REV DESCRIPTION DATE CHECKED BY: DRAWN BY: PROJECT NO: IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT. SHEET NUMBER SHEET TITLE 3500 DEER CREEK RD PALO ALTO, CA 94304 (650) 681-5000 NOT TO BE USED FOR CONSTRUCTION MOTORS, INC. 192745 AKJ CNS A 12/07/16 ISSUED FOR 50% REVIEW B 09/24/17 RE-ISSUED FOR 50% REVIEW C 05/09/17 RE-ISSUED FOR 50% REVIEW D 06/02/17 RE-ISSUED FOR 100% REVIEW E 06/07/17 RE-ISSUED FOR 100% REVIEW WI009_MADISON MADISON 3801 E WASHINGTON AVE MADISON, WI 53704 R BLACK & VEATCH 6800 W 115th St, Suite 2292 OVERLAND PARK, KS 66211 (913) 458-2000 TITLE SHEET & PROJECT DATA T-1 MADISON WI009_MADISON 3801 E WASHINGTON AVE MADISON, WI 53704 ZONING INFORMATION PERMITTING JURISDICTION: CITY OF MADISON ZONING CLASS: SS-1 SUPERCHARGING STATION ENGINEER OF RECORD CALL BEFORE YOU DIG LOCATION MAP AREA MAP SITE INFORMATION APPLICABLE CODES PROJECT DESCRIPTION DO NOT SCALE DRAWINGS CONTRACTOR NOTE ZONING INFORMATION FLOOD HAZARD AREA NOTE DRAWING INDEX SHEET NO: SHEET TITLE FOR REFERENCE ONLY EQUIPMENT DETAILS A-6 FENCE DETAILS A-8 ELECTRICAL DETAILS E-5 x INSTALL (4) TESLA SUPERCHARGER CABINETS x INSTALL (8) TESLA CHARGING STATIONS x INSTALL (1) QED SWITCHGEAR ASSEMBLY x INSTALL (1) UTILITY TRANSFORMER x INSTALL (1) PEDESTRIAN LIGHT POLE AND FIXTURE A-7 ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2011 WISCONSIN COMMERCIAL BUILDING CODE IBC 2009 WISCONSIN MECHANICAL CODE NEC 2008 WISCONSIN ELECTRICAL CODE IBC 2009 WISCONSIN STRUCTURAL CODE IBC 2009 MFPA-1 WISCONSIN FIRE/LIFE SAFETY CODE WISCONSIN COMMERCIAL BUILDING CODE ADA STANDARDS (WISCONSIN COMMERCIAL BUILDING CODE) IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL PREVAIL UNDERGROUND SERVICE ALERT UTILITY NOTIFICATION CENTER OF WISCONSIN 811 OR 1-800-242-8511 3 WORKING DAYS UTILITY NOTIFICATION PRIOR TO CONSTRUCTION ROBLEY A. EVANS PE # 37439-006 BLACK & VEATCH CORPORATION E TITLE SHEET & PROJECT DATA GENERAL NOTES 1 GN-1 GENERAL NOTES 2 GN-2 OVERALL SITE PLAN A-1 DEMOLITION SITE PLAN A-2 ELECTRICAL DETAILS E-1 ELECTRICAL DETAILS E-2 GROUNDING DETAILS G-1 GROUNDING DETAILS G-2 ENLARGED PROPOSED EQUIPMENT LAYOUT A-3 STRUCTURAL DETAILS S-1 PROPOSED SITE PLAN A-4 ELECTRICAL DETAILS E-3 E-4 ELECTRICAL PLAN SITE ELEVATIONS A-5 SIGNAGE DETAILS GENERAL NOTES 3 GN-3 E-6 UTILITY PLAN CONTRACTOR SHALL COMPLETE INSTALL PER THE SIGNED AND SEALED SET OF DRAWINGS. ANY NECESSARY DEVIATIONS FROM THE DRAWINGS MUST BE SUBMITTED THROUGH AN RFI REQUEST PROCESS WITH ENGINEERING FOR AN APPROVAL PRIOR TO CONTRACTOR PROCEEDING WITH A DEVIATION OF THE SIGNED AND SEALED SET OF DRAWINGS. T-1 CONTRACTOR SHALL VERIFY ALL PLANS, EXISTING DIMENSIONS & CONDITIONS ON THE JOB SITE & SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK. THIS SITE IS LOCATED IN FLOOD ZONE "X". NO BASE FLOOD ELEVATION. AREA DETERMINED TO BE OUTSIDE 500-YEAR FLOOD PLAIN. E E E E E E E E E E E E E E E E E E E E POWER COMPANY: MADISON GAS & ELECTRIC CONTACT: KEITH VANDEN WYMELENBERG (608) 235-0284 COUNTY: DANE LATITUDE (NAD83): 1 LONGITUDE (NAD83): : PROPERTY OWNER: HY-VEE, INC. 5820 WESTOWN PARKWAY WEST DES MOINES, IW 50266 (515) 453-2795 EQUIPMENT SUPPLIER: TESLA MOTORS, INC. 3500 DEER CREEK RD PALO ALTO, CA 94304 (650) 681-5000 CONTACT ENGINEER: RUSSELL POLLOM (913) 458-6274 [email protected]EXISTING SITE ADDRESS: 3801 E WASHINGTON AVE MADISON, WI 53704 PROPOSED TESLA EV SITE ADDRESS: 3829 E WASHINGTON AVE MADISON, WI 53704 SITE SITE PROPERTY SURVEY STRUCTURAL DETAILS S-2 E LANDSCAPING PLAN LS-1 E LANDSCAPING DETAILS AND PLANT SCHEDULE LS-2 E
