Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

Dec 13, 2015

Download

Documents

Ralph Matthews
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

Substitutions

Review Questions

Page 2: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

1. The correct method to notify that a substitution has been approved during the Bidding phase is by:

a. Modification

b. Addenda

c. Telephone

d. Letter

Page 3: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

b. Addenda

1. The correct method to notify that a substitution has been approved during the Bidding phase is by:

Page 4: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

2. Substitution Procedures are:

a. Defined by law

b. Specified in Division 1

c. Only allow requests during the bidding phase

d. Provide for requests by telephone

Page 5: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

2. Substitution Procedures are:

a. The General Services Administration

b. Specified in Division 1

c. The CSI

d. All of the above

Page 6: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

3. Substitutions may do all of the following EXCEPT:

a. Limit competition

b. Increase the specifier’s workload

c. Be conductive to permitting products of lower quality

d. Increase maintenance replacement costs

Page 7: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

3. Substitutions may do all of the following EXCEPT:

a. Limit competition

b. Increase the specifier’s workload

c. Be conductive to permitting products of lower quality

d. Increase maintenance replacement costs

Page 8: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

4. A method of opening proprietary specifications to alternate products is to:

a. Request alternate proposal in specifications

b. Permit contractor to submit requests for substitutions

c. Define the procedures for controlled substitutions in Division 1 of the Project Manual

d. All of the above

Page 9: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

4. A method of opening proprietary specifications to alternate products is to:

a. Request alternate proposal in specifications

b. Permit contractor to submit requests for substitutions

c. Define the procedures for controlled substitutions in Division 1 of the Project Manual

d. All of the above

Page 10: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

5. The construction phase is not the best time to entertain substitutions because:

a. It may be difficult to appraise quickly the full effect of the proposed substitution or fully evaluate and research the proposed product

b. Substituted items have not been subjected to the competitive bidding process and the cost may not reflect true market conditions.

c. When specified items are not available the A/E and Owner feel pressured to approve substitutions with which they have little experience and with which they are not comfortable.

d. All of the above

Page 11: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

5. The construction phase is not the best time to entertain substitutions because:

a. It may be difficult to appraise quickly the full effect of the proposed substitution or fully evaluate and research the proposed product

b. Substituted items have not been subjected to the competitive bidding process and the cost may not reflect true market conditions.

c. When specified items are not available the A/E and Owner feel pressured to approve substitutions with which they have little experience and with which they are not comfortable.

d. All of the above

Page 12: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

6. All of the following statements are true concerning the proprietary method of specifying termed open or closed EXCEPT:

a. The open proprietary specification allows for substitutions on an as approved basis

b. The closed proprietary specification does not allow for substitution

c. The terms open or closed do not refer to substitutions.

Page 13: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

6. All of the following statements are true concerning the proprietary method of specifying termed open or closed EXCEPT:

a. The open proprietary specification allows for substitutions on an as approved basis

b. The closed proprietary specification does not allow for substitution

c. The terms open or closed do not refer to substitutions.

Page 14: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

7. When an item is shown on Shop Drawings that is clearly a substitution that has not officially been requested, the designer should:

a. Return the shop drawing without review

b. Review the shop drawing and approve everything except the substituted item

Page 15: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

7. When an item is shown on Shop Drawings that is clearly a substitution that has not officially been requested, the designer should:

a. Return the shop drawing without review

b. Review the shop drawing and approve everything except the substituted item

Page 16: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

8. Which is a true statement concerning substitutions proposed during the construction phase:

a. They are unfair to the unsuccessful bidders.

b. They should be considered only to replace unavailable products or to remedy a situation where a specified product has proven unsuitable

Page 17: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

8. Which is a true statement concerning substitutions proposed during the construction phase:

a. They are unfair to the unsuccessful bidders.

b. They should be considered only to replace unavailable products or to remedy a situation where a specified product has proven unsuitable

Page 18: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

9. All of the following statements are true regarding the A/E’s substitution policy EXCEPT:

a. It should be described in every specification section

b. It should be described only in Division 1, section 01631

c. Specification section in Division 2 through 14 should direct the reader to the appropriate Division 1 section.

Page 19: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

9. All of the following statements are true regarding the A/E’s substitution policy EXCEPT:

a. It should be described in every specification section

b. It should be described only in Division 1, section 01631

c. Specification section in Division 2 through 14 should direct the reader to the appropriate Division 1 section.

Page 20: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

10. The A/E might want to restrict substitutions because of which of the following reasons:

a. Concerns that proposed substitution are inferior to the items specified because they are unknown.

b. Significant amounts of additional time and expense may be required to evaluate the proposed product.

c. The concern that proposed substitute product will not perform in all respects the same as the specified product ie.., appearance, performance, fire rating, code compliance, maintenance and lifespan.

d. All of the abovee. None of the above

Page 21: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

10. The A/E might want to restrict substitutions because of which of the following reasons:

a. Concerns that proposed substitution are inferior to the items specified because they are unknown.

b. Significant amounts of additional time and expense may be required to evaluate the proposed product.

c. The concern that proposed substitute product will not perform in all respects the same as the specified product ie.., appearance, performance, fire rating, code compliance, maintenance and lifespan.

d. All of the abovee. None of the above

Page 22: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

11. During the bid phase, substitutions may be proposed by:

a. Prime Bidders only

b. Subcontractors only

c. Suppliers

d. Contractors and Subcontractors only

Page 23: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

11. During the bid phase, substitutions may be proposed by:

a. Prime Bidders only

b. Subcontractors only

c. Suppliers

d. Contractors and Subcontractors only

Page 24: Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

Answers

1. b2. b3. a4. d5. d6. c7. a8. a9. a10. d

11. a