2015 STATEMENT OF QUALIFICATIONS COMMERCIAL & INDUSTRIAL Construction Management · Concrete Restoration · Metal Building Construction · Commercial Roofing Systems Safe · Experienced · Quality Service SURTREAT CONSTRUCTION SERVICES
40

Surtreat Construction Services -SOQ January 2015

Jan 16, 2017

Download

Documents

Hal Forsyth
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Surtreat Construction Services -SOQ January 2015

2015 STATEMENT OF QUALIFICATIONS COMMERCIAL & INDUSTRIAL

Construction Management · Concrete Restoration · Metal Building Construction · Commercial Roofing Systems

Safe · Experienced · Quality Service

SURTREAT CONSTRUCTION SERVICES

Page 2: Surtreat Construction Services -SOQ January 2015

1…………………………………………..Company Profile 2…………………………………………..Professional Services 3…………………………………………..Experience & Qualifications 4…………………………………………..Health & Safety ISNetworld 5…………………………………………..Management Team

TABLE OF CONTENTS

Page 3: Surtreat Construction Services -SOQ January 2015

COMPANY PROFILE

Surtreat Construction Services LLC is a construction management company that provides full service, innovative, technical solutions in steel reinforced concrete structures, metal buildings and roofing systems.

Since 1989, SURTREAT® and its affiliates have designed an extensive suite of solutions to provide a cost-effective and safe response for all of our clients needs nationwide.

Surtreat Construction Services has partnered with a group of privately held companies with common ownership that have over 500 associates with turnkey capabilities that allows us to provide the resources needed to complete complex projects of any size.

In addition, Surtreat Construction Services utilizes a diverse subcontractor base to provide project specific solutions in both active and shuttered facilities while maintaining compliance to site specific Health and Safety requirements.

History

Surtreat Construction Services focuses on construction management, concrete restoration, metal building construction and commercial roofing systems. Our company has continued to grow organically through successful project execution for private industry throughout the country. Since our inception, our approach to project execution has been designed to provide long-term solutions for our clientele.

Culture Surtreat Construction Services culture is a critical element of our business approach. Our organizational structure is focused on teamwork throughout our "Surtreat Family". This structure gives us a significant competitive advantage by offering our clients the combined efforts of Surtreat Construction Services diverse talents. Customization and value engineering allows us to produce a low cost solution using our extensive talented associates.

Page 4: Surtreat Construction Services -SOQ January 2015

PROFESSIONAL SERVICES

Construction Management Project Management

Design - Build

Planning and Scheduling

Resource Management

Optimization of Resources

Enhanced Project Design

Cash Flow Management

Value Engineering

Concrete Restoration Corrosion Inhibitors

Durability Products

Saw Cutting

Full Depth Repair

Cut and Patch Repair

Epoxy Injection

Crack Chasing

Water Proofing

Surface Preparation

Metal Building Construction

Steel Frame Buildings

Post Frame Metal Buildings

WideBay Trussed Purlin

Rigid Frame

Continuous Beam Frame

Continuous Truss Frame

Secondary Framing

Sky-Web II

Commercial Roofing Systems Varco Pruden Roof Systems

Thermal Block with SSR

EPDM

Thermoplastic Olefin - TPO

Sprayed Polyurethane Foam

SPF

Page 5: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Metal Building The entire metal building was renovated which included replacement of exhaust hoods with full length ridge vents, the roof and walls were replaced with 26 gage corrugated metal panels, the windows were replaced with two rows of 12 oz. white translucent panels and the personnel doors were replaced with 18 gage Steelcraft hollow metal doors and the rollup doors were replaced with 22 gage CHI steel rollup doors.

Selected Projects | Industrial Roofing & Metal Buildings

Page 6: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Metal Building Contracted to remove and replace an aging corrugated metal roof. The congested facility provided limited access to both sides of the building and required a 45’ extended reach forklift to shuttle material to and from the roof. Also, a 60’ and 80’ articulating boom lift was used during the snow bar, gutter and downspout installation. The 10’ long sections of ridge vent were removed and replaced utilizing a 120’ crane, setup in one location to make all picks. All work was done while being 100% tied off to safety line running the ridge.

Selected Projects | Industrial Roofing & Metal Buildings

Page 7: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Metal Building The existing pre-fabricated metal building was replaced with a Parkline metal building in a remote location along a natural gas pipeline. A Hydro-vac unit was required to safely excavate around several below grade pipes allowing for placement of ten concrete piers. The project also included site grading and placement of stone along the right of way access to the site.

