Top Banner
Sudan PBN Implementation Plan PBN SG/3 Cairo, Egypt, 1113 February  2018
26

Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

May 11, 2019

Download

Documents

doanhuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan PBN Implementation 

Plan

PBN SG/3Cairo, Egypt, 11‐13 February 2018

Page 2: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Outline Outline Brief of the State of SUDAN’s PBN Implementation Plan Status of Implementation Sudan ATS Surveillance SystemSudan ATM System.Lessons Learned Challenges Thoughts/RecommendationsConclusion 

Page 3: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

SUDAN PBN I l i  SUDAN PBN Implementation Plan SCAA established IFPD section in 2011 by a signing contract with ENAC/CGX Aero (French company). Four ATCOs trained in ENAC in:Non precision App.Precision App.  RNP APCH. 

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 3

Page 4: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

SUDAN PBN SUDAN PBN Implementation Plan IFPD section with the help of CGX designed procedures for 11 airports :RNAV SIDs and STARs for 4 airports.RNP APCH for 4 airports.Precision and Non precision procedures for 4 airports.   

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 4

Page 5: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

SUDAN PBN I l t ti  SUDAN PBN Implementation Plan  SUDAN apply RNAV1 for SIDs and STARs for the international airports.

Basic RNP1 for the other airports The upper routes network will be RNAV5. SUDAN will apply free routes airspace above flight level 390 in the second step for implementation of the new structure.

LOA assigned between SCAA and Military Authority  contains the application of FUA.

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 5

Page 6: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports
Page 7: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

SUDAN PBN SUDAN PBN Implementation Plan Khartoum (HSSS) airportILS approach R/W 36 CAT 1 ILS approach R/W 18 Cat 1RNAV approach (LNAV only) for R/W36 &18SIDs & STARs RNAV 1

Page 8: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

PBN SG/3 Cairo, Egypt, 11‐13 February 2018 8

Status of ImplementationRWY Ends

ILS / CAT

LNAV LNAV/VNAV

LPV RNP AR RNAV SID

RNAV STAR

18/36HSSS

1 YES NO NO NO YES YES

17/35HSPN

1 YES NO NO NO YES YES

19/01HSOB

‐ YES NO NO NO YES YES

04/22HSNN

‐ YES NO NO NO YES YES

Page 9: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Tools & Facilities To reduce errors in the procedure design process, as well as to standardize the application of the PANS‐OPS criteria SCAA supply the IFPD section with very efficient software‘s GeotitanD4FC4FOLS

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 9

Page 10: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan ATS Surveillance System  The Surveillance System in Sudan include the following:

6 MSSR antennas PORT SUDAN DONGOLA KHARTOUM EL OBEID AL FASHER AD‐DAMAZIN

Page 11: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan ATS Surveillance System SCAA has 16 ADS‐B stations:4 integrated with the system.4 waiting for integration.8 stations under installation.

Page 12: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

SitesSites

Page 13: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

ATM System     ATM System     Sudan signed new contract with Thales company for 10 years to upgrade the hardware and Software of the ATM system (TOPSKY)

Page 14: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

ATM System             ATM System             SCAA ATM system is supported by :

ADS‐C CPDLCAIDCOLDISafety net and monitoring functionRecording system

Page 15: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan Current SituationRNAV Current status in Sudan (routes)The following RNV routes are established within Khartoum Airspace:Route UM863 as RNAV route linking the Gulf states with West AfricaRoute UT124 as RNAV route linking East Africa with Europe

Page 16: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan Current SituationRNAV Current status in Sudan (routes)Routes UQ584 as RNAV route linking the Gulf with West Africa down South AmericaRoute UT535 linking Juba with East Africa. Route UT139 as RNAV 10 linking east Africa with West Africa. Route UT142 linking East Africa with the North West Africa.

Page 17: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan current ATS routesThis current situation encourage SCAA to restructure  the Sudan airspace to satisfy the National, Regional and Global objectives.

Page 18: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Sudan current ATS route

Page 19: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

New RNAV routes networkMain goals for the airlines:Save flight time and fuel consumption by reducing distance.Have several options for flight planning.Improve flight plan adherence by formalizing direct routes usually cleared by the controllers.Satisfy most of the requests of the airlines.

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 19

Page 20: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

New RNAV routes networkMain goals for sudanese ATCOs:Decongest hotspots as much as possible.Split bidirectional routes by creating unidirectional routes as much as possible.Formalize direct routes usually cleared by the controllers.Have a network that can answer almost all requests .

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 20

Page 21: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

First step of First step of Implementation  42 new RNAV routes added to the existing conventional network.12 are unidirectional routes.RNAV routes above FL285. 

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 21

Page 22: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 22

Page 23: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

ChallengesLake of Training in approval process.National  Aircraft modification for the PBN application.Sudanese pilot training in order to safely conduct an operation.Regulations governing the application of PBN.  

PBN SG/2 Sharm El Sheikh, 22‐25 February 2016 23

Page 24: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Conclusion The new RNAV Routes network, RNAV SIDs and STARs would have an impact for the national airlines, but it has positive effect for all airlines flying over Khartoum FIR or landing Sudan international airports, so that SCAA request from the national airlines to upgrade their fleets to meet the development in the PBN environment.

Page 25: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Conclusion   The restructure of SUDAN airspace would have a cross‐border impact, but it has positive effect for all airlines flying over Khartoum FIR, so that we appreciate any support from neighboring countries, ICAO MID/AFI offices and ITATA. 

Page 26: Sudan PBN Implementation Plan SG3/PPT14.pdf · SUDAN PBN Il ttiImplementation Plan SUDAN apply RNAV1 for SIDs and STARs for the international airports. Basic RNP1 for the other airports

Thanks for your attention