Most Immediate "ft. 3/6/2015-~ ~ fH:ctll{ Government of India ~~'3lIW"l Ministry of Power 9.n=f ~l"ftp~, ~ ll11T, -;:p:ft ~ -110 001 Shram Shakti Bhawan, Rafi Marg, New Delhi-ll0 001 Dated: 6 th May, 2016 To As per list Subject: - Surrendered share of power by States in various power stations - reg. ********** Sir / Madam, Please refer to this Ministry's letter dated 2ih February, 2015, 31 st March, 2015, 8 th July, 2015, 31 st August, 2015, zo" October, 2015, 2ih November, 2015 and 15 th December, 2015 enclosed therewith the letters from various Government regarding above subject. The letters are again enclosed received from Govt. of Odisha, DVC, Govt. of Rajasthan, Govt. Himachal Pradesh, Govt. of Haryana, Govt. of Sikkim, Govt. of Meghalaya, Govt. of Manipur, Govt. of Punjab, Govt. of Jharkhand, Govt. of Madhya Pradesh and Govt. ofNCT of Delhi surrendering their power. These letters are also available in Ministry of Power web site (-www.powermin.nic.in). If the State is interested to avail this power, the quantum and the period may be indicated, so that suitable reallocation can be considered by the Ministry. Yours faithfully, Encl: as above ~ (D. Guha) Under Secretary to Govt. ofIndia Tele-fax: 23719229 Email: [email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Most Immediate
"ft. 3/6/2015-~~ fH:ctll{
Government of India~~'3lIW"l
Ministry of Power9.n=f ~l"ftp~, ~ ll11T, -;:p:ft ~ -110 001
Shram Shakti Bhawan, Rafi Marg, New Delhi-ll0 001
Dated: 6th May, 2016To
As per list
Subject: - Surrendered share of power by States in various powerstations - reg.
**********Sir / Madam,
Please refer to this Ministry's letter dated 2ih February, 2015, 31st
March, 2015, 8th July, 2015, 31st August, 2015, zo" October, 2015, 2ihNovember, 2015 and 15thDecember, 2015 enclosed therewith the letters fromvarious Government regarding above subject.
The letters are again enclosed received from Govt. of Odisha, DVC,Govt. of Rajasthan, Govt. Himachal Pradesh, Govt. of Haryana, Govt. ofSikkim, Govt. of Meghalaya, Govt. of Manipur, Govt. of Punjab, Govt. ofJharkhand, Govt. of Madhya Pradesh and Govt. ofNCT of Delhi surrenderingtheir power. These letters are also available in Ministry of Power web site(-www.powermin.nic.in). If the State is interested to avail this power, thequantum and the period may be indicated, so that suitable reallocation can beconsidered by the Ministry.
Yours faithfully,
Encl: as above ~(D. Guha)
Under Secretary to Govt. ofIndiaTele-fax: 23719229
1. Secretary (Power), Govt. of Arunachal Pradesh, Jal Vidyut Bhawan, Niti Vlhar,Near IG. Park Gate, ltanagar-791111
2. Commissioner & Secretary, Power Deptt., Government of Assam, P.O. AssamSachivalaya, Block-C, 3rd Floor, Dispur-781 006
3. Secretary (Energy), Government ofBihar, 8, Darogaroy Path, Patna-8000014. Commissioner, Deptt. Of Power, Government of Manipur, Manipur Secretariat,
Imphal-79S00]S. Secretary, Power & Electricity Deptt., Government of Mizoram, Mizoram Sectt.
Annexe-Il, Treasury Square, Aizwal-79600 16. Commissioner & Secretary, Power Deptt., Government ofNagaland, New Sectt.
