Summary of the AWAKE Technical Board Meeting September 2014 – March 2015
Jan 11, 2016
Summary of the AWAKE Technical Board Meeting
September 2014 – March 2015
2
Technical Board Meetings• 5th TB: 24 September 2014 (Greifswald)
– Vacuum design status and issues, Plasma cell status, Proposal of TRIUMF contribution• TRIUMF joins AWAKE Collaboration• Issues for vacuum: vacuum specifications, vacuum separation window• Start of discussions with plasma cell company (GRANT): e.g. clean plasma cell delivered in Feb 2015
3
Technical Board Meetings• 6th TB: 6 November 2014
– New vacuum separation window, impact on RP, impact on spectrometer, Layout of common proton and electron beam-line, plasma cell integration, planning• Vacuum requirement specification• decision on vacuum window: 0.2mm Al. Factor 20 lower background. No absorber
downstream the window.• Definition of plasma cell: 12m (10+2m), move plasma cell by 2m. • integration of plasma cell and common proton and electron beam-line
4
Technical Board Meetings• 7th TB: 12 December 2014
– Vacuum simulation results, electron spectrometer magnet, proton beam line optics, updated layout of the AWAKE area, RF synchronization update, plasma cell alignment. • HB4 magnet will be used as electron spectrometer• streak camera optical line to be defined• layout downstream the plasma cell• first ideas on the plasma cell support
5
Technical Board Meetings• 8th TB: 12 February 2015
– Status of e-beam magnets, update on e-spectrometer, update on RF synchronization, plasma cell measurements, RP maps, planning• Strategy for laser dump design/production/payment• plasma cell support responsibilities defined• Updated realistic planning for plasma cell: clean plasma cell delivered in July 2015. • layout of RF signal generation and distribution for AWAKE• electron line magnet design• RF signal requirements• Triumf magnets for electron line• compressor design • Electron spectrometer vacuum window • Shielding for AWAKE experimental area• BI planning
6
Technical Board Meetings• 9th TB: 11 March 2015
– CSR preparation, BTVs and light transmission, TRIUMF status, Update on integration, electron source performance, laser dump, Safety files• Compressor design defined• RF signal requirements• TRIUMF: BPM design for 40mm completed, approved in February. 60mm design underway• Cockcroft contributions to emittance diagnostics• 80% of the descriptive part of the safety file is done• demonstrative part by October 2015• Streak camera position to define• e-spectrometer optical line, proton beam halo measurements.
7
Technical Board Meetings• 5th TB: 24 September 2014 (Greifswald)
– Vacuum design status and issues, Plasma cell status, Proposal of TRIUMF contribution• Issues for vacuum: vacuum specifications, vacuum separation window• Start of discussions with plasma cell company (GRANT): e.g. clean plasma cell delivered in Feb 2015• TRIUMF joins AWAKE Collaboration
• 6th TB: 6 November 2014– New vacuum separation window, impact on RP, impact on spectrometer, Layout of common proton and electron beam-line, plasma cell integration, planning
• Vacuum requirement specification• decision on vacuum window: 0.2mm Al. No absorber downstream the window.• Definition of plasma cell: 12m (10+2m), move plasma cell by 2m. • integration of plasma cell and common proton and electron beam-line
• 7th TB: 12 December 2014– Vacuum simulation results, electron spectrometer magnet, proton beam line optics, updated layout of the AWAKE area, RF synchronization update, plasma cell
alignment. • HB4 magnet will be used as electron spectrometer• streak camera optical line to be defined• layout downstream the plasma cell• first ideas on the plasma cell support
• 8th TB: 12 February 2015– Status of e-beam magnets, update on e-spectrometer, update on RF synchronization, plasma cell measurements, RP maps, planning
• Strategy for laser dump design/production/payment• plasma cell support responsibilities defined• Updated realistic planning for plasma cell: clean plasma cell delivered in July 2015. • layout of RF signal generation and distribution for AWAKE• RF signal requirements• Triumf magnets for electron line• ompressor design • Electron spectrometer vacuum window • Shielding for AWAKE experimental area• BI planning!
• 9th TB: 11 March 2015– CSR preparation, BTVs and light transmission, TRIUMF status, Update on integration, electron source performance, laser dump, Safety files
• Compressor design defined• RF signal requirements• TRIUMF: BPM design for 40mm completed, approved in February. 60mm design underway• Cockcroft contributions to emittance diagnostics• 80% of the descriptive part of the safety file is done• demonstrative part by October 2015• Streak camera position to define• e-spectrometer optical line, proton beam halo measurements.
8
AWAKE Technical Board
• Issues are well followed up• Collaboration between the different work packages has strongly improved
– Still room for more involvement• Many iterative meetings in between the TB• leads to conclusions in TB• Minutes are an extremely useful tool to track actions and decisions.
– Read them carefully!• Planning is updated and available