Top Banner
'Uo c \ & \0^ ABB Oil, Gas and Petrochemicals AM
12

SUBSIS - The Subsea Separation and Injection System

Mar 15, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SUBSIS - The Subsea Separation and Injection System

'Uoc

\&\0^

ABB Oil, Gas and Petrochemicals AM

Page 2: SUBSIS - The Subsea Separation and Injection System

DISCLAIMER

Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Page 3: SUBSIS - The Subsea Separation and Injection System

TROLL-PILOT FIELD LAYOUTFIELD LAY-OUT

ISU

4 Well Template

Flow Lines

4 Welt Template

& control umbilical

ABB Oil, Gas and Petrochemicals AMU\32203002\ADMIf*PnESENrA\Bla01300.RPT

Page 4: SUBSIS - The Subsea Separation and Injection System

ABB Oil, Gas and Petrochemicals A |»llIP IPBB 16/09/98

Page 5: SUBSIS - The Subsea Separation and Injection System

ABB Oil, Gas and PetrochemicalsBB16/09/98

A IMP

Page 6: SUBSIS - The Subsea Separation and Injection System

ABB Oil, Gas and Petrochemicals AiiiiBB 16/09/98

Page 7: SUBSIS - The Subsea Separation and Injection System
Page 8: SUBSIS - The Subsea Separation and Injection System

SUBSIS - TROLL-PILOT - water injection module

HIGH VOLTAGE SUBSEA MATEABLE CONNECTOR ~

POWERCABLE

EL- MOTOR&MM& ms r?SSilSIf®1’

OIL Ml WATER SAMPLING

PUMP

ABB Oil, Gas and Petrochemicals AilL\3220300»ADMII*PRESem'A\Bie01300.PFr

Page 9: SUBSIS - The Subsea Separation and Injection System

FROM MULTI-CABLE TO SINGLE CABLE

ABB Oil, Gas and PetrochemicalsL:\32203015\ADMIN\PRESENTA\BI800200.PPT ABB

Page 10: SUBSIS - The Subsea Separation and Injection System

, DISTRIBUTION AND CONTROL

ABB Oil, Gas and PetrochemicalsL:\32203015\ADMIN\PRESENTA\BI800200.PPT

ASS

Page 11: SUBSIS - The Subsea Separation and Injection System

Conclusions

a

injection

# ,,„cre„.o,lprod„c,,.„,r.cov.^o,^«

5j|SB<|5|!|

can reduce future development costs significantly, and indeed make these Mcfe> •conomlcalto develop

ABB Oil, Gas and Petrochemicals ABBL\32203002W)MIMvPRB8ENTA\BI802000,PFT 10

Page 12: SUBSIS - The Subsea Separation and Injection System

Conclusions

atechnology

Q The first SUBSIS project i.e. Troll Pilot, will he installed mid 1999 . ,

□ Subsea power distribution (SEPDIS) is m; water depth within 1999

□ SEPDIS ready for installation in 2000

□ The MSS production system is being qualified for 2000 m water depth, andIs at 1700 m in Brasil

ABB Oil, Gas and Petrochemicals AMlA3220d006MDMIPAPnE8ENTA\BI602000.PPT