Complex, Kohima-7970017. Principal Secretary (Power), Government of Tripura, New Sectt. Complex,
Power Department, Agartala-79900 I8. Addl Chief Secretary, Department of Power & NCES, Government of West
Bengal, 1, Kiron Shanker Roy Road, New Sectt. Building, 7th Floor, Kolkata-70000]
9. Secretary (Power), Electricity Department, Govt. of Goa, Panaj i-40300 110. Principal Secretary (Power), Govt. of Haryana, Power Department, 37, 7th
Floor, Sector-I, Chandigarh-16000 111. Principal Secretary (Energy), Govt. of Uttar Pradesh, Bapu Bhawan, UP
Sachivalay, Lucknow-22600 112. Principal Secretary (Energy), Govt. of Maharashtra, Mantralaya, Madam Cama
Road, Hutatma Rajguru Square, Nariman Point, Mumbai-40003213. Principal Secretary (Energy), Govt. of Chattisgarh, D.K.S. Bhavan, Mantralaya,
Raipur-49200 114. Principal Secretary (Energy), Energy Deptt., Block-S, Sth Floor, Govt. of
Gujarat, Sachivalya, Gandhinagar-382010IS. Principal Secretary (Power), Govt. of Himachal Pradesh, Shimla-171 00216. Principal Secretary (Power), Govt. of Jarnmu & Kashmir, Civil Secretariat,
Jammu/Srinagar-18000117. Principal Secretary (Energy), Govt. of Jharkhand, Nepal House, Doranda,
Ranchi-83400218. Principal Secretary (Energy), Govt. of Madhya Pradesh, Energy Deptt.,
Mantralaya, Vallabh Bhavan, Bhopal-46200419. Principal Secretary, Department of Energy, Govt. of Odisha, Bhubaneswar-
7S100120. Secretary (Energy), Govt. of Rajasthan, Room No. 4122, Main Building Sectt.,
( ) S d d h f Jh kh d f . dm: urren ere s are 0 ar an or entire perro :SI. No. Station (MW)1 Barh STPP (2x660 MW) 802 Farakka-1Il (500 MW) 32
MW9.96
() S d d h fM f0: urren ere s are 0 arupur or entire peridSI. Station Installed Capacity (in MW) Share of MeghalayaNo. (MW)1 Bongaigaon TPS Unit 2 3x250 MW 31.4 (15.7x2)
&3
1->--(1,'l. t"P~~Se.c '6 L v') ~\..
~"~ ~T~ 1--~\~\"\'i"-II f? x C'l 1.."
MA.NOHAR LAL ~ r--~~q~o~Z)'\"1"'> ~
~~~
wli'M)~/(J v'"'V ' -c·~ •
c/V y/v;;'- ri [../ )(-'f
if oY X I(v~~x% likely requirement in next 2-3 years. Accordingly, the power is being scheduled as per( D
,) L- actual requirement in merit order. 693 MW power has been contracted from the NTPC
\) 1·/\<1tl \ Aravali Power Company Private Limited (APCPL). Since the power of this plant is very
expensive and falls low in the merit order, it is not being scheduled. The Haryana Power
~ ~, gR[!IOII.i1 0;§lll et) I
CHIEF MIN[STER, HARYAI A,CHAl'TDl GARH.
, • I JDated ...:'_!..J .. ~ ..,..) O..U .
I .
I may bring to your kind notice that Haryana has contracted more power than its
Companies, however, have to P<:iY the fix cost amounting to Rs.815 crore per year. This is
resulting into unnecessary burden on the consumers of the State.
It has been decided by the State to surrender this power for a period of one year, for
which a request has been made to the Ministry of Power for allocating it to any other
desirous State.
I may request for your kind intervention for expediting the surrender of power by
Haryana from NTPC APCPL plant and its allocation to any other state,:...
Yours sincerely,
"Ji",/I CzO?/I'I/,l'
(Manohar Lal)
Shri Piyush Goyal,Minister of State (Independent Charge) for Power,Government of India, Ministry of Power,Shram Shakti Bhawan,New Delhi-l10001.
