Supply Concepts Inc. www.supplyww.com Manufacturing The Worlds Ideas More Effectively
Aug 19, 2015
Group Introduction and Organization 1
Cable Factory Introduction and Organization 2
3
Quality Assurance 4
R&D Ability and Equipment 5
Contents
Q & A
Product & Customer List
Sales Achievement
6
7
Company Expansion Progression
1987/4: Factory founded city, Taiwan
1993/12: Relocated to Taipei
1993/12: Established Wire & Cable Factory in Shenzhen, China
1998/05:Established Factory in Kunshan, JiangSu, China
1999/08: Established 2 Wire Harness & Cable factories in Fuyong
1999/09: (Headquarters) moved to Chungho City, Taipei
2000/03: Established Consumer Products Factory in Dongguan, China
2001/09:Established Industrial Factory in Shenzhen, China
2002/01:Established Plastics Factory in Shenzhen, China
2002/05:Established Wire Factory in Kunshan, China
2002/06:Established Wire & Cable factory in Shenzhen, China
2004/01: Established Additional Plastics factory in Shenzhen, China
2004/06: Cable factory established in Kunshan, JiangSu, China
2010: Company listed on Taiwan stock market in 2010
2011/06: Automotive Factory was established in Jiangsu province in China
2013/05: New BU Group was established in Taipei head office , responsible for the
expansion of the new market, make cooperation with SCI USA
Company Expansion Progression
Factory Group Producing: Custom Wire Harness & Cable, Power Cords, Metal Fabrication, & Plastic Injection Products
Wire & Cable Group
Founded:2004
Revenue: USD 100 million
Capital: USD 30 million+
Scope: 6,000 sq meters
Person: 300
Target Market:
Specializes in the following products and services: consumer &
industrial appliance, communication, medical devices, automotive
new energy, storage, notebook and tablet, mobile handheld
UL License
Cablex MFG
ISO9000 TS16949
Best Conduct
ISO14000
2014&Future
ISO13485 ISO13485
2007
UL License
Company Certification History
2004
Cable MFG
2005
ISO9000 TS16949
2005
2010
QC080000
2012
IPC620
2013
2007 2009 2010 2011
16 18
2008
14.5
9.2
Unit : million USD Sales Achievements
2012 2013
55 40
2014
88 102
Customer Satisfaction
Our Strengths
R&D Capability
Delivery Lead time
Sales
Support Taiwan,10;Shenzhen,8 Kunshan,8
Quality
Normal:2-3weeks Urgent:1-2weeks (with forecast)
Cost
Engineer:10 Patent:18 Integrate Electronic Comp.
CQS:3
QE:5
Full Test Equipment
Vertical Integrate
Good Source for Name Brand Materials
COST
Testing Equipment Item/Description Unit Quantity Item/Description Unit Quantity
ICP-OES Set 1 Dielectric Insulation Tester Set 3
Colorimetry Equipment Set 5 Flame Tester Set 2
Tensile Strength Testing Machine Set 1 Withstanding Voltage Tester Set 2
Sclerometer Set 2 Cold Bending Tester Set 3
Aging Equipment Set 2 Cirrisi Set 20
The White Limit Equipment Set 2 CT Series Set 5
Gravimeter Set 1 Pulse Generator Oscilloscope Set 1
Tensity And Elongation Tester Set 1 Bend Tester Set 1
Viscometer Set 1 Punctire/Insulation Set 1
Thickness Meter Set 1 AC Tester Set 5
Time Domain Reflectometer Set 3 Monitor Tester(RGB,DVI) Set 1
Network Analyzer Set 3 Roin Set 5
Bending Tester Set 2 LCR Meter Set 3
Aging Oven Set 4 Other Set 17
Some of Our Production Equipment
Item/Description Unit Quantity
Vertical Plastic Injection Forming Machine Set 12
Connector Presser Set 4
Strip Machine Set 5
Punch Machine Set 2
Cutting Machine Set 5
Solder Machine Set 5
De-Breaker Set 10
Riveting Machine Set 5
Production Lines Line 16
Quality Control Procedure
Terminal Terminal Retention samples
Retention samples
Sip
Housing Housing
Spec
IQC IPQC IQC IPQC FQC FQC OQC OQC
Cu
stom
er
Cable Cable Retention samples Sip
Spec
Spec
Retention samples
Sip
Storage
Packagin
g
Pro
du
cts
Asse
mb
ly
MAX. Rate
3C CABLE WIRE & CABLE
4KK/M
1.2KK/M
250K/M
65%
55% 48%
Production Capacity
INDUSTRIAL & CUSTOMIZE CABLE
3HARNESS