33
Embed
SUPERCHARGING STATION - Madison, Wisconsin · 2017-07-27 · black & veatch 6800 w 115th st, suite 2292 overland park, ks 66211 (913) 458-2000 title sheet & project data t-1 madison
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
TITLE SHEET &
PROJECT DATA
T-1
MADISON
WI009_MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
ZONING INFORMATION
PERMITTING JURISDICTION: CITY OF MADISON
ZONING CLASS: SS-1
SUPERCHARGING STATION
ENGINEER OF RECORD
CALL BEFORE YOU DIG
LOCATION MAPAREA MAP
SITE INFORMATION APPLICABLE CODES PROJECT DESCRIPTION
DO NOT SCALE DRAWINGS
CONTRACTOR NOTE
ZONING INFORMATION
FLOOD HAZARD AREA NOTE
DRAWING INDEX
SHEET NO: SHEET TITLE
FOR REFERENCE ONLY
EQUIPMENT DETAILS
A-6
FENCE DETAILSA-8
ELECTRICAL DETAILS
E-5
INSTALL (4) TESLA SUPERCHARGER CABINETS
INSTALL (8) TESLA CHARGING STATIONS
INSTALL (1) QED SWITCHGEAR ASSEMBLY
INSTALL (1) UTILITY TRANSFORMER
INSTALL (1) PEDESTRIAN LIGHT POLE AND FIXTURE
A-7
ALL WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES:
2011 WISCONSIN COMMERCIAL BUILDING CODE
IBC 2009 WISCONSIN MECHANICAL CODE
NEC 2008 WISCONSIN ELECTRICAL CODE
IBC 2009 WISCONSIN STRUCTURAL CODE
IBC 2009 MFPA-1 WISCONSIN FIRE/LIFE SAFETY CODE
WISCONSIN COMMERCIAL BUILDING CODE
ADA STANDARDS (WISCONSIN COMMERCIAL BUILDING CODE)
IN THE EVENT OF CONFLICT, THE MOST RESTRICTIVE CODE SHALL
PREVAIL
UNDERGROUND SERVICE ALERT
UTILITY NOTIFICATION CENTER OF WISCONSIN
811 OR 1-800-242-8511
3 WORKING DAYS UTILITY NOTIFICATION PRIOR TO CONSTRUCTION
AWG(5.26MM2) (UL) TYPE TC-ER 90C DRY 75C WET 600V SUN RES DIR BUR OIL RES II
UL 1277 OR c(UL) CIC-TC FT4 --- LL41103 CSA AWM I/II A/B 90C 600V FT4 --- CE ROHS
RED
COMMUNICATION CABLE DETAIL
TO BE PROVIDED BY TESLA
1
2
7
3
4
6
5
19
.2
5"
4.3
8"
9.00" 5.25" 9.00" 3.38"
TESLA SUPERCHARGER CONDUIT
ENTRY DETAIL
(2) DC 3" NPT CONDUIT.
STUB UP SHALL BE 6" OFF
GROUND AND END IN FEMALE
NPT THREADED COUPLING
(SEE NOTE 2)
(1) 3" AC CONDUIT,
(1)1" PE CONDUIT
(SEE NOTE 2)
1. BOLT HOLES FOR REFERENCE ONLY.
2. USE DOTTIE DUCT SEAL COMPOUND PC 6130 (CAT NO LHD1)
TO SEAL ENDS OF CONDUIT (TYP. ALL CONDUITS FOR
SUPERCHARGERS AND CHARGE STATIONS)
3. USE BELL FITTINGS ON ALL AC AND DC CONDUIT STUBS.
NOTES
NO SCALE
DC DCAC
PE
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
ELECTRICAL DETAILS
E-5
CBA
D
NO SCALE
NATIVE SOD
6"
NATIVE
BACKFILL
18
"
NO SCALE
VA
RIE
S
6" 6"
CLEAN
GRANULAR
BACKFILL, 6"
LIFT MAXIMUM,
PLATE TAMP
(1/2"), 95%
COMPACTION
MIN.
UNDISTURBED
SOIL (TYP)
HAND TAMPED 1/2"
GRANULAR
BACKFILL
1" O
F G
RA
NU
LA
R
BA
CK
FIL
L B
ET
WE
EN
CO
ND
UIT
S
1. ANY EXCAVATION LEFT OPEN SHOULD BE SECURELY FENCED OFF.
2. ANY PAVEMENT DAMAGE DURING CONSTRUCTION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO PRE CONSTRUCTION CONDITIONS OR BETTER.
NOTES
EXISTING
GRADE
TYPICAL NON-UTILITY CONDUIT UNDER SOIL TRENCH DETAIL
NO SCALE
DETAIL NOT USED
PROPOSED
PEDESTRIAN
LIGHT POST
PROPOSED 1 1/4"
UNDERGROUND
POWER CONDUIT
NOTES
1. CONDUITS SHALL BE BURIED BELOW FROST LINE AND IN COMPLIANCE
WITH LOCAL AND NATIONAL CODE REQUIREMENTS.
2. REFER TO SHEET E-3 FOR CONDUCTOR REQUIREMENTS WITHIN CONDUITS.
3. REFERENCE SHEET E-1 AND E-2 FOR ADDITIONAL DETAIL.
CAR CHARGER CONDUIT ELEVATION
NO SCALE
E
PROPOSED QED
SWITCHBOARD
ASSEMBLY
PROPOSED
TRANSFORMER
(4) PROPOSED 4"
UNDERGROUND
POWER STUBOUTS
(TYP) (SEE NOTE 3)
PROPOSED 3"
UNDERGROUND
POWER CONDUITS
(TYP)
PROPOSED TESLA
SUPERCHARGER
CABINET (TYP)
PROPOSED TESLA
CHARGING STATION
(TYP)
PROPOSED
UTILITY METER
1-1" RGS CONDUITDOTTIE DUCT SEAL
COMPOUND PC 6130 (CAT NO.