·0.0, No. _ ..3__ /PS/ACS (power)/!>£: T-Z'1c
)
, ,.
J)~:{V;'" r-./"~)lll//,V:)/A~~:-/ Kindly refer to the subject noted above.
tff\h'}//t;?v y/ You are aware that NTPChas set up a 3xSOOMW Power Plant
e- ~ at Jharli (Jhajjar). This plant started generating power from the year 2011.
~~ ~ 46.2% of power, l.e. 693 MW, comes to the share of Haryana. This power
S; X is amongst the more expansive power for the State. In the presentn:--6c.:'\ X r-.l scenario of low demand, Haryana Government has decided to surrender its
)0" ....--~~' entire share of power in this Power Plant for a period of one year.
Rajan, Gupta, I.A.S.
A-S(gH~ t, \ f' \ ';7 h'"\J \!
(rh) 7\;- l'\~'
\~bject:
Additional Chief Secretary to Govt. Haryana,Power & Renewable Energy Departments,Haryana Civil Secretariat, Chandigarh.
Dated :..3 ..7::/.2..~.20 J s:
Surrendering of power fromThermal Power Project, Jhajjar.
\" c::\,.~4R,\, S~ ~ .~. ~~
j
Indira Gandhi Super
, r
Government of Haryana shall be grateful, if surrender of
power by the State in IGSTP Jhajjar is accepted by the MJD.j~tryot£'QY{§f,or----,--"""",,, ..•..•.••••"-.-'' ...,,,,,"'---,, ..¥ .••••.•• -,, ••••• -.... ---~.~
Government of India and reallocated to any other State. I shall be grateful
for an early action in this regard.
~~~~) r>;
\YO~ Sincerely,
~~(Rajan Gupta)~-------~~ ['--
~,--. I....,
~Cl--a----"-..--0N--- ...•.,::S-.
N..:>--r- rM D--!C.~)
Shri B.N Sharrna, IASAdditional Secretary I
Govt. of India, Ministry of Power,New Delhi.
~ ) t Additional Chief Secretary to Govt. Haryana,vV""" W....' ~ Power & Renewable Energy Departments,
, T~e . .Secretary r -~--U,--->Ministry of Power, ".r$ ( 01\1)-)Govt. of India, ,... /
~ •.••.•,••• ,••_w"r.""
Shram Shakti Bhawan, ~::::::i Mnxg.New Delhi
o SEP 2015'. ,.
J;.»:t)}S
Subi- Surrender of power from Mouda STPS Stage-I (2x500 M1Vj of MI5NTPC Limited. ~----
1"1 ( • 1-----·--,,-,Please refer to the letter dated 18JJ8.2010 cited under reference vide which
Ministry of POW~t. Covernrner+ of Indi;:; had allocated 156.41 MW power from(2xSOOMW) Mouda Super Ther ...•al Pntw>( Station (Stage-I) or M/ s NTPC Limitedto Madhya Pradesh, A Power Purchase Agreement was also execut-ed betweenerstwhile MP Power Trading Company Limited (now .M.P. Power ManagementCompany Ltd. (MPPMCL)) fmd NTPC U<l (i~ 24.12.2007 for pvrchase of the
, allocated power from Mouda S'TPS(Stage-I),It has been observed that, off late: only about 37.5% of the allocated power
from Mouda STPS Stage-I (2x5UOMW) could be scheduled by the State, as variablecost of power Mouda was on the hjgh(~'lsl',~e ,'IS compared to the power available tothe State from the 9thel tif>rl,·;;n;.~'l"i· ..~,;. ':l'1~.!) "'HI;cl.~f;;[ power rrom other ried-up sources, this situation is ii~dy to prevcil ir: the coming years also. It has,therefore been decided by lVlP?MCL to surrender this 156.41 M\N share of powerallocated to Madhya Pradesl. from l\,1o..:.daS~"'h3St~ge-I of NTPC" In view of the above, as direct ea, it is reque!!cd to kindly de~allo('ate MP'sshare in the above power station w.rh irrur. c: ~!;(\~ec:feet. ,/1, 1.._-'- ------.-.--- CJl/~/\/'v::f-r.:t-c1 / 'V
~Neer~j AgrHVd} -L
Deputy Secretary[;:1('l,':J.1, d('lt<:d
r , r
, ,.
