1/19/2017 Velázquez‐Martínez J.C. ‐ Do not quote without author authorization 1 January 19, 2017 MIT Center for Transportation & Logistics Cambridge, MA Dr. Josué C. Velázquez Martínez Director, SCALE Latin America [email protected]http://josuevelazquezmartinez.com Supply Chain Resilience Evaluation And Mitigation SCREAM Game Objective: Design a robust risk mitigation strategy to minimize the total supply chain cost while maximizing the order fill rate over an uncertain future. Mitigation Strategies Plant Plant DC DC Supplier Backup DC Backup DC Backup Plant Backup Plant Backup WIP Backup WIP Backup FG Backup FG WIP WIP FG FG Safety Stock Backup Supplier CUSTOMER ~N(100, 10) Mitigation Policy Format FG@DC / WIP@Plant / DC / Plant / Supplier Example: 100/100/1/1/1 Backup facility Choose (a) capacity level and (b) time to become available, for a specified set up fee Backup inventory • Any non‐negative value • Locations • WIP: @ the plant • FG: @ warehouse separate from DC 2
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1/19/2017
Velázquez‐Martínez J.C. ‐ Do not quote without author authorization 1
January 19, 2017MIT Center for Transportation & Logistics
Cambridge, MA
Dr. Josué C. Velázquez MartínezDirector, SCALE Latin America