LHD1) (TYP FOR ALL CONDUITS
FOR SUPERCHARGERS AND
CHARGE STATIONS)
1-1" METERING
CONDUIT TO
TRANSITION TO
PVC INSIDE
SWITCHBOARD.
METERING UCT BAY
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
ELECTRICAL DETAILS
E-6
A
D EC
NO SCALENO SCALENO SCALE
DETAIL NOT USED
B
NO SCALE
DETAIL NOT USED
.40
X In
Ir
.5
1
2
4
8
12
16
20
24
@ 6Ir
tr
(S)
long time
alarm
1.5
2
2.5
3
4
5
6
8
10
X Ir
Isd
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tsd
(S)
short time
setting
delay
on off
2
2
3
4
6
8
10
12
15
off
X In
Ii
instantaneous
A
B
C
D
E
F
G
H
J
Ig
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tg
(S)
ground fault
on off
2
teet
1.0
.90
.80
.70
.65
.60
.50
.45
Micrologic 6.0 A
I r I sd
I i
I g
I n
A p
test / reset
menu
N 1 2 3
A B C
100%
40%
P
Q
D
O
M
K
L
I
G
F
E
C
R
B
N
J
H
THE MICROLOGIC 6.0A TRIP UNIT
PROVIDES SELECTIVE AND
GROUND-FAULT PROTECTION
FOR EQUIPMENT (1000 A) (LSIG)
AND A BUILT-IN AMMETER.
A. TRIP UNIT NAME
B. ALPHANUMERIC DISPLAY
C. THREE-PHASE BAR GRAPH
D. SCROLL BUTTON
E. MENU BUTTON
F. LONG-TIME PICKUP (Ir)
SWITCH
G. LONG-TIME DELAY (tr)
SWITCH
H. SHORT-TIME PICKUP (Isd)
SWITCH
I. SHORT-TIME DELAY (tsd)
SWITCH
J. INSTANTANEOUS PICKUP (li)
SWITCH
K. GROUND-FAULT PICKUP (lg)
SWITCH
L. GROUND-FAULT DELAY (tg)
SWITCH
M. TEST PLUG RECEPTACLE
N. GROUND FAULT
PUSH-TO-TRIP BUTTON
O. OVERLOAD INDICATOR LIGHT
P. RESET BUTTON FOR
BATTERY STATUS CHECK
AND TRIP INDICATOR LED
Q. SELF-PROTECTOR INDICATOR
LIGHT
R. GROUND-FAULT INDICATOR
LIGHT
S. SHORT-TIME OR
INSTANTANEOUS TRIP
INDICATOR LIGHT
T. LONG-TIME TRIP INDICATOR
LIGHT
1
-
SECTION 1
.40
X In
Ir
.5
1
2
4
8
12
16
20
24
@ 6Ir
tr
(S)
long time
alarm
1.5
2
2.5
3
4
5
6
8
10
X Ir
Isd
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tsd
(S)
short time
setting
delay
on off
2
2
3
4
6
8
10
12
15
off
X In
Ii
instantaneous
test
1.0
.90
.80
.70
.65
.60
.50
.45
T
S
A
NOTES
1. THE PLUG SETTINGS DEPICTED WITHIN THIS DETAIL SHALL BE USED
ON ALL R-FRAME CIRCUIT BREAKERS REGARDLESS OF AMP RATING.
2. THESE CIRCUIT BREAKER TRIP SETTINGS ARE NOT COORDINATED
WITH UTILITY TRIP SETTINGS.
MAIN OCPD
MICROLOGIC 5.0A
ELECTRONIC TRIP UNIT PANEL
MICROLOGIC 5.0A ELECTRONIC TRIP UNIT DETAIL
CONDUIT STUB UP DETAIL
PROPOSED 3" POWER
CONDUIT STUBBED UP
8" ABOVE EXISTING
GRADE
PROPOSED TESLA
CHARGING STATION
INTERIOR 4" BOLLARD
PROPOSED
CHARGING STATION
CONCRETE FOOTING
EXISTING GRADE
BOTTOM OF FOOTING
PROPOSED TESLA
CHARGING
STATION SKIN
.40
X In
Ir
.5
1
2
4
8
12
16
20
24
@ 6Ir
tr
(S)
long time
alarm
1.5
2
2.5
3
4
5
6
8
10
X Ir
Isd
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tsd
(S)
short time
setting
delay
on off
2
2
3
4
6
8
10
12
15
off
X In
Ii
instantaneous
A
B
C
D
E
F
G
H
J
Ig
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tg
(S)
ground fault
on off
2
teet
1.0
.90
.80
.70
.65
.60
.50
.45
Micrologic 6.0 A
I r I sd
I i
I g
I n
A p
test / reset
menu
N 1 2 3
A B C
100%
40%
P
Q
D
O
M
K
L
I
G
F
E
C
R
B
N
J
H
THE MICROLOGIC 6.0A TRIP UNIT
PROVIDES SELECTIVE AND
GROUND-FAULT PROTECTION
FOR EQUIPMENT (1000 A) (LSIG)
AND A BUILT-IN AMMETER.