'No. F - 3/58/2012/13 (Vol..'in,lCopy to:1. The Chairman & ;V;,t71<l;:jint: U"CC)'
New Delhi 110 00:1The Chairman, Central Elecrrcity /\f)!l)OfitJ" Sewa Bl1ilWf~n,HK Fnrsm ~inm ~-.JlI 'i'uhn1rti ••••n· I ',- I1 ,..
For information and further ~<;;.?dh.1 "',CI',,": ..,/ ,/
,"'-I would like to invite a re lcrcncc to this to thic; D~')JtL :,~,W'l' 1'1('),8.SG:'l
did J :2. ( 1.).0) ~ un d ['1.0, 9 8~5 dti::i'..J 1,.l.L20 14 on ~hc ~ubj\:n citt.d above u.ud 1(:
I(:qlle"sl thM.~upc om ing NTP;::' i,(~~'('.;/ii·;J1n 61a:tiuri$' locute.I nut~idc the SL:\t? ()[
(;di~b<l {Exccp~ NOl'th l<nr<tr::<lp(lrJ, Sup:::!" 1'h<?nf1~I Fewer St<tHon) may be d~,
a llorn tctl 'it :'\))curly cl/He. ,Mi ni~',l'y of power', Q()vt. of [lldih >,,+e ,[\!ctific.ltjot'l dld,03,1l7,20 i<2 h;,d
gllocr.l te d 4 J 8 MW ,Ofp~)\"er-frotn8:";'f b :'!tnge:t 1:3;<660 MV/) f_l'~d 16fl 1V1\,\' Ilf power, from B~\I'hstagc-tt (2x660) nr NTI'C !;ittw.Jc....; in Biha/", In tilt! rneuuru nc l'ape
vide I~tt~r {tilted 14, t 1..2014 haw, rI!':t;)(J.r<~~ commercial Pl,H;rutiOll of nnc ~Injl.
(tl111lfh) of B~~r11::ltHgt:-tl.(66'! MW] (c<..'py C1'1 •..jv~(;cl) (10111 whi;:h GRlDCO have the
.eritit le me nt of 132,96 ~,trw~vhit:h';j':ibclng ourrently s(h~dulcd, Another llnit of»
Barb ;:-/cagt:.u {ullit;ll~}l is hitdy Lob~ ',c0mmis!:1ibned soon, In vi<:\V of incrr.,,;<:,1;jallocn tlO;)~ horn the Stat~ b~~~{eJNTPC ~nd UMPP plan te, power rrom f),,)r'h
;' Stalion i~.lW;. required. '
would therefore, H'"ql.l~~I:!':',Lhp..t:(I.tj (I G':!>'! H1t~f.j$\ire·power trorn 'Bfll'j)
Sl:~til)n of NTPC (st,l\g~ { 8::, ff)' wr; iell ,11£\.3 ti1 esdy be e n put \\l' commerciul
3 0 OEe 1!J1~ToTlH~ Director (OM)Ministry of PowerGovernment of IndiaShram Shakti Bhawan, Rafi MargNew Delhi - 110001
Sub: Surrender of NTPC Thermal Power allocated to DVe
Ref. 1. MOP, GOI letter no, S/Sl/201O-Th.!l, d1d,09.12.2010 regarding FSTPS·1I12. MOP, GOI letter no. 5/20/2010-Th.lI, dtd.28.09,2010 regarding Nabinagar STPS3. MOP, GOlletter no. 5/14/2009-Th.ll, dtd.1012.2010 regarding MazaffpurTPSExpansion project STPS
Dear Sir,
In terms of allocation of power by MOP,GO! vide above letters under reference, bilateral PPA
between DVC & NTPC was executed from the respective thermal power plants of NTPC. The
d.-tails are given in tabular form as hereunder-
r----·-;:.j~~~·;TNT·PCPower Plant l Quantum of Power Oa-t;'''of Executi0:l0f .I Ag~emeM
r-·--..·--F-a-ri'-.k-k-a-sT-p-S---1-1I----~~8MW (6-:36% of K· I 30.12.2010 I
~Nabmagar STPS I a JV of NTPC & BSEBI 1 54 MW I :~;O/~~f IC- 1980+---26.11.2~1O --
lJV of NTPC & BSEB)
. (
MW) I1-------.-----.-".----"""." -----.+--.--------,------.----:--+----·---··-- __1t Muzaffarpur TPS Expansion Project ( a '10 MW'( 2.6 % of IC- 390MW) 30.12.2010 i
