Top Banner
©EEI All Rights Reserved Strictly confidential – For discussion purposes only Success Case of ESCO Project Dusit Thani Group -Guaranteed Saving Program- Chiller Replacement and Heat Pump
16

Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

Sep 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights ReservedStrictly confidential – For discussion purposes only

Success Case of ESCO Project

Dusit Thani Group-Guaranteed Saving Program-

Chiller Replacement and Heat Pump

Page 2: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved2 Strictly confidential – For discussion purposes only

Speakers

• Mr. Teerapong So‐Lah

Chief Engineer 

Dusit Princess Korat

Tel:   044‐ 256629

Email:  [email protected]

• Mr. Ruamlarp Anantasanta

Deputy Managing Director

Excellent Energy International Co.,Ltd

Tel: 02‐ 2013466

Email: [email protected]

Page 3: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved3 Strictly confidential – For discussion purposes only

• Project Brief

• Reimbursement Period

Agenda

Page 4: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved4 Strictly confidential – For discussion purposes only

Dusit Thani Group

Investment & Financial

Arrangement

Project Management Consultant

(PMC)

ESCO Performance Guaranteed

Service

Project Background

Dusit Thani Group has recently run energy saving projects for their 7 hotels in the group. By synergizing all hotels in same Energy Conservation project, it enhanced their bargaining power in making good deals for equipment procurements Approximately 30% cost reduction.

Dusit Thani GroupDusit Thani – Bangkok

Dusit Thani – Hua Hin

Dusit Thani – Pattaya

Royal Princess GroupRoyal Princess – Chiang Mai

Dusit Princess – Korat

Royal Princess – Larn Luang

Dusit Princess – Srinakarin

Page 5: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved5 Strictly confidential – For discussion purposes only

About EEI

Excellent Energy International Co., Ltd. (EEI) is:

A well-known ESCO (Energy Service Company) in Thailand established since 1999 with the registered capital of 25 MB

An ESCO who offers guaranteed-payback on EE/RE/AE* projects

One of a few ESCO in Thailand who can structures B.O.O.T. investment on EE/RE/AE projects for Client

The first one, and only ESCO in Thailand who successfully implemented Thailand ESCO Pilot Project with excellent base of support from the Thai Government & the World Bank.

*Energy Efficiency/ Renewable Energy/ Alternative Energy

Achieved reputation for being the most highly regarded ESCO in Thailand by government organization, financial institute, and industry expert in locale and global

An ESCO with almost 6,000 MB project portfolio distributed over Cogeneration system, Biogas system, Renewable Energy, Energy Management System (EMS), Heat Recovery and Commercial Building projects

Page 6: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved6 Strictly confidential – For discussion purposes only

What’s Chiller Replacement andHeat Pump?

HEAT PUMPCHILLER REPLACEMENT

Heat Pump’s advantages

What is Heat Pump?

Chiller Replacement’s advantages

What is Chiller?

1. More even temperatures. 2. More comfortable humidity level in the winter; not too dry. 3. Less noise and odor. 4. No pilot light or vent to worry about. 5. No seasonable change over. 6. Only one fuel bill.7. May supply hot water with excess heat generated during the

summer. 8. Fewer home fires are caused with heat pumps in

comparison to gas heating.

1. New chillers will reduce maintenance cost and increase total system reliability

2. Better control and operations3. System efficiency during operation can be monitored and

reported through chiller monitoring system4. Better control of temperature5. Ability to expand air condition system for new area by using

air-cooled split type fan coil unit

Chillers of the air condition system are the major system of electricity consumption for commercial buildings; department stores, hotel, and office buildings. Therefore, the usage of high efficiency chiller can keep power cost down together with proper maintenance

Heat pump is a system for extracting heat from source (air stream or water) and applying this heat to media such as water. We gain more comfort and saving due to less electrical consumption and nothing burn such as boiler system.

Page 7: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved7 Strictly confidential – For discussion purposes only

Dusit Princess Korat Hotel

Chiller Replacement230 RT

Project Investment Cost = 3.57 MBEnergy Cost Savings = 1.03 MB/YearPayback Period = 3.46 YearsIRR 10 Years = 28.89 %

Start Savings = March 2009End of Contract Period = November 2013

Solution Detail:

The improvement will replace existing chiller with new better efficiency chiller. The new chiller will be the main for normal operations while the old will be back up for emergency orwhen new chiller needs maintenance.

Investment & Financial

Arrangement

Project Management Consultant

(PMC)

ESCO Performance Guaranteed

Service

Page 8: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved8 Strictly confidential – For discussion purposes only

Heat Pump25 Kw x 2 Sets

Project Investment Cost = 1 MBEnergy Cost Savings = 0.32 MB/YearPayback Period = 3.14 YearsIRR 10 Years = 31.84 %Start Savings = April 2009End of Contract Period = October 2013

Normally heat pump working life time is more than 10 years. We can take value added and long term pay back from investment of this measure. Properly design optimizes to existing heating and cooling system can take more benefit. Replacement diesel boiler with heat pump avoids accident from hazardous fuel storage and pollution reduction.