A. TRIP UNIT NAME
B. ALPHANUMERIC DISPLAY
C. THREE-PHASE BAR GRAPH
D. SCROLL BUTTON
E. MENU BUTTON
F. LONG-TIME PICKUP (Ir)
SWITCH
G. LONG-TIME DELAY (tr)
SWITCH
H. SHORT-TIME PICKUP (Isd)
SWITCH
I. SHORT-TIME DELAY (tsd)
SWITCH
J. INSTANTANEOUS PICKUP (li)
SWITCH
K. GROUND-FAULT PICKUP (lg)
SWITCH
L. GROUND-FAULT DELAY (tg)
SWITCH
M. TEST PLUG RECEPTACLE
N. GROUND FAULT
PUSH-TO-TRIP BUTTON
O. OVERLOAD INDICATOR LIGHT
P. RESET BUTTON FOR
BATTERY STATUS CHECK
AND TRIP INDICATOR LED
Q. SELF-PROTECTOR INDICATOR
LIGHT
R. GROUND-FAULT INDICATOR
LIGHT
S. SHORT-TIME OR
INSTANTANEOUS TRIP
INDICATOR LIGHT
T. LONG-TIME TRIP INDICATOR
LIGHT
1
-
SECTION 1
.40
X In
Ir
.5
1
2
4
8
12
16
20
24
@ 6Ir
tr
(S)
long time
alarm
1.5
2
2.5
3
4
5
6
8
10
X Ir
Isd
.1
.2
.3
.4
.4
.3
.2
.1
0
I t
tsd
(S)
short time
setting
delay
on off
2
2
3
4
6
8
10
12
15
off
X In
Ii
instantaneous
test
1.0
.90
.80
.70
.65
.60
.50
.45
T
S
A
NOTES
1. THE PLUG SETTINGS DEPICTED WITHIN THIS DETAIL SHALL BE USED
ON ALL R-FRAME CIRCUIT BREAKERS REGARDLESS OF AMP RATING.
2. THESE CIRCUIT BREAKER TRIP SETTINGS ARE NOT COORDINATED
WITH UTILITY TRIP SETTINGS.
MAIN OCPD
MICROLOGIC 5.0A
ELECTRONIC TRIP UNIT PANEL
MICROLOGIC 5.0A ELECTRONIC TRIP UNIT DETAIL
Re
ad
y
>50A
Ala
rm
>90 >105
lr (A)tr @ 6 lr
li (x In)
3.2 OR 3.3
Micrologic
tr
ir ll
70250
225
200
175
150
125
100
80
.5
16
16
16
8
4
2
1
1.515
12
10
8
6
4
3
2
Ir lsd
A. READY LED (GREEN)
B. OVERLOAD PRE-ALARM LED
(ORANGE):90% Ir
C. OVERLOAD ALARM LED (RED):
105% Ir THE TRIP UNIT'S In RATING
CORRESPONDS TO THE MAXIMUM
VALUE OF THE ADJUSTMENT
RANGE
D. TEST PORT
E. ADJUSTMENT DIAL FOR
LONG-TIME PROTECTION DELAY tr
F. ADJUSTMENT DIAL FOR
SHORT-TIME PROTECTION PICKUP
Isd
G. ADJUSTMENT DIAL FOR
INSTANTANEOUS PROTECTION
PICKUP Ii
H. TRIP CURVE
*
*
480VAC L-L
1.5
2
3
4
6
8
10
12
15
.5
1
2
4
8
16
16
16
ll (x ln)
tr @ 6 lr
lr (A)
3
2
1
1 2 3
lr
lsd
BREAKERS ARE RATED
FOR 80%
MICROLOGIC 3.2/3.3 ELECTRONIC TRIP UNIT
70
80
100
125
150
175
200
225
250
A B C
FE GD H
>50A >90 >105
lr (A) tr @ 6 lr li (x In)
3.2 OR 3.3
Micrologic
tr
ir ll
70 250
225
200
175
150
125
100
80
.5
16
16
16
8
4
2
1
1.5 15
12
10
8
6
4
3
2
Ir lsd
JJ CIRCUIT BREAKER
MICROLOGIC 3.2/3.3 ELECTRONIC TRIP UNIT DETAIL
CADWELD CONNECTION DETAIL
PARALLEL THROUGH CONNECTION OF
HORIZONTAL CABLES
PARALLEL HORIZONTAL
CONDUCTORS
CADWELD CONNECTIONS
OR ENGINEER APPROVED EQUAL
BURNDY CONNECTIONS
OR ENGINEER APPROVED
EQUAL
TYPE PT
TO FLAT STEEL SURFACE OR
HORIZONTAL PIPE
HORIZONTAL STEEL
SURFACE
TYPE HS
CABLE DOWN AT 45° TO VERTICAL
STEEL SURFACE INCLUDING PIPE
VERTICAL STEEL SURFACE
TYPE VS
FIELD FABRICATED GREEN STRANDED
INSULATED
BOND JUMPER
TYPE 2-YA-2
TWO HOLE - LONG BARREL LENGTH
COPPER LUGS
TYPE YA-2
SPLICE OF HORIZONTAL
CABLES
HORIZONTAL SPLICE
TYPE SS
CABLE DOWN AT 45° TO RANGE OF
VERTICAL PIPES
VERTICAL PIPE
TYPE VS
PARALLEL DEAD END TAP OR
HORIZONTAL THRU CONDUCTOR
