PHILADELPHIA UNIVERSITY Faculty of Engineering Department of Civil Engineering. SURVEYING Chapter 2 Measurements
59

SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Mar 16, 2018

Download

Documents

ngohanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

PHILADELPHIA UNIVERSITY

Faculty of Engineering Department of Civil Engineering.

SURVEYING

Chapter 2 Measurements

Page 2: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Chapter 2

Measurements

Page 3: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

ERE 371

Measurement Science Introduction • Observations

• measurements

-The difference between observations and measurements :

• Observation work: work that is done to get one single value directly and without correction of the device or surveying tool . • Measurement works: are the actions which take place (before, during and after) the observation process for the

final surveyed value (closest to the true value).

Page 4: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

- Works before observation : Calibration - set the device to the point. - During the observation: allocating, tightening tape - reading device. -Work after observation: taking averages of readings - make tables accounts. • Any person can carry out the observation, but surveying engineer which is only able to carry out the observation and correct the

measurements.

Page 5: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Types of measurements:

1- Linear: Distance , 3-d coordinates Point location , Area and Volume

2- Non-linear (Angular): Horizontal angle Vertical angle

Page 6: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

What is measured? •Distances - to calculate areas, volumes, etc. -to draw plans, maps, etc.

•Angles -both horizontal and vertical

•Heights - levels or elevations (the third dimension)

Page 7: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Which instrument should be used? • Distances - taping (steel tape), tacheometry (theodolite), electronic (EDM, GPS) • Angles -tacheometry (theodolite)

• Heights - leveling (level, theodolite)

Page 8: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Facts about measurements

- All measurements contain errors.( No measurement is exact) . - You can not determine the absolute value of the error -But you can determine the values closest to the true values through standards and statistical standards.

Page 9: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Sources of Errors : - Natural Errors: Errors that occur as a result of natural phenomena such as heat - wind and Moisture . -Instrumental Errors: result from lack of precision -in the manufacture of devices and in grading and measurement units or as a result of the different in materials used in manufacturing . -Personal Errors : As a result of defect in the observer vision or lack of familiarity with the

technical work in the field.

Page 10: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Type of errors: 1- Blunder error (Gross Errors ):- error is due to carelessness of human. These are serious mistakes made by surveyor, such as reading 15.45 instead of 5.45 or writing 9.64 instead of 6.94.

Page 11: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

2- Systematic error( Constant error) :- ( mathematic model) cause by environment, i.e. elongation or Shrinkage , and have cumulative effect. As an example, you have a meter to measure distance with a production error. It shows 1 meter but in reality the distance is 99.5 cm. Then you measure always longer than the real distance

Page 12: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

3- Random error :- An error always there due to instrument and human, It is not easy to detect (small value) i.e. Reading , Recording, positioning 4- Accidental Errors These are unavoidable errors arising from weather condition, change in temperature, humidity, mood of observer, etc.

Page 13: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

MEASUREMENTS Errors : 1-True error: ei = xi - x X : true value Xi : measured value

2- estimated error: vi = xi - Xi : measured value : average value

Page 14: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

3- Standerd error:

4-RMS / root error of the mean :

Page 15: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

4- Maximmum error Probability is 50% standerd error =1

Probability is 99.7% standerd error = 3

Page 16: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

ACCURACY: Accuracy is how far the measurement are from the true value. PRECISION: Precision is the amount by which a measurement deviates from its mean. Suppose that you measure the same line five times. .

Page 17: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Examples: The true length of the line is 736.72 m The first team reports the following measurements: 736.80, 736.70, 736.75, 736.85, and 736.65 m. (more accurate) The second team reports the following measurements: 736.42, 736.40, 736.40, 736.42, and 736.41 m. (more precise)

Page 18: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 19: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

PRECISION & ACCURACY Measurements that has high precision has small standard . Measurements has high accuracy if it is close to the true value. High precision does not necessary

mean also high accuracy.

Page 20: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Measurement that has highly precise is also highly accurate if it is contain little or no systematic error . To obtain high precision and high accuracy : 1- eliminate all blunders 2- eliminate or correct all systematic errors 3- minimize random errors

Page 21: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Relative precision :

Page 22: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Precision increase with the increase of number of time of the measurement repeated

Example

Page 23: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 24: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Example :

Page 25: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 26: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 27: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Examples :

Page 28: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Distance measurement:

1.Pace. 2.Chain. 3.Tape. 4.Odiometer. 5.Tacheometer. 6.EDM. 7.Disto-instrument. 8.Total station ( x, y , z ).

