Siv Cullen Big data & augmented reality Exploring the possibilities
Jan 22, 2018
Siv Cullen
Big data & augmented realityExploring the possibilities
We openopportunities with connected thinking.
BackgroundBIMIndustry InformationLeveraging immersive
Background
BackgroundWhat is data doing in the construction industry?
Siloed by sector/region.Institutionalised industry which lags in technology adoption.Change is generally ‘on project’.Slow to leverage the benefits of data.
GFC bred rethinkData buzz is significant and client led.Massive projects enable technologies.BIM coming of age.
BackgroundHowever…
BIM
Building Information Modelling (BIM)“A digital representation of physical and functional characteristics of a facility. A building information model is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.”
Introduction to BIMbuildingSMART Definition
IKEA BIM
2D lines
simplex geometry
L=
3D cableØ, length, material
Data vessel
3D tube 3D cableØ, length, material, resistance, system
L=
3D cableØ, length, material, resistance, system, relationships, calculations, datasets ++++
L=
Intelligent parametric objects
Øe
Smart objects
Data Value
Element ID C Clipsal EFX Single Pole 1Module Wide 250Vac 40A
Element type Miniature Circuit Breaker
Part No. MCB4-120
Manufacturer Clipsal – Schneider Electric.
Net weight 120g
Service interval 5,000 hours
O&M Ref SAP Number
Programme code Maintenance Code
Install date 27-02-2017
Commission date 15-05-2017
Residual risks 4a/d, 6, 7, 9b
Element data
20/10/2017 13
nD
BIM a multitasking graphical database
Data for record, design & O&M
Intelligent Object Data i.e. IFC & COBie
2D Drawings, Plans, Sections etc.
3D Coordination & Visualisations
Animations, Haz. Ops. Studies etc.
Export data to analysis, simulation and asset management
Industry information
ISO19650BS/PAS1192
Shared WIP
Published Archived
Internal shared
External shared
BS/PAS1192 and ISO19650
WIP
Sh
Sh
P
Arc
Arc Arc
P01.01 P01 C01
SUITABILITY ↑
APPROVAL STATE →
Work in Progress
Content Check
Technical Check Shared Coordination
CheckDelivery Approval
Client Authorisation Published
File is being edited
Consider which
suitability is required
Consider which
suitability is required
Incorrect. Why has this been
shared when it is marked as
not for sharing?
Incorrect. Why has this been
shared when it is marked as
not for sharing?
Incorrect. Why has this been
shared when it is marked as
not for sharing?
Incorrect. Why has this been
shared when it is marked as
not for sharing?
Incorrect. Why has this been
shared when it is marked as
not for sharing?
SUITABILITYS0
NOT FOR SHARING
Planning to issue for
coordination
Check the content is
suitable for coordination
Check file is ok to
coordinate with other disciplines
Shared across the design team for
coordination of ongoing design
Ready for Package Lead
sign-off as OK for coordination
with other contracts
Ready for Design Manager sign-off
as OK for coordination
with other contracts
Approved by the Design
Manager for coordination
with other contracts
Unlikely to occur. The client
accepted the file, perhaps as a
record of what was shared for coordination
SUITABILITYS1FOR
COORDINATION
Planning to issue for
information only
Check the content correct and suitable for the purpose of
issue
Check the file is technically
suitable for the purpose of
issue
Shared across the design team for information –
see accompanying
communications
Ready for Package Lead
sign-off for issue for
information
Ready for Design
Manager sign-off for issue for
information
Approved by the Design
Manager for issue for
information
Unlikely to occur. The client
accepted the file, perhaps as a
record of what was shared for
information
SUITABILITYS2
FOR INFO
Planning to issue for comment
Check the content is
correct and suitable for comment
Check the file is technically
ready for comment
Shared across the design team
for client (or other) review and comment
Ready for Package Lead
sign-off for client (or other) review
and comment
Ready for Design
Manager sign-off for client (or
other) review and comment
Approved by the Design
Manager for issue for review and comment
Unlikely to occur. The client
accepted the file, perhaps because
they had no comment
SUITABILITYS3FOR
COMMENT
Planning to issue for
milestone approval
Check the content is
correct and suitable for
approval
Check the file is technically
ready for approval
Shared across the design team
for client approval for this
milestone
Ready for Package Lead
sign-off for issue to client for approval
Ready for Design
Manager sign-off for issue to
client for approval
Approved by the Design
Manager for issue to client for approval
Client approved
SUITABILITYS4
FOR STAGE APPROVAL
SharedWork in Progress Published Archived
Individual Coordinated Document Stored
Individual (i)
Production Cycle(s) Deliverables
Programme Relative (i)
AUCKLAND
?
SharedWork in Progress Published Archived
SYDNEY
SharedWork in Progress Published Archived
Leveraging immersive
Complex federated models Automated project deliverables
Automating Design
• Creating scripts which automate many tasks to reduce man hours.
• Integrating multiple platforms to a single output.
Clash Detection Design Resolution
Virtual Asset AM/FM Link
The Northern Line Extension, UK
Digital Delivery | BIM Management
Virtual realityStakeholder engagement
Design negotiations
Induction and training
The Northern Line Extension, UK
Digital Delivery | BIM Management
Augmented realityAdditional clarity
Reinforcement positioning
Services installation
Training and maintenance
Q & A