TYPE PC
PARALLEL HORIZONTAL
CONDUCTORS
TEE OF HORIZONTAL RUN AND
TAP CABLES
HORIZONTAL TEE
TYPE TA
THROUGH CABLE TO TOP OF GROUND
ROD
THROUGH CABLE TO
GROUND ROD
TYPE GT
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
GROUNDING DETAILS
G-1
B
NO SCALE
A
NO SCALE
D
NO SCALE
C
GROUNDING PLAN
CADWELD CONNECTION
(EXOTHERMIC WELD)
PROPOSED GROUND RING
MECHANICAL CONNECTION
GROUNDING LEGEND
GROUND ROD
B
PROPOSED 5/8"x8'-0" GROUND
ROD, SEE DETAIL A, SHEET G-2
C
PROPOSED SERVICE GROUND,
SEE DETAIL C, THIS SHEET
D
PROPOSED SUPERCHARGER
CABINET GROUND FOR EMC,
SEE DETAIL C, THIS SHEET
A
GROUND BAR/LUG WITHIN
PROPOSED EQUIPMENT
A (TYP)
4321
D(TYP)
#6 AWG SOLID COPPER
GROUNDING ELECTRODE
CONDUCTOR
CHASSIS MOUNT
GROUND BAR (TYP)
PROPOSED 3"
UNDERGROUND
CONDUITS
PROPOSED
SWITCHGEAR
ASSEMBLY
GRND
TESLA CHARGING
POST (TYP)
NE
U
FACTORY
INSTALLED
GROUND BAR(S)
GRND
INCOMING
MAIN BREAKER /
METERING I-LINE PANEL
#3 AWG COPPER
EQUIPMENT GROUNDING
CONDUCTOR (VEHICLE 2)
#6 AWG EARTH GROUND COPPER
GROUNDING ELECTRODE
CONDUCTOR FOR EMC
(GROUND ROD)
#12 AWG GND
WITHIN TESLA
COMM CABLE
#3 AWG COPPER
EQUIPMENT GROUNDING
CONDUCTOR
#3 AWG
COPPER
EQUIPMENT
GROUNDING
CONDUCTOR
#12 AWG GND WITHIN
TESLA PROVIDED
COMM CABLE (TYP)
PROPOSED 3"
UNDERGROUND
CONDUIT
VEHICLE CONNECTOR
(TYP OF 2)
#3 AWG CAPABLE
COPPER EQUIPMENT
GROUND LUG
(CONTRACTOR
PROVIDED LUG)
NO SCALE
GROUNDING SCHEMATIC
GROUND LUG TERMINATION DETAIL
PROPOSED TESLA
SUPERCHARGER
(TYP)
PROPOSED 5/8"x8'-0"
GROUND ROD (1 PER 2
SUPERCHARGER CABINETS)
#3 AWG COPPER
EQUIPMENT GROUNDING
CONDUCTOR (VEHICLE 1)
#6 AWG COPPER EQUIPMENT
GROUND LUG (CONTRACTOR
PROVIDED LUG)
#6 AWG AC COPPER
EQUIPMENT GROUNDING
CONDUCTOR
#4 AWG COPPER EQUIPMENT
GROUNDING CONDUCTOR
(TYP)
B
C
(TYP)
MANUFACTURER-PROVIDED
MECHANICAL EQUIPMENT
BOND PER NEC 250.90
#6 AWG SOLID COPPER
GROUNDING ELECTRODE
CONDUCTOR
16'-0"
IDEAL
SPACING
PROPOSED 5/8"x8'-0" GROUND ROD
(PER UTILITY REQUIREMENT)
IF SPACE IS LIMITED, THEN
MEET 6'-0" MINIMUM SPACING
GROUNDING NOTES
NOTES
1. ALL GROUND BARS SHALL HAVE STAMPED IN TO THE METAL "IF STOLEN DO
NOT RECYCLE."
2. ALL HARDWARE SHALL BE STAINLESS STEEL 3/8" DIAMETER OR LARGER.
ALL HARDWARE 18-8 STAINLESS STEEL INCLUDING LOCK WASHERS, COAT
ALL SURFACES WITH AN ANTI-OXIDANT COMPOUND BEFORE MATING.
3. FOR GROUND BOND TO STEEL ONLY: INSERT A CADMIUM FLAT WASHER
BETWEEN LUG AND STEEL, COAT ALL SURFACES WITH AN ANTI-OXIDANT
COMPOUND BEFORE MATING.
4. NUT & WASHER SHALL BE PLACED ON THE FRONT SIDE OF THE GROUND
BAR AND BOLTED ON THE BACK SIDE. INSTALL BLACK HEAT-SHRINKING
TUBE, 600 VOLT INSULATION, ON ALL GROUND TERMINATIONS. THE INTENT IS
TO WEATHERPROOF THE COMPRESSION CONNECTION.
5. SUPPLIED AND INSTALLED BY CONTRACTOR.
6. ENSURE THE WIRE INSULATION TERMINATION IS WITHIN 1/8" OF THE BARREL
(NO SHINERS).
7. TESLA CHARGERS HAVE INTERNAL HIGH IMPEDANCE GROUND FAULT
PROTECTION (10MΩ).