Investment & Financial

Arrangement

Project Management Consultant

(PMC)

ESCO Performance Guaranteed

Service

Dusit Princess Korat Hotel

Page 9: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved9 Strictly confidential – For discussion purposes only

Chiller Replacement :Reimbursement Period

Cost Savings 1st Year = 1.09 MB/Year2nd Year = 1.13 MB/Year3rd Year = 1.18 MB/Year4th Year = 1.22 MB/Year5th Year = 1.27 MB/Year6th Year = 1.32 MB/Year7th Year = 1.38 MB/Year8th Year = 1.43 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year

Saving (Baht)

Page 10: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved10 Strictly confidential – For discussion purposes only

Chiller Replacement: Reimbursement Period

Cost Savings 1st Year = 1.09 MB/Year2nd Year = 1.13 MB/Year3rd Year = 1.18 MB/Year4th Year = 1.22 MB/Year5th Year = 1.27 MB/Year6th Year = 1.32 MB/Year7th Year = 1.38 MB/Year8th Year = 1.43 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year

Tota

l Net

Sav

ings

ESCO

ClientShared savings amount

Energy Savings Amount 0.21 MJ/year

Cost Savings1st Year = 0.15 MB/Year2nd Year = 0.19 MB/Year3rd Year = 0.24 MB/Year4th Year = 0.29 MB/Year5th Year = 0.41 MB/Year6th Year = 1.33 MB/Year7th Year = 1.38 MB/Year8th Year = 1.44 MB/Year9th Year = 1.49 MB/Year10th Year = 1.55 MB/Year

Project Achievement

Gua

rant

eed

savi

ngs

Page 11: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved11 Strictly confidential – For discussion purposes only

Heat Pump: Reimbursement Period

Cost Savings 1st Year = 0.31 MB/Year2nd Year = 0.32 MB/Year3rd Year = 0.34 MB/Year4th Year = 0.35 MB/Year5th Year = 0.37 MB/Year6th Year = 0.38 MB/Year7th Year = 0.40 MB/Year8th Year = 0.41 MB/Year9th Year = 0.43 MB/Year10th Year = 0.44 MB/Year

Savings (Baht)

Page 12: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved12 Strictly confidential – For discussion purposes only

Royal Princess Chiangmai

Chiller Replacement230 RT

Project Investment Cost = 4.07 MBEnergy Cost Savings = 2.58 MB/YearPayback Period = 1.58 YearsIRR 10 Years = 63.29 %Start Savings = March 2009

End of Contract Period = April 2014

Investment & Financial

Arrangement

Project Management Consultant

(PMC)

ESCO Performance Guaranteed

Service

Page 13: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved13 Strictly confidential – For discussion purposes only

Royal Princess Chiangmai

Project Investment Cost = 1.18 MBEnergy Cost Savings = 0.63 MB/YearPayback Period = 1.88 YearsIRR 10 Years = 53.1%Start Savings = March 2009

End of Contract Period = November 2014

Investment & Financial

Arrangement

Project Management Consultant

(PMC)

ESCO Performance Guaranteed

Service

Heat Pump25 KWx3 sets

Page 14: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved14 Strictly confidential – For discussion purposes only

Chiller Replacement: Reimbursement Period

Cost Savings 1st Year = 1.04 MB/Year2nd Year = 1.09 MB/Year3rd Year = 1.13 MB/Year4th Year = 1.18 MB/Year5th Year = 1.22 MB/Year6th Year = 1.27 MB/Year7th Year = 1.32 MB/Year8th Year = 1.38 MB/Year9th Year = 1.43 MB/Year10th Year = 1.49 MB/Year

Savings (Baht)

Year

Page 15: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved15 Strictly confidential – For discussion purposes only

Heat Pump:Reimbursement Period

Cost Savings 1st Year = 0.46 MB/Year2nd Year = 0.48 MB/Year3rd Year = 0.50 MB/Year4th Year = 0.52 MB/Year5th Year = 0.54 MB/Year6th Year = 0.56 MB/Year7th Year = 0.59 MB/Year8th Year = 0.61 MB/Year9th Year = 0.64 MB/Year10th Year = 0.66 MB/Year

Savings (Baht)

Page 16: Success Case of ESCO Project Dusit Thani Group pump and chiller.pdf · ©EEI All Rights Reserved 3 Strictly confidential – For discussion purposes only • Project Brief • Reimbursement

©EEI All Rights Reserved16 Strictly confidential – For discussion purposes only

Thank You

http://www.eei.co.th/

Tel. +662-201-3466-7 / Fax. +662-201-3465