Surveying a Level Loop
17

Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Mar 28, 2015

Download

Documents

Elmer Busse
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Surveying a Level Loop

Page 2: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Level Loop (or Closed Circuit)

BS = 7.13 ft

Elev. 100.00 ft

Instrument location (TYP)

Turning Point (TYP)

FS 4.26 ft

1

Page 3: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closed Circuit or Level Loop    AUTO LEVEL READINGS  

          STADIA  

PT(+)BS HI

(-)FS ELEV

TOP/BOT STADIA

DIST/Angle

           

 BM  X  100.00    

           

         

             

                                                                 

7.13 107.13

TP-1 4.26 102.87

Page 4: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Level Loop (or Closed Circuit)

Elev. 100.00 ft

BS = 1.75 ft

Turning Point Elev. 102.87

FS = 2.99 ft

2

Page 5: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closed Circuit or Level Loop    AUTO LEVEL READINGS  

          STADIA  

PT(+)BS HI

(-)FS ELEV

TOP/BOT STADIA

DIST/Angle

           

BM  X  100.00    

           

         

             

                                                                 

7.13 107.13

TP-1 4.26 102.871.75

2.99

104.62

101.63TBM

Page 6: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Level Loop (or Closed Circuit)

Elev. 100.00 ft

BS = 0.94 ft

BS

= 5

.62

ft

BS = 9.12 ft

FS = 3.34 ft FS = 7.98 ft

FS =

6.0

1 ft

3

Elev. 101.63 ft

45

Page 7: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closed Circuit or Level Loop    AUTO LEVEL READINGS  

          STADIA  

PT(+)BS HI

(-)FS ELEV

TOP/BOT STADIA

DIST/Angle

           

BM  X  100.00    

           

         

             

             

                                                    

7.13 107.13

TP-1 4.26 102.871.75

2.99

104.62

101.63TBM

TP-2 6.01 101.240.94

107.255.62

TP-3 7.98 94.209.12

102.18

POR 3.34 99.98

103.32

Page 8: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closure Error

The difference between a measured or calculated elevation and the true or established elevation.

Closure Error = Final Elev. – Initial Elev.

Page 9: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closed Circuit or Level Loop    AUTO LEVEL READINGS  

          STADIA  

PT(+)BS HI

(-)FS ELEV

TOP/BOT STADIA

DIST/Angle

           

 BM  X  100.00    

           

         

             

             

                                                    

7.13 107.13

TP-1 4.26 102.871.75

2.99

104.62

101.63TBM

TP-2 6.01 101.240.94

107.255.62

TP-3 7.98 94.209.12

102.18

POR 3.34 99.98

103.32

CLOSURE ERROR = - 0.02 ft - 100.00

Page 10: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Allowable Error

• The allowable error depends on the type and purpose of the surveying.

• In this class, we will use

Page 11: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Closed Circuit or Level Loop

    AUTO LEVEL READINGS  

          STADIA  

PT(+)BS HI

(-)FS ELEV

TOP/BOT STADIA

DIST/Angle

           

 BM  X  100.00 BS 8.63 / 5.63  300 ft

       FS 5.69 / 2.83

BS 3.15 / 0.25 286 ft290 ft

       FS 4.44 / 1.54BS 6.67 /4.57 

290 ft210 ft

         FS 7.08 / 4.94 BS 1.84 / 0.04

 214 ft180 ft

          FS 8.94 / 7.02 BS 10.42 / 7.82

 192 ft260 ft

           FS 4.58 / 2.10  248 ft                                       

7.13 107.13

TP-1 4.26 102.871.75

2.99

104.62

101.63TBM

TP-2 6.01 101.240.94

107.255.62

TP-3 7.98 94.209.12

102.18

POR 3.34 99.98

103.32

CLOSURE ERROR = - 0.02 ft

- 100.00TOTAL = 2470 ft

Page 12: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Level Loop (or Closed Circuit)

Elev. 100.00 ft

180 ft

210

ft

260 ft

Instrument location (TYP)

248 ft

192 ft

214

ft

3

Elev. 101.63 ft

45

300 ft

286 ft290 ft

290 ft

Page 13: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Allowable Error

Survey data is acceptable

Page 14: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Reducing Errors

• Check that bubble is centered for EVERY rod reading.

• Keep the rod plumb during each reading.• Establish equal BS and FS reading distances.

– Equal reading distances will cancel out any error caused by the line of sight not being parallel with the axis of the bubble tube.

– This is not always possible due to terrain.

Page 15: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Common Errors

• Faulty rod reading (verify reading)

• Rod not fully extended (high reading)

• Tripod movement during reading

• Confusion between recording BS and FS entries in the field book

Page 16: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Can You Top That?

According to NOAA, this survey party made 329 setups in 7 hours and 55 minutes working in an area of extreme grades in the Western United States in 1934.

Courtesy NOAA Photo Library http://www.photolib.noaa.gov/htmls/theb1809.htm

Page 17: Surveying a Level Loop. Level Loop (or Closed Circuit) BS = 7.13 ft Elev. 100.00 ft Instrument location (TYP) Turning Point (TYP) FS 4.26 ft 1.

Image Sources

National Oceanographic and Atmospheric Administration Photo Library http://www.photolib.noaa.gov/cgs/marks1.html