8. EMC - ELECTROMAGNETIC COMPATIBILITY
SUPERCHARGER GROUNDING DETAIL
PROPOSED
SUPERCHARGER CABINET
#6 AWG GROUNDING
CONDUCTOR FROM
SUPERCHARGER
CABINET TO THE
PROPOSED GROUND
ROD - EMC
12
" M
IN
(1) PROPOSED 3"
CONDUIT FROM
PROPOSED SERVICES
SWITCHGEAR
5/8" DIA. x 96.0"
COPPER CLAD
GROUND ROD
GRADE
(2) PROPOSED 3"
CONDUIT TO PROPOSED
CHARGING POSTS
PROPOSED
SUPERCHARGER CABINET
#6 AWG GROUNDING
CONDUCTOR FROM
SUPERCHARGER
CABINET TO THE
PROPOSED GROUND
ROD - EMC
12
" M
IN
(1) PROPOSED 3"
CONDUIT FROM
PROPOSED SERVICES
SWITCHGEAR
5/8" DIA. x 96.0"
COPPER CLAD
GROUND ROD
GRADE
(2) PROPOSED 3"
CONDUIT TO PROPOSED
CHARGING POSTS
SUPERCHARGER GROUNDING DETAIL EXTERIOR TWO HOLE LUG DETAIL
S/S NUT
S/S LOCK
WASHER
S/S FLAT
WASHER
3/8" DIA. x1 1/2"
BLACK HEAT SHRINK
UV RATED
TINNED COPPER
GROUND BAR
S/S BOLT (1 OF 2)
S/S FLAT WASHER
EXTERNAL TOOTHED
1/16" MINIMUM SPACING
CLOSED BARREL, FOR ALL
EXTERIOR TWO-HOLE
CONNECTORS
CLEAR HEAT
SHRINK
CONDUCTOR INSULATION
TO BUTT UP AGAINST THE
CONNECTOR BARREL
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
GROUNDING DETAILS
G-2
A
NO SCALE
B
NO SCALE
C
NO SCALE
D
NO SCALE
E
NO SCALE
F
NO SCALE
DETAIL NOT USEDDETAIL NOT USED DETAIL NOT USED
DETAIL NOT USED
HEAVY DUTY NUT
PROPOSED CONCRETE SLAB
PROPOSED 5/8" HILTI KWIK
BOLT TZ STAINLESS STEEL
ANCHORS 3 1/8" EFFECTIVE
EMBEDMENT MIN. (ESR# 1917)
PROPOSED SWITCHGEAR
ASSEMBLY CABINET
QED SWITCHGEAR MOUNTING DETAIL
BOTTOM VIEW
SECTION 1
SE
E N
OT
E 1
SEE NOTE 1
NOTES
1. SEE FLOOR PLAN IN DETAIL
A, SHEET E-4 FOR
MOUNTING HOLE LOCATION
AND SWITCHGEAR BAY
DIMENSIONS.
2. SEE ELEVATION IN DETAIL
A, SHEET E-4 FOR BASE
CHANNEL DIMENSION.
3. MINIMUM 6" CONCRETE
EDGE DISTANCE
REQUIRED FOR PROPOSED
ANCHORAGE.
TYPICAL BOTTOM VIEW LAYOUT
OF (1) QED SWITCHGEAR BAY.
SEE NOTE 1
1
-
BELLEVILLE WASHER
3/4" DIA. MOUNTING HOLES
OFFSET 3" FROM SIDES (TYP)
2.94"
SE
E N
OT
E 2
BASE CHANNEL
FRONT OF QED SWITCHGEAR BAY
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
STRUCTURAL DETAILS
S-1
NO SCALENO SCALE
NO SCALE
A
NO SCALE
B
NO SCALE
C
NO SCALE
D
NO SCALE
E
NO SCALE
F
NO SCALENO SCALE
CONCRETE PAD DETAIL
SEE PLAN
#4 BARS @ 12"
O.C. EACH WAY
8"
PROPOSED
CONCRETE
PROPOSED COMPACTED
CLEAN GRAVEL
UNDISTURBED SOIL
OR PREPARED
SUBGRADE (95%
STANDARD PROCTOR)
GRADE
4" M
IN
PROPOSED 4" TYPE IV
EXTRUDED POLYSTYRENE
INSULATION
6"
3000 PSI
MINIMUM
CONCRETE
RUBBED FINISH
ABOVE GRADE
GALVANIZED
STEEL ANCHOR
BOLTS (SUPPLIED
BY POLE
MANUFACTURER)
1" CHAMFER
3"
SECTION
PEDESTRIAN LIGHT POLE BASE DETAIL
BO
LT
P
RO
JE
CT
IO
N P
ER
MF
G R
EQ
UIR
EM
EN
TS
3"
REBAR TIES
@3" O.C., TOP
(TYP OF 3)
1 1/4" SCHEDULE 40 PVC IN &
OUT OF BASES
#4 BARE COPPER GROUND WIRE FROM GROUND
ROD STUBBED UP THROUGH BASE 18"
BOND #4 COPPER
GROUND WIRE TO
REBAR
#3 HOOPS @ 12" O.C.
6"
3"
MIN
GRADE
1'-8"
1'-8"
DRILLED PIER
8 #6
5'-0
"
STUB UP PVC
1/2" INTO HOLE
CADWELD
CONNECTION
ILLUMINATED CHARGING STATION FOOTING DETAIL
3'-6"
1'-9
"
PLAN
C
S-2
CONCRETE
FOOTING
NOTES:
1. CONTRACTOR TO PICK CAST IN PLACE OR EPOXY METHOD
BASED ON FIELD MEASUREMENTS AND JURISDICTIONAL
REQUIREMENTS. (4) 5/8" DIAMETER THREADED ROD
STAINLESS STEEL OR HOT DIPPED GALVANIZED, 4" MINIMUM
EFFECTIVE EMBEDMENT, 2" MINIMUM EXPOSED ABOVE
CONCRETE
CAST IN PLACE METHOD:
ASTM F1554, GR. 36 HDG OR ENGINEERING APPROVED EQUAL
ANCHORS USING TESLA-PROVIDED JIG
EPOXY METHOD:
ASTM F593 SS OR ENGINEERING APPROVED EQUAL ANCHORS
SET WITH RED HEAD EPCON C6+ EPOXY IN DRILLED HOLES
LOCATED USING TESLA-PROVIDED JIG
2. FASTENERS: (2) TOTAL 5/8" NUTS AND (2) TOTAL 5/8" WASHERS
PER ANCHOR NUT AND WASHER MATERIAL TYPE TO MATCH
ANCHOR MATERIAL (2) 5/8" NUT AND WASHER ABOVE BOLLARD
FLANGE, (1) BELOW
PROPOSED
OR EXISTING
CURB
GRADEGRADE
CONDUIT STUB (CENTER
BARS MAY BE CUT FOR
CONDUIT PENETRATION)
CAR SIDE
EXPANSION
JOINT
2'-6
"
3" M
IN
CONCRETE
FOOTING
2'-0" HOOK
180° STD.