Page 29: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

There are three methods of Distance measurements: 1-DDM(direct distance measurements) 2-ODM(optical distance measurements) 3–EDM(electronic distance measurements) DDM methods: Direct distance measurements involves : ( pacing , measuring by use tapes and chains ranging and odometer and pedometer devices)

Page 30: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

1.Pacing

2- TAPING

Page 31: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 32: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

4- Odiometer

Steel tape

3- pedometer

Page 33: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Ranning rod Plumb--bob

INSTRUMENTES OF DISTANCE MEASUREMENT

chain

Chaining pins

Page 34: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

FIELDWORK 1- Set up a rod at a point in vertical position (to make the road plumb) 2- Ranging a line (to locate a rod at an intermediate point on a line) 3- Hand signals in ranging 4- Measuring the horizontal distance between two points 5 - Write a report what you have done and difficulties you encountered while you are working. - Each member of subgroup should measure individually and check the measurements.

Page 35: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

The position of any point can be determined by taking two measurements : 1- Two line: a-right angle B-non right angle 2- Line and angle( polar way) 3- Two angles

Page 36: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Offsets

2- Arc method 1- Minimum distance

Page 37: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Offsets

3- phythagorion theorem (3 - 4 – 5) oC2 = a2 + b2

4- Arcing perpindecular from a point on the line

Page 38: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Triangulation

Page 39: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

d :

Page 40: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 41: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 42: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Horizantal distance d= s cos α

Page 43: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

There are five distance (Tape ) corrections 2- slope correction :

1-Standardisation correction =

: Tape length : measured length

S = slope distansce

Page 44: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

4-Tension correction :

3- Temperature correction : Ct = .0000116 *L( TI-Tه) for steel Tape

TI : actual temperature

Tه : standard temperature

Page 45: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

5- sag correction :

The distance (Tape ) corrections are compined to one general equation : A +

+B

D -

α

.0000116 *L( TI-Tه) - D= L - L cos α

Page 46: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Example : L = 76.462 m ,α = 1 25` Tape has nominal length = 20 m Standardized length = 20.11 m T20 = ه C , P50 = ه N Tape laid on the surface of ground TI = 10 c , Pi = 70 N A = 1.9 mm2 , E = 200000 N/ mm2 Solution : First step is to decide which correction is necessary. 1- No sag correction because tape laid on the sarface. 2-Standardisation correction =76.462 ( 20.011 – 20 ) 3- Slope correction = =-76.462( )= - 0.0251 m 4- Tension correction = 76.462( 70-50)

A +

+B D

α

20 = 0.0421m

1.9*200000 = 0.0040 m

Page 47: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

5- Temperature correction = 0.0000116 *76.462 ( 10-20) = - 0.0086 m D = 76.462+0.421- 0.0234 + 0.0040 – 0.0086 D = 76.4761m , D=76.47m ( to nearest mm

Page 48: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Accuracy : • Synthetic tapes( Fiberglas tape and metal chains standardization and slope only apply 1/1000 accuracy • Steel tapes if standardization and slope correction only considered then 1/5000 accuracy (The difference in accuracy between the two tapes is reflected in the gradation on the tapes scale, steel tapes are graded to the nearest mm while fibreglass tapes are graded to the nearest cm). • if tension and slope condition are considered then the accuracy 1/10000 – 1/20000 -Sag correction apply only if in catenaries

Page 49: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

ODM method optical distance measurements involves (stadia Tachometry )

Stadia hairs

Page 50: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 51: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to
Page 52: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Horizontal distance D = K* S cos α +C cos α K : constant =100 , C : constant =0.0 D = 100 S cos α , Given α = 02 17’ 27” S= 2.140 – 1.774 = 0.366 m D = 100* 0.366 * cos (02 17’ 27”) = 36.542 m =36.5 m

(to nearest 100 mm) hi : height of Thedeolite on A

RLA: reduce level to the point A

RLB : reduce level to the point B

RLB = RLA +hi v – m V : vertical component of the sloping distance

m : middle hair reading .

2.140 1.956

1.774

α

2

ه 2

ه

example :

2

Page 53: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

V= ½ k sin 2 α + c sin α V= 50*0.366*sin (2* (02 17’ 27”)) =1.462 m Given RA = 111.43 m hi = 1.51 m

Then RB = 111.43+1.51+1.461-1.956

RB = 112.446 = 112.45 m ( to the nearest 50 mm)

ه

Page 54: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

EDM : Electronic distance measurements

Page 55: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

laser distance meter Accuracy = + 1.5 mm

-

Page 56: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

EDM Devices

Page 57: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

obstacle distance measurement

Page 58: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

Set out

Page 59: SURVEYING - philadelphia.edu.jo 2... · • Observation work: ... ( pacing , measuring by use tapes and ... FIELDWORK 1- Set up a rod at a point in vertical position (to

lay out