IMeanwhile Hon'bleJharkhand State Electricity Regulatory COO)!Tlissi<;?'1 !tSEf,O disallowed power
, c:, A,
purchase cost from Farakka STPS-III, Nabinagar STPS and Muzaffarpur TPS (xpi!l1sion Project of
NTPC during period from FY 2014-15 & 2015-16 in its Multi Year Distribution Tariff order dtd
04.09.2014. The Hon'ble state commission also did not allow power purchase cost from. Ferakka
STPS -lIl for the period 2013-14. Recovery of the fixed charges is as such not possible from the-»
consumers under command area of DVe as per directive of Hon'ble JSERC in its Tariff order dtd.
0409.2014 as mentioned above.
/.f
in this context it is further mentioned that DVC has unallocated surplus power to the tune of 1200
MW from its new generating units. In spite of repeated persuasions, DVC could not tie up for sale of
above power under long term bi-lateral agreement with any beneficiary f(ies) as on date resulting
significant backing down of its own generation.
Under the above back drop DVC has decided to surrender its share of allocation from Farakka STPS
-m (31.8 MW), Nabinagar STPS (54MWj and Muzaffarpur TPSExpansion Project {lOMWj .. " It is, therefore, requested to kindly look into the issue for reallocation of above power. so that
necessary formalities rnav be made immediately for proposed surrender from the above NTPC
stations.
It is further requested to advise NTPC accordingly so that termination of the Power Purchase..
Agreements executed between DVC and NTPC in respect of Farakka STP$ -Ill, Nabinagar STPS,
Muzatfarpur TPS Expansion Project can be made without any further delay.
, " a) letter no. 5/51/2010- n..u dtd.09.12 .2010 of MOP, GO!.
b) letter no. 5/20/2010-Th.l1 dtd.28.09.201O of MOP, GOL
c) letter no. 5/14/2009-Th.!l dtd.1O.12.2010of MOP, GOLcl) Relevant portion of PPA between DVC and Farakka STPS-In.e) Relevant portion of PPA between DVC and Nabinagar STPS
f) Relevant portion of PPA between DVCand Muzaffarpur TFS Expansion Project.
1. Member (PS), CEAi Sewa Bhawan, R.K. Purarn, New Delhi 110066"".> 2. Member (GO & Dj, (EA, Sewa Bhawan, R.K. Purarn, New Delhi 110066
3. Director (Thermal, DVC) MOP, GOI, Shrarn Shakti Bhawan, Rafi Marg, New Delhi - 11000.1
4. The Member Secretary, ERPC, 14 Golf Club Road, Kolkata - 700033 (Fax No. 033 2422 1805). . . . '. ~.. ~
? The General Manager, ERLDC, 14 Golf Club Road, Kolkata - 700033 (Fax No. 033 24235809)
6. The Director (Commercial), NTPC limited, Scope Complex, Lodhi Road, New Delhi - 110003.
, r 7. The Chief Engineer lie, CEA, Grid Management Division, 6th Floor, Sewa Bhawan, R.K. Puram,
Ministry of Power,Government of India,Shram Shakti Bhawan,Rail Marg,New Delhi- 110001.