HOOK (TYP)
3" M
IN
#5 @ MAX 10" O.C.
EACH WAY TOP
AND BOTTOM
(TYP)
3" MIN
PROPOSED CHARGING
STATION ANCHOR
(SEE NOTES ABOVE)
3" MIN
3" MIN
3" M
IN
6"
PROPOSED 6"
COMPACTED
CLEAN GRAVEL
PROPOSED 4"
TYPE IV EXTRUDED
POLYSTYRENE
INSULATION
DETAIL NOT USED DETAIL NOT USED
1/8"x1" DEEP SAWCUT JTS
4'-0" SPACING
TYPICAL SIDEWALK DETAIL
CONCRETE
SIDEWALK
4"
(M
IN
)
6" COMPACTED
SUBGRADE
NOTE:
REFERENCE GN-3 FOR SIDEWALK CONSTRUCTION REQUIREMENTS.
6 x 6 - W2xW2 WELDED WIRE
FABRIC
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
STRUCTURAL DETAILS
S-2
NO SCALENO SCALE
NO SCALENO SCALENO SCALE
A
NO SCALE
B
NO SCALE
C
NO SCALE
D
NO SCALE
E
NO SCALE
F
NO SCALENO SCALE
DETAIL NOT USEDDETAIL NOT USEDDETAIL NOT USED
STANDALONE METER CAN UNISTRUT SUPPORT
STANDALONE CUSTOMER PROVIDED TUV INSTRUMENT RATED METER CAN ON UNISTRUT SUPPORT
3'-0
"
METER CAN BASED ON
UTILITY SPECIFICATIONS
12"
SP
AC
ED
P
ER
ME
TE
R
AN
CH
OR
AG
E
5'-8
"
MA
X
24" DIAMETER
3" (TYP)
UNISTRUT MUST BE
ABLE TO ADJUST UP
AND DOWN (TYP)
SEE CAR CHARGER
CONDUIT ELEVATION
DETAIL FOR CONDUIT
SIZE AND COUNT
PVC CONDUIT FOR METER CAN
GROUND WIRE ATTACHED TO
DRIVEN GROUND ROD
CONCRETE
FOOTING (TYP)
3"
(T
YP
)
GRADE
P1000T UNISTRUT WITH 2 1/2"
STD PIPE U-BOLT (TYP)
2 1/2" STD PIPE
2.88" O.D.
(3) #3 REBAR @ 2" O.C.
(8) #5 REBAR
EVENLY
SPACED AROUND
DIAMETER
#3 REBAR AT
12" SPACING
BOLTDOWN DETAIL
4.7
2"
[1
20
mm
]
3"
[75mm]
3.75"
[95mm]
1'-8"
[510mm]
5.5"-6"
140mm-152mm
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
LANDSCAPING PLAN
LS-1
NO SCALE
LANDSCAPING PLAN
PROPOSED TREE
CANOPY, ABOVE
PROPOSED
BUSH (TYP)
-
LS-2
-
LS-2
3'-4"
O.C.
5'-3"
O.C.
2'-6
" O
.C
.
(T
YP
)
16'-8"
O.C.
20'-1"
O.C.
9'-0"
O.C.
4'-9
" O
.C
(T
YP
)
5'-0"
O.C.
1'-1
0" O
.C
.
PROPOSED TREE
CANOPY, ABOVE
-
LS-2
NOTES
TYPICAL GROUNDCOVER PLANTING
MINIMUM 45°
SLOPE ON SIDES
OF PLANTING PIT
1. THOROUGHLY MIX IN SOIL AMENDMENTS TO DEPTH
OF 8" THROUGHOUT GROUNDCOVER AREA OF BEDS.
2. HAND TAMP TO BACK TO REMOVE AIR POCKETS.
3. WATER IMMEDIATELY FOLLOWING PLANTING UNTIL
NO MORE WATER IS ABSORBED.
4. SPACE AS SHOWN ON PLAN.
FINISHED GRADE
MULCH TO A
DEPTH OF 3"
PERENNIAL (TYP)
REV DESCRIPTIONDATE
CHECKED BY:
DRAWN BY:
PROJECT NO:
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A
LICENSED PROFESSIONAL ENGINEER, TO ALTER THIS
DOCUMENT.
SHEET NUMBER
SHEET TITLE
3500 DEER CREEK RD
PALO ALTO, CA 94304
(650) 681-5000
N
O
T
T
O
B
E
U
S
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
MOTORS, INC.
192745
AKJ
CNS
A 12/07/16 ISSUED FOR 50% REVIEW
B 09/24/17 RE-ISSUED FOR 50% REVIEW
C 05/09/17 RE-ISSUED FOR 50% REVIEW
D 06/02/17 RE-ISSUED FOR 100% REVIEW
E 06/07/17 RE-ISSUED FOR 100% REVIEW
WI009_MADISON
MADISON
3801 E WASHINGTON AVE
MADISON, WI 53704
R
BLACK & VEATCH
6800 W 115th St, Suite 2292
OVERLAND PARK, KS 66211
(913) 458-2000
LANDSCAPING PLAN
LS-2
BA
D
NO SCALE
PLANT NOTES AND SCHEDULE
NO SCALE
PLANT SCHEDULE
CODE BOTANICAL NAME COMMON NAMEQTY
SIZE (AT
CONSTRUCTION)
SPACING
SPECIFICATIONS (AT FULL SIZE)
TREES
TO MATCH TREES BEING
REMOVED
2 AS SHOWN
BUSHES6
GROUND COVER
OTHER
C
GENERAL TREE PLANTING DETAIL
NO SCALE
ROOT BALL DIAMETER
3 TIMES
ROPES AT TOP OF ROOT BALL SHALL
BE CUT, REMOVE TOP
1
3
OF BURLAP.
