Page 1: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

Summary of the AWAKE Technical Board Meeting

September 2014 – March 2015

Page 2: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

2

Technical Board Meetings• 5th TB: 24 September 2014 (Greifswald)

– Vacuum design status and issues, Plasma cell status, Proposal of TRIUMF contribution• TRIUMF joins AWAKE Collaboration• Issues for vacuum: vacuum specifications, vacuum separation window• Start of discussions with plasma cell company (GRANT): e.g. clean plasma cell delivered in Feb 2015

Page 3: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

3

Technical Board Meetings• 6th TB: 6 November 2014

– New vacuum separation window, impact on RP, impact on spectrometer, Layout of common proton and electron beam-line, plasma cell integration, planning• Vacuum requirement specification• decision on vacuum window: 0.2mm Al. Factor 20 lower background. No absorber

downstream the window.• Definition of plasma cell: 12m (10+2m), move plasma cell by 2m. • integration of plasma cell and common proton and electron beam-line

Page 4: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

4

Technical Board Meetings• 7th TB: 12 December 2014

– Vacuum simulation results, electron spectrometer magnet, proton beam line optics, updated layout of the AWAKE area, RF synchronization update, plasma cell alignment. • HB4 magnet will be used as electron spectrometer• streak camera optical line to be defined• layout downstream the plasma cell• first ideas on the plasma cell support

Page 5: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

5

Technical Board Meetings• 8th TB: 12 February 2015

– Status of e-beam magnets, update on e-spectrometer, update on RF synchronization, plasma cell measurements, RP maps, planning• Strategy for laser dump design/production/payment• plasma cell support responsibilities defined• Updated realistic planning for plasma cell: clean plasma cell delivered in July 2015. • layout of RF signal generation and distribution for AWAKE• electron line magnet design• RF signal requirements• Triumf magnets for electron line• compressor design • Electron spectrometer vacuum window • Shielding for AWAKE experimental area• BI planning

Page 6: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

6

Technical Board Meetings• 9th TB: 11 March 2015

– CSR preparation, BTVs and light transmission, TRIUMF status, Update on integration, electron source performance, laser dump, Safety files• Compressor design defined• RF signal requirements• TRIUMF: BPM design for 40mm completed, approved in February. 60mm design underway• Cockcroft contributions to emittance diagnostics• 80% of the descriptive part of the safety file is done• demonstrative part by October 2015• Streak camera position to define• e-spectrometer optical line, proton beam halo measurements.

Page 7: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

7

Technical Board Meetings• 5th TB: 24 September 2014 (Greifswald)

– Vacuum design status and issues, Plasma cell status, Proposal of TRIUMF contribution• Issues for vacuum: vacuum specifications, vacuum separation window• Start of discussions with plasma cell company (GRANT): e.g. clean plasma cell delivered in Feb 2015• TRIUMF joins AWAKE Collaboration

• 6th TB: 6 November 2014– New vacuum separation window, impact on RP, impact on spectrometer, Layout of common proton and electron beam-line, plasma cell integration, planning

• Vacuum requirement specification• decision on vacuum window: 0.2mm Al. No absorber downstream the window.• Definition of plasma cell: 12m (10+2m), move plasma cell by 2m. • integration of plasma cell and common proton and electron beam-line

• 7th TB: 12 December 2014– Vacuum simulation results, electron spectrometer magnet, proton beam line optics, updated layout of the AWAKE area, RF synchronization update, plasma cell

alignment. • HB4 magnet will be used as electron spectrometer• streak camera optical line to be defined• layout downstream the plasma cell• first ideas on the plasma cell support

• 8th TB: 12 February 2015– Status of e-beam magnets, update on e-spectrometer, update on RF synchronization, plasma cell measurements, RP maps, planning

• Strategy for laser dump design/production/payment• plasma cell support responsibilities defined• Updated realistic planning for plasma cell: clean plasma cell delivered in July 2015. • layout of RF signal generation and distribution for AWAKE• RF signal requirements• Triumf magnets for electron line• ompressor design • Electron spectrometer vacuum window • Shielding for AWAKE experimental area• BI planning!

• 9th TB: 11 March 2015– CSR preparation, BTVs and light transmission, TRIUMF status, Update on integration, electron source performance, laser dump, Safety files

• Compressor design defined• RF signal requirements• TRIUMF: BPM design for 40mm completed, approved in February. 60mm design underway• Cockcroft contributions to emittance diagnostics• 80% of the descriptive part of the safety file is done• demonstrative part by October 2015• Streak camera position to define• e-spectrometer optical line, proton beam halo measurements.

Page 8: Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.

8

AWAKE Technical Board

• Issues are well followed up• Collaboration between the different work packages has strongly improved

– Still room for more involvement• Many iterative meetings in between the TB• leads to conclusions in TB• Minutes are an extremely useful tool to track actions and decisions.

– Read them carefully!• Planning is updated and available