-:1.:. (,'0-'"~--/;r:------..
..t 1;.;'~-..-,..-~"''''''
t~\'1Sub:
t)~"\Cl"')'):!
Surrender of Power receivmg from NTPC station,Jhajhar
In reference to subject cited above, looking to the load
trend of Rajasthan Discoms and availability of cheaper power,
Rajasthan state is interested to surrender the power share of••••••••••• -- -"---'-~---.------.-.---"-.-.~ .• ~- --- -'m •••• _ •
Rajasthan of 9.75 MW in NTPC station, Jhajhar forever.
Therefore, you are requested to de-allocate the completeshare of power of Rajasthan in NTPC station, Jhajhar withimmediate effect.
1~~(Sanjay Malhotra)
Pr. Secretary, Energy
•
(
\ ' \1\.1,,- -
, I'
..••• ""':0'
, r
HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED(A Stale Govt. Undertaking)
No.HPSE?BUCE{SO&P)/IS,-5A!2015 - c. / .. c :~To
Dated C' / • (/ • i ~.,
"f· ,-,
The Secretary (Power),Ministry of Power, GOIlt. of India.Shram Shakti Bhawan, Raft Marg.New Delhi·110001.
Subject:· Surrendering of Power from Anta, Auriya and Dadri Power Stations.
Sir,I have t!H~ privilege to share witll you that dunng last one decade Govt. of
Hunachat Pradesn nas been able \0 add substantial Hydro Generation Capacities in the powersystem through various stake holders viz. State Utilities, CPSUs, JVs & IPPs and by March,2014 the installed hydro capacity of HP is pegged at 9000 MW, Thouqn major quantum of thispower flow out to neighbouring States and helps the Grid yet this simultaneously has facilitatedin big w3'i in meeting base load requirements of HP State during summer and winter months.
In light of above mentioned present developments in Hydro power and theemerging Scenario, the demand and supply position of the HP State has been reviewed byGovernmental, r~egufatory and HPSEBl authorities and inprincipal decision has been takentint HP Stale in the first instance shall surrender Its allocated share in Anla, Auria and OadriPower Stations of NTPC as enshrined in the PPA dated 31.01.1994. The detail of theseprojects, liP share ete of power which is requested to be de-allocated for the entire period ofprojects is appended hereunder:
It will be appreciaole.: if you could please take early action on the abovematter ano allocate the power from these stations to other needy entities
The Principal Secretary (Power), Govt. of Himachal Pradesh, Shimla-2 for kindinformation pleases,
_-;)8 Ci.:;:;:nnC:l6. Mana~ling O:recivr. i,n?C Ltd., NiPC O;lnWor., Scope Comp:ex-7l~stltutlonaJ Area, New Oe!hi-110003 for kind information please. It is requested I~take up the matter WIth Ministry of Power. Gol for de-allocation of above power.
The Under Secretary to the Government of India, Thermal+llMinistry of Power, Government of India,Shram Shakti Bhawan.Raf Marg.New Delhi - 110001.
SUBJECT: . SURRENDER OF CENTRAL AllOCATrON OF POWER FROM I3ARH-1ISTPP ~660 MW.