Selected Projects | Industrial Roofing & Metal Buildings

Page 8: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Metal Building Contracted to construct a new building at an active natural gas compressor station as part of a large scale remedial PCB campaign.

Restroom facilities, large conference room complete with kitchenette

Managed according to requirements set forth by the county Special Purpose Flood Damage Prevention Regulations requiring the building to be erected on the same elevated footprint as the demolished men’s locker room.

Selected Projects | Industrial Roofing & Metal Buildings

Page 9: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

Roof Replacement Contracted to remove existing built-up roof and original flat roof and replace with corrugated metal roof. Additional work included site access upgrades requiring elevation change from the county road to the newly constructed parking area adjacent to the RTU building. Geotec fabric covered with a 6“ compacted stone base received a 2” stone topping to complete the parking area. Additional landscaping was installed around the perimeter of the building.

EXPERIENCE & QUALIFICATIONS

Page 10: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

New Metal Building Construction- Excavation Phase Contracted to remove and replace a fuel gas building and build a new warehouse within an active natural gas compressor station. During the excavation and concrete demolition phase of the project multiple below grade foundations and piping were encountered which required precision concrete removal around live natural gas pipes and the utilization of multiple Airvac units around the perimeter of the building footprints.

EXPERIENCE & QUALIFICATIONS

Page 11: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

New Metal Building Construction- Concrete Following excavation and backfill footers, stem wall and slab were poured in three separate phases using an extended reach pump truck to access the far end of the pour where heavy equipment access was prohibited. Power screeds were used to finish the concrete.

EXPERIENCE & QUALIFICATIONS

Page 12: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

New Metal Building Construction- Steel Frame Erection The following pictures illustrate Steel Frame erection on two different types of foundations. The larger building is a traditional concrete foundation, stem wall and slab on grade. The smaller building was built on concrete piers floated around existing below grade live gas lines.

EXPERIENCE & QUALIFICATIONS

Page 13: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

New Metal Building Construction- Interior Finish This phase of the project required the installation of a concrete poured in pan mezzanine floor, interior perforated metal liner, florescent lighting, catalytic radiant heaters, custom fabricated mezzanine safety gate, warehouse pallet racks and heavy duty steel cabinets.

EXPERIENCE & QUALIFICATIONS

Page 14: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

New Metal Building Construction- General Contractor Surtreat was hired to build a new steel frame metal building.

EXPERIENCE & QUALIFICATIONS

Page 15: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing & Metal Buildings

Roof Replacement Awarded the contract to replace the aged and PCB contaminated metal roof with a Standing Seam Roof (SSR) and install gable ventilators on the east and west end of the building and manual louvers on the north and south sides of the building for climate control.

Due to the PCB contamination, Surtreat Construction Services coordinated the removal process with a Hazwoper trained crew provided by the client.

During construction several of the original wood purlins were replaced and a 3’’ R-10 WMP-50 insulation was installed followed by a 2 x 4 batten system anchoring the SSR. The removal and installation process utilized a combination of manlifts, scaffolding and extension ladders.

The work was completed in accordance with OSHA 29 CFR 1910 & 1926, sub part T- Demolition, Subpart M- Fall Protection, 1926.500, 1926.501, 1926.502, and 1926.503.

EXPERIENCE & QUALIFICATIONS

Page 16: Surtreat Construction Services -SOQ January 2015

Selected Projects | Industrial Roofing

Industrial Metal Building Contracted as part of the metal building roof replacement to remove existing skylights and install VELUX® energy efficient and tempered safety glass skylights.

Using daylight reduces energy costs, energy consumption and the demand for unsustainable power that is currently challenging the health of the world’s environment.

EXPERIENCE & QUALIFICATIONS

Thermoplastic Polyolefin (TPO) Roof Replacement Storm damage due to high winds and driven rain partially removed the existing roof material and perimeter trim on the concrete block building with a flat cast-in -place concrete roof.

Contracted to remove the existing roofing materials and install a new Firestone TPO roof system.

Page 17: Surtreat Construction Services -SOQ January 2015

Selected Projects | Corrugated Metal Roof Restoration

EXPERIENCE & QUALIFICATIONS

Corrugated Metal Roof Repair Contracted to repair the aging corrugated metal roof on the compressor building and extend its useful life. Through a combination of stainless steel screw replacement and strategically placed elastomeric coating, all major and minor leaks were stopped.

