Success Case of ESCO Project
Dusit Thani Group-Guaranteed Saving Program-
Chiller Replacement and Heat Pump
©EEI All Rights Reserved2 Strictly confidential – For discussion purposes only
Speakers
• Mr. Teerapong So‐Lah
Chief Engineer
Dusit Princess Korat
Tel: 044‐ 256629
Email: [email protected]
• Mr. Ruamlarp Anantasanta
Deputy Managing Director
Excellent Energy International Co.,Ltd
Tel: 02‐ 2013466
Email: [email protected]
©EEI All Rights Reserved3 Strictly confidential – For discussion purposes only
• Project Brief
• Reimbursement Period
Agenda
©EEI All Rights Reserved4 Strictly confidential – For discussion purposes only
Dusit Thani Group
Investment & Financial
Arrangement
Project Management Consultant
(PMC)
ESCO Performance Guaranteed
Service
Project Background
Dusit Thani Group has recently run energy saving projects for their 7 hotels in the group. By synergizing all hotels in same Energy Conservation project, it enhanced their bargaining power in making good deals for equipment procurements Approximately 30% cost reduction.
Dusit Thani GroupDusit Thani – Bangkok
Dusit Thani – Hua Hin
Dusit Thani – Pattaya
Royal Princess GroupRoyal Princess – Chiang Mai
Dusit Princess – Korat
Royal Princess – Larn Luang
Dusit Princess – Srinakarin
©EEI All Rights Reserved5 Strictly confidential – For discussion purposes only
About EEI
Excellent Energy International Co., Ltd. (EEI) is:
A well-known ESCO (Energy Service Company) in Thailand established since 1999 with the registered capital of 25 MB
An ESCO who offers guaranteed-payback on EE/RE/AE* projects
One of a few ESCO in Thailand who can structures B.O.O.T. investment on EE/RE/AE projects for Client
The first one, and only ESCO in Thailand who successfully implemented Thailand ESCO Pilot Project with excellent base of support from the Thai Government & the World Bank.
*Energy Efficiency/ Renewable Energy/ Alternative Energy
Achieved reputation for being the most highly regarded ESCO in Thailand by government organization, financial institute, and industry expert in locale and global
An ESCO with almost 6,000 MB project portfolio distributed over Cogeneration system, Biogas system, Renewable Energy, Energy Management System (EMS), Heat Recovery and Commercial Building projects
©EEI All Rights Reserved6 Strictly confidential – For discussion purposes only
What’s Chiller Replacement andHeat Pump?
HEAT PUMPCHILLER REPLACEMENT
Heat Pump’s advantages
What is Heat Pump?
Chiller Replacement’s advantages
What is Chiller?
1. More even temperatures. 2. More comfortable humidity level in the winter; not too dry. 3. Less noise and odor. 4. No pilot light or vent to worry about. 5. No seasonable change over. 6. Only one fuel bill.7. May supply hot water with excess heat generated during the
summer. 8. Fewer home fires are caused with heat pumps in
comparison to gas heating.
1. New chillers will reduce maintenance cost and increase total system reliability
2. Better control and operations3. System efficiency during operation can be monitored and
reported through chiller monitoring system4. Better control of temperature5. Ability to expand air condition system for new area by using
air-cooled split type fan coil unit
Chillers of the air condition system are the major system of electricity consumption for commercial buildings; department stores, hotel, and office buildings. Therefore, the usage of high efficiency chiller can keep power cost down together with proper maintenance
Heat pump is a system for extracting heat from source (air stream or water) and applying this heat to media such as water. We gain more comfort and saving due to less electrical consumption and nothing burn such as boiler system.
©EEI All Rights Reserved7 Strictly confidential – For discussion purposes only
Dusit Princess Korat Hotel
Chiller Replacement230 RT
Project Investment Cost = 3.57 MBEnergy Cost Savings = 1.03 MB/YearPayback Period = 3.46 YearsIRR 10 Years = 28.89 %
Start Savings = March 2009End of Contract Period = November 2013
Solution Detail:
The improvement will replace existing chiller with new better efficiency chiller. The new chiller will be the main for normal operations while the old will be back up for emergency orwhen new chiller needs maintenance.
Investment & Financial
Arrangement
Project Management Consultant
(PMC)
ESCO Performance Guaranteed
Service
©EEI All Rights Reserved8 Strictly confidential – For discussion purposes only
Heat Pump25 Kw x 2 Sets
Project Investment Cost = 1 MBEnergy Cost Savings = 0.32 MB/YearPayback Period = 3.14 YearsIRR 10 Years = 31.84 %Start Savings = April 2009End of Contract Period = October 2013
Normally heat pump working life time is more than 10 years. We can take value added and long term pay back from investment of this measure. Properly design optimizes to existing heating and cooling system can take more benefit. Replacement diesel boiler with heat pump avoids accident from hazardous fuel storage and pollution reduction.