Dear Sir,With reference to our letter no lS!TRDjE&Pj2014-15!l,dated is"
MAY 2015,it is to again remind your good office that the Energy and PowerDepartment, Government of Sikkirn has a share of 1.51% of thermal powerfrom BARH 11 {660 STPP, NTPCj i.e 9.96 MW of share to the state of Sikkirn.However the cost per unit is exceeding Rs 6jKwh and at such a high rate itbecomes totally unviable for the state of Sikkim to continue drawing theallocated share of power. It is therefore requested that the 1.51% of shareallocated for Sikkim may kindl~Jl~ withdrawn and the same reallocatedelsewhere. The Energy and Power,..,SlncerelYregrets the surrender of the powerallocated to Sikkirn
, "
It is also requested that an order for the cancellation of the allocated
/\:.~ \\~abrle may kifOd!Yhbeissue~ aththe earliest s~ce hEnehrgYd.& power dhepartme
br1tis
/, . \ /1la e to payor t e capacity cnarges even tnoug te epartrnent as not een/\s~JletiuHng the power from the said generating unit.
tk-,,·,<tiDelhi being a land locked city with neither coal reserves nor hydel
potential is largely dependent upon CPSUs as major source of its powersupply, The average power purchase cost of Delhi is high vis-a-vis manyStates in India resulting in the levy of a higher electricity tariff, The matter ofcostly power was also discussed with your good self during our meeting on28,04,2015 and you were kind enough to offer that If Delhi wants to surrenderthe power allocated from few central sector stations it will get the fullcooperation in this regard from the Centra! Government
On the basis of the inputs from the deliberations conducted with all thestake holders with an objective to reduce the burden of high electricity tariff, itis proposed to surrender the power from the foHowing central sector stationsin the same sequence of priority as mentioned hereunder-
contd. ..2/-
(
~ 2
9. Ch"amera-III (NHPC) j 29 I Fuff-29-'''MW -aflo'cation to be____,,_..;.__""_.+- ~urrend~~d per~...,.a.,"'C..n"'C..e_n."'C..tIY'---:----:---l10. Parwati-lll (NHPC) i 66 i Full 66 MW allocation to ber..--r----------l I surrendered permanently
11. Tehri HEP (THDC) i 103 i Full 103 MW allocation to be, I surrendered permanently
In view of the above, you are requested to accede to the request ofDelhi Government for surrender of above referred power with immediateeffect and reallocate the same to other needy States.
\r \h \ y,""
\}\J \ '\
. " Shri Piyush Goyal,Hon'ble Minister of State (lie) for Power,Coal and New & Renewable Energy,Govt. of India,Shram Shakti Bhawan, Raft Marg,New Delhi - 110001.
Mini stry of PowerGovt. ofIndiaShrarn Shakti BhawanNew Delhi -- 110 OOi
< <, (6 ~) ((1, _;<;K
p~
Sub; Surrender ofTPDDLsha.re from Dadri - I from 1st September, 2015 to 31st
March,2017,
Ref: Our letter No. F'.11 (41 )J2007/Pow..:rIPart- fl240 I dated 30th July, 2014• I'
Sir,
This is with reference to our aforementioned letter, wherein inter-alia, we hadrequested the Ministry of Power, Govt. of India for surrender of 180 MW of TPDDLshare from Dadri-I for a period of one year i.e. upto 31SI August, 2015,
In respect of the same, the Ministry of Power had agreed to our request andallocated 180 MW of TPDDL share from Dadri-I to the state of Bihar up to~ 1.3S.20~_ 5.
, ,It was also mentioned in the said letter that the situation would be reviewed
again after one year. Accordingly, we have reviewed the power situation and it hasbeen observed that the said power may be surrendered upto 31~I March, 2017. It isalso informed by TPDDL that they are in discussion with the state of Bihar for furtherextending the reallocation of Dadri-I for a further period of 1 to 2 years.
It is therefore, requested that the Ministry of Power, Govt. of India maystreallocate this power to other needy states up to 31 March, 2017.
Yours sincerely,
Copv_J.Q information to: -1. Secretary to Hou'ble Minister of Power. GNCTD2. PS 10 Secretary (Power), GNCTD
The Under Secretary tothe Government of India, TherMinistry of Power, Government of India,Shram Shakti Bhawan,Rafi Marg,New Delhi -110001.