Page 18: Surtreat Construction Services -SOQ January 2015

Selected Projects | ADA Compliant Ramp Restoration

EXPERIENCE & QUALIFICATIONS

ADA Compliant Ramps Installed a new aluminum modular ADA ramp on a new multi-use building while maintaining access to the facilities only well. In addition, the existing wooden ADA ramp on the main office building was restored.

before

after

before

after

Page 19: Surtreat Construction Services -SOQ January 2015

Selected Projects | Interior Building Restoration

EXPERIENCE & QUALIFICATIONS

Industrial Site – Locker Room Rehab Contracted to renovate existing looker room and shower facilities at an active natural gas compressor station as part of a large scale remedial PCB campaign. The existing shower, toilets, sink and lockers were removed and discarded. The interior was cleaned and repainted along with the installation of a new shower, toilet and sink. Lockers were also provided for all site personnel.

Page 20: Surtreat Construction Services -SOQ January 2015

Selected Projects | Steel & Aluminum Floors

EXPERIENCE & QUALIFICATIONS

Steel Plate and Extruded Aluminum Floor Replacement As part of an overall remedial program the compressor building elevated floor was required to be replaced in like kind. Two-thirds of the existing floor was comprised of 1/4” steel plating and the remaining floor was made up of extruded aluminum plating all of which was custom made to fit around all protrusions and supporting equipment within the compressor building. To facilitate installation a CAD drawing was created prior to shop fabrication sizing and numbering each of the 200+ plates. In addition, an onsite fabrication shop was set up to handle any required modifications.

Page 21: Surtreat Construction Services -SOQ January 2015

Selected Projects | Steel & Aluminum Floors

EXPERIENCE & QUALIFICATIONS

Galvanized Steel Floor Replacement As part of an overall remedial program the compressor building elevated floor was required to be replaced in like kind. The existing floor was field measured and each of the panels were marked and given an identification number which would also represent its location on the customized CAD drawing. Regardless of the size of the project, drawings are an integral part of all fabrication projects. The 4800sf floor comprised of over 360 individual galvanized 1-1/4” x 3/16” smooth top steel grates with banded perimeter. All protrusions also received a banded perimeter while maintaining a 1” minimum clearance to prevent interference with gas bearing pipes.

Page 22: Surtreat Construction Services -SOQ January 2015

Selected Projects | Steel & Aluminum Floors

EXPERIENCE & QUALIFICATIONS

Steel Plate Replacement As part of an overall remedial program the compressor building elevated floor was required to be replaced in like kind. The area directly under the six compressors was comprised of 1/4” steel plating. The mezzanine section of the floor transitioning to the next level was also replaced with 3/8” steel plating. All steel flooring was painted with two coats of Carboline Carboguard 890 epoxy on both sides. The floor was custom made to fit around all protrusions and supporting equipment within the compressor building. To facilitate installation a CAD drawing was created prior to shop fabrication sizing and numbering each of the plates. In addition, an onsite fabrication shop was set up to handle any required modifications.

Page 23: Surtreat Construction Services -SOQ January 2015

Selected Projects | Galvanized Steel Grating

EXPERIENCE & QUALIFICATIONS

Galvanized Steel Floor Replacement Contracted to replace galvanized steel grating surrounding five compressors. Field measurements were gathered and converted into a CAD drawing prior to fabrication. All perimeter and protrusions were banded per grating specifications.

Page 24: Surtreat Construction Services -SOQ January 2015

Selected Projects | Component Installation - New & Existing Structures

EXPERIENCE & QUALIFICATIONS

Commercial Door Installations Contracted to replace existing doors in like kind on multiple sites, as well as provide upgrades from commercial metal doors to large rollup doors, as part of an overall building construction project.

Page 25: Surtreat Construction Services -SOQ January 2015

Selected Projects | Component Installation - New & Existing Structures

EXPERIENCE & QUALIFICATIONS

Commercial Window Renovation Contracted to remove existing windows and replace with translucent panels or commercial insulated double pane windows as part of an overall building restoration project.

Page 26: Surtreat Construction Services -SOQ January 2015

Selected Projects | Component Installation - New & Existing Structures

EXPERIENCE & QUALIFICATIONS

Commercial Ventilation Upgrade Contracted to install two wall mounted fans in the compressor building as part of the planned ventilation system upgrade. Also included in the package was installation of six eight foot gravity fed louvers.

Page 27: Surtreat Construction Services -SOQ January 2015

Selected Projects | Interior Finishing

EXPERIENCE & QUALIFICATIONS

Industrial Conference Room Contracted to provide interior finishes and install kitchenette, conference room furniture and presentation equipment as part of an overall building construction project.