Investment & Financial
Arrangement
Project Management Consultant
(PMC)
ESCO Performance Guaranteed
Service
Dusit Princess Korat Hotel
©EEI All Rights Reserved9 Strictly confidential – For discussion purposes only
Chiller Replacement :Reimbursement Period
Cost Savings 1st Year = 1.09 MB/Year2nd Year = 1.13 MB/Year3rd Year = 1.18 MB/Year4th Year = 1.22 MB/Year5th Year = 1.27 MB/Year6th Year = 1.32 MB/Year7th Year = 1.38 MB/Year8th Year = 1.43 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year
Saving (Baht)
©EEI All Rights Reserved10 Strictly confidential – For discussion purposes only
Chiller Replacement: Reimbursement Period
Cost Savings 1st Year = 1.09 MB/Year2nd Year = 1.13 MB/Year3rd Year = 1.18 MB/Year4th Year = 1.22 MB/Year5th Year = 1.27 MB/Year6th Year = 1.32 MB/Year7th Year = 1.38 MB/Year8th Year = 1.43 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year
Tota
l Net
Sav
ings
ESCO
ClientShared savings amount
Energy Savings Amount 0.21 MJ/year
Cost Savings1st Year = 0.15 MB/Year2nd Year = 0.19 MB/Year3rd Year = 0.24 MB/Year4th Year = 0.29 MB/Year5th Year = 0.41 MB/Year6th Year = 1.33 MB/Year7th Year = 1.38 MB/Year8th Year = 1.44 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year
Project Achievement
Gua
rant
eed
savi
ngs
©EEI All Rights Reserved11 Strictly confidential – For discussion purposes only
Heat Pump: Reimbursement Period
Cost Savings 1st Year = 0.31 MB/Year2nd Year = 0.32 MB/Year3rd Year = 0.34 MB/Year4th Year = 0.35 MB/Year5th Year = 0.37 MB/Year6th Year = 0.38 MB/Year7th Year = 0.40 MB/Year8th Year = 0.41 MB/Year9th Year = 0.43 MB/Year10th Year = 0.44 MB/Year
Savings (Baht)
©EEI All Rights Reserved12 Strictly confidential – For discussion purposes only
Royal Princess Chiangmai
Chiller Replacement230 RT
Project Investment Cost = 4.07 MBEnergy Cost Savings = 2.58 MB/YearPayback Period = 1.58 YearsIRR 10 Years = 63.29 %Start Savings = March 2009
End of Contract Period = April 2014
Investment & Financial
Arrangement
Project Management Consultant
(PMC)
ESCO Performance Guaranteed
Service
©EEI All Rights Reserved13 Strictly confidential – For discussion purposes only
Royal Princess Chiangmai
Project Investment Cost = 1.18 MBEnergy Cost Savings = 0.63 MB/YearPayback Period = 1.88 YearsIRR 10 Years = 53.1%Start Savings = March 2009
End of Contract Period = November 2014
Investment & Financial
Arrangement
Project Management Consultant
(PMC)
ESCO Performance Guaranteed
Service
Heat Pump25 KWx3 sets
©EEI All Rights Reserved14 Strictly confidential – For discussion purposes only
Chiller Replacement: Reimbursement Period
Cost Savings 1st Year = 1.04 MB/Year2nd Year = 1.09 MB/Year3rd Year = 1.13 MB/Year4th Year = 1.18 MB/Year5th Year = 1.22 MB/Year6th Year = 1.27 MB/Year7th Year = 1.32 MB/Year8th Year = 1.38 MB/Year9th Year = 1.43 MB/Year10th Year = 1.49 MB/Year
Savings (Baht)
Year
©EEI All Rights Reserved15 Strictly confidential – For discussion purposes only
Heat Pump:Reimbursement Period
Cost Savings 1st Year = 0.46 MB/Year2nd Year = 0.48 MB/Year3rd Year = 0.50 MB/Year4th Year = 0.52 MB/Year5th Year = 0.54 MB/Year6th Year = 0.56 MB/Year7th Year = 0.59 MB/Year8th Year = 0.61 MB/Year9th Year = 0.64 MB/Year10th Year = 0.66 MB/Year
Savings (Baht)
©EEI All Rights Reserved16 Strictly confidential – For discussion purposes only