Top Banner
1 of 8 Baseline Assessments Plan Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework
8

Survey plan-updated

Nov 21, 2014

Download

Technology

jryalo

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Survey plan-updated

1 of 8

Baseline Assessments Plan

Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape:

Demonstrating the Eco-town Framework

Page 2: Survey plan-updated

2 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

VAGHG

GISNRM

Green House Gasses

VA/GHG/NRM/GIS-Mapping Projection Baseline Assessments/Studies/Surveys Initial Plan

Vulnerability Assessment

Natural Resource Management

Geographic Information System

Page 3: Survey plan-updated

3 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

• Compare the SRPAO survey with the that of the project team• Respondents will be chosen from the respondents of the SRPAO survey• Respondents will be brought to their respective barangay halls• In the conduct of the survey, 2 guides per barangay shall be provided• If possible, food should be contracted out to the barangay concerned• In order of concern:

– In-out– Presence of IP (2 Barangays)– Mining areas (4 sitios)

SURVEYS

Page 4: Survey plan-updated

4 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

• The barangays with mining activities should be identified • June 3-15 shall be the survey period• Preparations should start after election with

meetings/coordination/orientation with barangay officials the priority

• Powerpoint presentation should be prepared for the orientation.

SURVEYS

Page 5: Survey plan-updated

5 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

Survey Deployment Plan

Page 6: Survey plan-updated

6 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

Survey Deployment Plan

Page 7: Survey plan-updated

7 of 8Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape: Demonstrating the Eco-town Framework

www.climate.gov.phTel: 02 7353144, 02 7353069

• FGDs – on GHG: 5 LGUs with 10 pax/FGD, half day duration; Included in

the participants are the MENRO, MPDO and MAO – FGD/KII of barangay residents, barangay officials, IPs and mining

KII concern will be held at the same time with the survey.

• Respondents will be brought to their respective barangays halls

• URS should be involved in the FGD as resource persons. The project team can also request facilitators from the URS. A meeting with URS shall be scheduled.

FOCUS GROUP DISCUSSIONS

Page 8: Survey plan-updated

8 of 8

Thank You for Listening

Climate Resilience and Green Growth in the Upper Marikina River Basin Protected Landscape:

Demonstrating the Eco-town Framework