Page 28: Surtreat Construction Services -SOQ January 2015

Selected Projects | Excavation, Concrete Restoration, General Construction Services

EXPERIENCE & QUALIFICATIONS

Pneumatic Excavation/ Well Pump Relocation Contracted to temporarily relocate an existing well pump, tank and softener. Traditional trenching methods were not an option for this project. Instead a pneumatic excavator was utilized to surgically navigate the 45’ excavation which ultimately uncovered a total of 16 pipes and lines. The area was surrounded by safety fencing during installation of the temporary utilities until the trench was back filled with sand and stone.

Page 29: Surtreat Construction Services -SOQ January 2015

Selected Projects | Excavation, Concrete Restoration, General Construction Services

EXPERIENCE & QUALIFICATIONS

Concrete Wall and Stair Replacement Contracted to demolish a deteriorated concrete wall and steps that had been removed from service due to existing safety hazard. Following demolition the wall and stairs were framed, poured, painted and returned to service with new hand rails installed.

Page 30: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Concrete Containment Demolition and Slab Replacement Contracted to demolish a deteriorated concrete containment wall and slab, and replace with new concrete slab designated for a prefabricated metal building.

Page 31: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Concrete Thru Wall Restoration Contracted to install thru wall sleeves and link seal belts on 16 protrusions at and below grade. The sleeves were then filled with wax, forms installed and new concrete poured. The final phase of the project called for installation of aluminum cover plates on the exterior of the building.

Page 32: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Off Campus University Housing Parking Deck Restoration Contracted to apply SURTREAT’S Total Performance System (TPS) to 54,000 sf concrete parking deck to extend the service life of the aging garage. As part of the project set up, the entire perimeter of the parking deck was masked with a 4- ounce woven filter fabric to prevent over spray on the adjacent buildings and vehicles on the floors below. All drains were masked and the control joints were sealed. Prior to application of the migratory penetrants, the host concrete received a deep clean to remove the existing dirt and debris. Surface prep included standard hot water pressure washing followed by dry application of cleaning agent, multiple passes with covered 36" spinner unit, and ended with a final rinse utilizing hand held hot water pressure wands. SURTREAT TPS was applied using a 6-ft spray boom and two hand held wands for detail work.

Page 33: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Automotive Dealership Roof Top Parking Deck General Contractor/ Project Manager for a 35,000 sf roof top parking deck restoration of the Ford dealership located in Fresno, California. The project in included temporary removal of 12 roof top HVAC units, removal and disposal of 35,000sf of traffic bearing membrane, 2,000sf concrete spall repair, surface preparation via shot blasting, application of SURTREAT TPS II migratory corrosion inhibitor and installation of Neogard Autogard membrane system. Following restoration the HVAC units were reinstalled and the roof top deck was restriped per original parking configuration.

Page 34: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Public Parking Garage Restoration Project Manager for the restoration of three public parking garages owned and managed by the City of Manhattan Beach, California. The projects were coordinated with the department of public works to minimize traffic congestion and parking access to local businesses. The garages were completely encapsulated during the restoration and application phases to prevent disturbance to the adjacent businesses.

The projects included spall repair, crack chasing and repair and removal of surface contaminants through mechanical abrasion followed by the application of SURTREAT Total Performance System to over 100,000 sf of surface area to extend the service life of the respective garages.

Page 35: Surtreat Construction Services -SOQ January 2015

EXPERIENCE & QUALIFICATIONS

Selected Projects | Excavation, Concrete Restoration, General Construction Services

Pillar Point Commercial Fishing Pier Technical support for installation of SURTREAT Total Performance System (TPS) as part of the pier restoration project within the San Mateo County Harbor District. Following concrete repair to the beams, columns, deck and underside portions of the East and West section of the host concrete, 4875 sf of new concrete combined with 15,000 lbs of steel reinforcement were poured to complete the closure strips. SURTREAT TPS was then spray applied to approximately 50,000sf of concrete surface to mitigate corrosion activity, reduce porosity and prevent chloride contamination. The project was completed in phases without disrupting the commercial fishing season and the annual Blue Crab harvest.

Page 36: Surtreat Construction Services -SOQ January 2015

TRAINING Surtreat Construction Services has established a very aggressive attitude towards behavior based safety and the importance of training in achieving a safe work environment.

Our guidelines are company and job specific which incorporates the knowledge, understanding and behavior that are key elements to safety and performance.

Surtreat Construction Services' mission is to create a safe environment through safe behavior and attitudes, while maintaining cost effective and timely environmental solutions. The health and safety of our associates, subcontractors, the public, and the environment is our priority. All work activities will focus on the safety of all personnel involved. Everyone has the right to go home each day safe and unharmed. Surtreat Construction Services' Health and Safety Statement of Policy and procedures serve as the written Health and Safety Program for its associates, contractors, and subcontractors who are engaged in general construction, actual clean-up or remediation activities where safety and/or health hazards may exist. Both are regularly updated as appropriate.

