there is a pedestrian bridge that connects the village sadiq abad to main road however it is not jeep able and the villagers face lots of difficulties while carrying goods, patients to hospital and agri- products to market.