ALL NON-BIODEGRADABLE MATERIAL
SHALL BE COMPLETELY REMOVED
MIN 45° SLOPE
ON SIDES OF
TREE PIT
COMPACT SUBSOIL TO FORM 6"
PEDESTAL TO PREVENT SETTLING
BACKFILL WITH
EXISTING SOIL (IN
SOME INSTANCES
LAWN WILL BE
PLANTED OVER THIS
AREA)
MULCH TO A DEPTH
OF 3" (KEEP MULCH 6"
AWAY FROM TREE
TRUNK)
1. SITUATE ROOT BALL SO THAT TOP OF ROOT BALL
IS 2" ABOVE FINISHED GRADE.
2. SCARIFY SIDES AND BOTTOM OF TREE PIT.
3. BACKFILL TREE PIT WITH EXISTING SOIL AND
WATER UNTIL NO MORE WATER IS ABSORBED.
4. DO NOT ALLOW AIR POCKETS TO FORM WHILE
BACKFILLING.
5. INSTALL A MIN. 4'-0" DIAMETER MULCH RING AT A
MIN. DEPTH OF 3" FOR TREES IN LAWN AREA.
6. TREES NEED TO BE STAKED ONLY WHEN EXTREME
WIND MAKES SUCH SUPPORT NECESSARY. IF
STAKING IS NECESSARY CONTACT THIS OFFICE
AND A DETAIL WILL BE PROVIDED.
FINISHED GRADE
GENERAL TREE PLANTING NOTES
DETAIL NOT USED
1. ALL PLANTS SHALL BE WATERED THOROUGHLY TWICE DURING THE FIRST 24 HOUR
PERIOD AFTER PLANTING. ALL PLANTS SHALL THEN BE WATERED WEEKLY, AND MORE
FREQUENTLY DURING TIMES OF EXTREME HEAT, FOR THE DURATION OF THE FIRST
GROWING SEASON.
NOTE
NO SCALE
PANICUM VIRGATUM
SHENANDOAH SWITCH
GRASS
AS SHOWN4 FT TALL, 2-3 FT WIDE
NOTES
TYPICAL GROUNDCOVER PLANTING
MINIMUM 45°
SLOPE ON SIDES
OF PLANTING PIT
1. THOROUGHLY MIX IN SOIL AMENDMENTS TO DEPTH
OF 8" THROUGHOUT GROUNDCOVER AREA OF BEDS.
2. HAND TAMP TO BACK TO REMOVE AIR POCKETS.
3. WATER IMMEDIATELY FOLLOWING PLANTING UNTIL
NO MORE WATER IS ABSORBED.
4. SPACE AS SHOWN ON PLAN.
FINISHED GRADE
MULCH TO A
DEPTH OF 3"
PERENNIAL (TYP)
SITE NUMBER: WI009_MADISON SITE NAME: MADISON SITE ADDRESS: 3801 E. WASHINGTON AVE. MADISON, WI 53704 DATE 06/15/17 APPLICANT: TESLA MOTORS INC. CONTACT: RUSSELL POLLOM BLACK & VEATCH (913) 458-6274
1
PROPOSED CHARGING STATION
SITE LOCATION
BLACK & VEATCH CORPORATION – 6800 115TH STREET SUITE 2292- OVERLAND PARK, KS 66211 – 913-458-2000
The included Photographic Simulation(s) are intended as visual representations only and should not be used for construction purposes. The materials represented within the included Photographic Simulation(s) are subject to change.
VIEW 1
VIEW 2
VIEW 3 VIEW 4
2
PROPOSED TESLA EQUIPMENT ENCLOSURE
PROPOSED TESLA CHARGING STATIONS
BLACK & VEATCH CORPORATION – 6800 115TH STREET SUITE 2292- OVERLAND PARK, KS 66211 – 913-458-2000
3
PROPOSED TESLA CHARGING STATIONS
BLACK & VEATCH CORPORATION – 6800 115TH STREET SUITE 2292- OVERLAND PARK, KS 66211 – 913-458-2000
PROPOSED TESLA EQUIPMENT ENCLOSURE
PROPOSED TRANSFORMER
4
PROPOSED TESLA CHARGING STATIONS
BLACK & VEATCH CORPORATION – 6800 115TH STREET SUITE 2292- OVERLAND PARK, KS 66211 – 913-458-2000
PROPOSED TESLA EQUIPMENT ENCLOSURE
PROPOSED LIGHT FIXTURE
5
PROPOSED TESLA CHARGING STATIONS
BLACK & VEATCH CORPORATION – 6800 115TH STREET SUITE 2292- OVERLAND PARK, KS 66211 – 913-458-2000
PROPOSED TESLA EQUIPMENT ENCLOSURE
PROPOSED LIGHT FIXTURE
丁esla Motors Supercharger Station
Proposed Location (軟‘卸叱CD血[OAく5TTE P」小
sua88831
Text Box
Tesla Supercharger Station 7 angled become 8 straight stalls
sua88831
Line
sua88831
Line
sua88831
Line
sua88831
Text Box
New planter with bark mulch relocated tree and additional bushes.