HEALTH & SAFETY

Page 37: Surtreat Construction Services -SOQ January 2015

HEALTH & SAFETY- ISNetworld

1. Company Information

Access items including work types, office locations, job bids, SmartLog, etc.

This step is complete

2. Document Center

Submit and edit documents such as insurance, COR/SECOR/SMA, OSHA Forms, EMR Letters , Workers Compensation Premium Rate Statement.

This step is complete

3. Questionnaire

Complete all questionnaires for your Owner Clients.

This step is complete

4. Review & Verification (RAVS)

Submit and edit items such as written safety programs and training documentation.

This step is complete

My Clients

NiSource Gas Transmission

My Clients NiSource Gas Transmission

Page 38: Surtreat Construction Services -SOQ January 2015

MANAGEMENT TEAM

Mr. Todd Snyder Mr. Snyder has over ten years of Industrial operational experience managing associates in production as well as QA/QC roles combined with eleven years of construction and project management experience. Mr. Snyder’s responsibilities have included daily interface with customers and customer representatives, oversight of project activities, health and safety, daily record keeping and management, correspondence and submittal management, revenue recognition and invoice generation, production tracking, and report generation and distribution. Mr. Snyder has experience with medical monitoring programs, pre-employment physicals, drug screens, background checks and Occupational Medicine relationships. Mr. Snyder has OSHA 4O Hour 29 CFR 1910.120 HAZWOPER, Loss Prevention System (LPS) Behavior Based Safety and Lead Awareness Training certifications and maintains a current OSHA 8 Hour CFR 1910.120 certification.

EDUCATION Mr. Snyder obtained his Bachelor of Science Degree in Business Administration from Miami University in Oxford, OH with dual majors in Production and Operations Management and Purchasing and Procurement from the Farmers School of Business. Mr. Snyder also obtained his Master in Business Administration from Pepperdine University in Malibu, CA.

TRAINING AND CERTIFICATIONS OSHA 4O Hour 29 CFR 1910.120 HAZWOPER, OSHA 8 Hour 29 CFR 1910.120 HAZWOPER

WV Contractors License

DuPont SHE Contractor Safety Orientation

NiSource – Life Saving Rules/ Contractor Safety Handbook

Panhandle Energy (Panhandle Eastern Pipe Line, Trunkline Gas, Trunkline LNG, Florida Gas Transmission) Contractor Safety Orientation

Loss Prevention System (LPS) Behavior Based Safety

Lead Awareness Training

First Aid and CPR

Industrial Forklift Operator

Page 39: Surtreat Construction Services -SOQ January 2015

MANAGEMENT TEAM

Mr. Hal Forsyth Mr. Forsyth possesses over 20 years of extensive construction and health & safety field experience in a wide range of commercial and environmental construction projects. As an owner of several construction companies in the past, Mr. Forsyth is responsible for conducting daily project management duties including, safety tailgate meetings, completing documentation/reporting, conducting site orientations, overseeing subcontractor safety, conducting medical monitoring, conducting safety evaluations, conducting audits, maintaining inventory control, providing training, determining appropriate safety requirements for on-site workers, ensuring compliance with the site specific HASP and Surtreat Construction Service’s Behavior Based Safety System. Moreover, Mr. Forsyth has significant experience providing specialized skills to unique program requirements, and knowledge in all aspects of the construction process. Mr. Forsyth is a “hands on” principal who prides himself on being readily accessible to each and every project.

EDUCATION Loyola University of Chicago Bachelor Degree of Finance Specialized Classes: Construction Administration, Real Estate Appraisal, Construction Drawings and Specification

TRAINING AND CERTIFICATIONS

OSHA 4O Hour 29 CFR 1910.120 HAZWOPER, OSHA 8 Hour 29 CFR 1910.120 HAZWOPER

NiSource – Life Saving Rules/ Contractor Safety Handbook

Excavation Competency

First Aid/CPR

Confined Space 29 CFR 1910.146

Commercial Contractor License Arkansas

Commercial Real Estate License IL

NASD Series 7

NASD Series 66

Page 40: Surtreat Construction Services -SOQ January 2015

Surtreat Construction Services

854 East Algonquin Road, Suite 110

Schaumburg, IL 60173

p. 630.986.0780

f. 847.956.2052

Safe · Experienced · Quality Service