Top Banner
Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced Soil (GRS) Abutments
20

Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Dec 29, 2015

Download

Documents

Bennett Conley
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

October 8, 2008Spokane, WA

Doug Walters, P.E.King County DOT

Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced Soil (GRS) Abutments

Page 2: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Project Location

Page 3: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Existing Log Stringer Bridge

Page 4: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Bridge Deck

Page 5: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Typical Bridge Traffic Prior to Load Restrictions

Page 6: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Deficiencies

Structural• Timber cribbing abutments & log stringers damaged• Minor scour• 1997- Placed temporary shoring

– load limit of 3 tons

Environmental• Cited by the WA Department of Fish and Wildlife

– Temporary shoring within stream channel

Page 7: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

West abutment temporary shoring

I-Beam on Ecology Blocks

Page 8: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

East Abutment Temporary Shoring

Shoring Support

Page 9: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Typical rot on log stringers

Page 10: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Superstructure: Prefabricated Steel Truss

Page 11: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Superstructure Selection

• Hydraulic Opening – Above 100 year flood elevation – Changing road grade

• additional environmental permitting

• Narrow Haul Road

Page 12: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Superstructure: Prefabricated Steel Truss

3ft clear space

Page 13: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Foundation ConsiderationsBorings • Alternating layers of medium dense alluvial gravel, sand,

and silt

Abutment Foundation • Shallow foundation• Base of foundation below stream’s thalwag elevation

Sheet Pile Cutoff Walls • Allow dry construction• Provide additional scour protection

Page 14: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

GRS Abutment Selection

Constructability• Avoid long concrete haul• Not weather dependent• Reduced time of construction

Cost Savings• Materials• General labor• Standard equipment

Environmental• No concrete placement

Page 15: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

GRS Abutment Design Outline

• King County preliminary GRS abutment – NCHRP Report 556 “Design and construction of GRS

abutments”

• Mike Adams (FHWA) reviewed & refined design – Provided GRS design detail with layout

– continue to provide evaluation, design, and construction support

Page 16: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

BRIDGE LAYOUT

22 ft

PLAN

104 ft

25 ft

14 ft

Page 17: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

GRS ABUTMENT DETAIL

FINISHED GRADE LINE

Page 18: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

CMU Block Schedule

11 ft

23 ft

5 ft

11 ft

9 ft

36 ft

Page 19: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

Tasks to be completed

• Finalize Design

• Bid January 2009

• Construction June 2009

Page 20: Sunday Creek Bridge #364C October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT Sunday Creek Bridge Replacement Utilizing Geosynthetic Reinforced.

Sunday Creek Bridge #364C

THANK YOU!Question?