1-11
•
SUBJECT: - SURRENDER OF CENTRAL AllOCATION 0 POWER FROM BARH ....•11STPP -660 MW_
Dear Sir,The E.nergy and Power Department, Government of 5 kkim has a share of 1.51% of
thermal power from BARH 11(660 STPP, NTPC) i.e 9.96 MW f share to the state of Sikkim.However the cost per unit is exceeding Rs6/Kwh and at sue a high rate it becomes totally,unviable for the state of Sikklm to continue drawing the Itocated share of power. It istherefore requested that the 1.51% of share allocated for Si kim may kindlybe withdrawnand the same reallocated elsewhere. The Ene·rgy and ower sincerely regrets thesurrender of the power allocated to Slkkirn
It is atso requested that an order fer the cancellatio of the allocated share maykindly be issued at the earliest since Energy & power depa ment is liable to pay for thecapacity charges even though the department has not bee scheduling the power fromthe said generating unit.
Thanking You,
Copy to;-
I (K.L Gyurmed)rember Secretary/trading
1. Member Secretary (ERPC), Eastern Regional PowerCommittee 14, G~f Club RoadTollygunje-Kolkata-7Dq033.
b ~ &0 ({~I&,rf1 (w~) 8t..~R·1r;,rf) 1~i71C- Ht9~)
e-' ~ ~(1 Ir~~C-1Scanned by CamScanner
FROM :POWER REFFORMSII
~
' .~
r1- .Venu PrasPrrncipalS ad, /As
. eCt(.>tary
i re/e. No ·0I . ln~~1~7
f
FAX NO. :2700398 3 Ma~ 2015 10:08AM P2
SUblect:
D.O. No,_t\t8/o'<i\~'fU5_1~31k
~Govt PUnjab - _
~
Department of P..j oWer
~ Chandigarh, the~:q"4~2cJbSurrendered Share of P I
tOwer by States Ino \ ~ ') ** various Power StOtions.
A) l'(',I
. . Punjab is having surpluspower available after meeting up the demand .In the State from its Own sources as well as external Sources tied up under variouslong term Power Purchase Agreements. Due to this, P$PCL is not scheduling powerfrom Anto. Aurvlo, Dadri and APCPL Jhojcr. Power from these NTPC Thermal Projectscan easily be surrendered permanently as under-
Sr. Name of NTPC Installed Allocated share of UN-allocated Total MWNo. Plants capacity Punjab MW(%) Share of Punjab ( 4+S)
The Under Secretary (Power),Ministry of Power, Govt. of IndiaShram Shakti Bhawan, Rafi MargNew Delhi - 110001 .
Subject: Surrendering of Power Allocation from Unit 2 and 3 from NTPC Bongaigaon.
Ref: Ministry of Power Letter no. 3/6/2015-0M dated 1510 December 2015 regarding thesurrender of power
Sir.
With reference to the aforementioned Ministry of Power letter above and in view of theexpected high energy tariff, MSPDCL with the approval of the State of Manipur.decided to surrenderthe allocation of 31.4MW (15.7MW x 2) from Unit 2 and 3 of NTPC Bongaigaon Thermal PowerStation. tr""
2. It is therefore requested that the Ministry of Power may kindly consider de-allocating thepower from Unit 2 and 3 of NTPC Bongaigaon, details of which is given below:
SI.Installed Manipur Share !
NoStation Capacity Proposal
(in MW) I %age MW
1 , NTPC Bongaigaon Unit 1 250 ! 6.28 15.7 To be allocatedI
2 NTPC Bongaigaon Unit 2 250 6.28 15.7 Full permanent surrender
3 I NTPC Bongaigaon Unit 3 250 6.28 15.7 Full permanent surrenderi
Thanking you,
fdyoursfaithfully .
~."i '~1 lA,___ . Sudhan, IAS)
-- Managing DirectorManipur State Power Distribution
Company LimitedCopy to:
1. The Commissioner (Power), Govt. of Manipur for kind information