Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists Subsea Cables 7 th November 2019 Capt. Chris Sturgeon
25

Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Mar 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Subsea Power Cables:

Lessons Learned A Marine Warranty Surveyor’s Perspective

Risk Control Specialists – Subsea Cables

7th November 2019 Capt. Chris Sturgeon

Page 2: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Thoughts

The historical insurers in marine markets are pulling capacity from

their traditional hull markets and see cables as a possible

opportunity. Less experienced insurers for cables might benefit

from the guidance of relevant expertise.

Insurers might consider direct appointment of MWS.

How hard does the market have to be for insurers to support the

MWS when push back from developers and contractors is

prevalent, and increases the risk?

Page 3: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Red Penguin & Penbridge Marine

Market influences

The power cable market - context

Losses

Contributory causes?

Project Environment

Phases

Pressures

Cable in context

Risk Awareness

Lessons Learned

Cause & effect

Recent Experiences

Summary

Presentation

Anchoring Prohibited

Page 4: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

M A R I N E & C A B L E E N G I N E E R I N G C O N S U L T A N T S

Red Penguin Reorganisation

Services

Project Assurance

Asset Management

Expert Services

Marine Warranty Survey (MWS)

Page 5: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

A new company

Formalising an informal working arrangement between

Red Penguin and Cambridge Marine

Risk Control Specialists – Subsea Cables

Chris Sturgeon Master Mariner

Colin Campbell Master Mariner

Danny Wilson Master Mariner

Richard Goldring Principal Engineer

The same people

A different brand

Page 6: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

What could possibly go wrong?

Page 7: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

CAR Claims 2002 - 19

Share of total Claims Cost

Cable claims 83.2% Collision 0.6% Electrical 4.5% Foundations 9.5% Fire 0.3%

Lightning 0.3 % Blades 0.3% Assembly 0.8% Deductible 0.8%

83% of claimed costs

Page 8: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

CAR Claims 2002 - 19

65% Vessel Costs

1%

16%

5%

5%

8%

BREAKDOWN OF COSTS

Vessel Charges = 65%Special Machinery (Third Party) = 1%Site Works (contractor labour) = 16.5%Materials = 5%

CAR Claims 2002 - 19

65% Vessel Costs

1%

16%

5%

5%

8%

BREAKDOWN OF COSTS

Vessel Charges = 65%Special Machinery (Third Party) = 1%Site Works (contractor labour) = 16.5%

Materials = 5%

Page 9: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

• Average claim cost: EUR 2,500,000 • Inter-array cable damage: EUR 1,500,000 – 10,000,000 • Export cable damage: EUR 8,500,000 – 30,000,000

• 57 of the last 60 construction projects have experienced cable claims• Vessel costs a major contributor (EUR 80,000 – 170,000 p/day)

CAR Claims - Cables

Page 10: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Offshore – Standby / WoWOffshore – Standby / WoW

Page 11: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Key Issues

• Deskilling of cable manufacture

• Deteriorating QA in cable factories

• Inadequate forward planning

• Year round marine operations

• Lack of installation skills

• Market forces affecting long term investment

• Poor performance of MWS

• Undiminished loss record

Page 12: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Market in context

0

20

40

60

80

100

120

140

0

2000

4000

6000

8000

10000

12000

14000

Cost $

cum

lative (

*100 f

or

tele

com

s)

km

Year

Cable lengths and Oil prices

HVDC cables Offshore wind export cables In Service (2019) Fibre Optic cables Inflation adjusted oil price

Page 13: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon
Page 14: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Pre Contract Award

Development

Procurement

Post Contract Award

Cable Design & Type Test

Manufacture

Engineering Design

Risk Inception

Load

Installation

Commissioning

Operation

Project Schedule

MWS SoW Key risk points in a project

MWS Appointed

Projects

Page 15: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

• Joint Rig Committee (JRC) Code of Conduct for MWS JRC2010/010

• Fundamental objective of the MWS is to reduce risk ……to an acceptable level in accordance with best industry practice

• Acting as an independent third party reviewer

• Possessing relevant skills and experience

• Noting insurers’ interests

• Reviewing the project arrangements, suitability and monitoring compliance

• Provide written approval (CoA) & makerecommendations (Assured to comply with)

Insurers’ Expectation

• Low cost

• Augment / replace internal risk control

• An unwanted necessity (but it ticks a box)

• Typically engaged on a Consultancy contract

• Expect to have some control over MWS’s work

and impact

• Engage as late as possible to defer the cost

Some Assureds’ Expectations

Role of MWS

Page 16: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Manufacturing Issues

Cable manufacturers make cable:

Control of loading, transportation and installing cable

ensures the continued viability and efficiency of the

production line…

If the manufacturer does not load, ship or install cable:

Are the project contract responsibilities clear?

How is transfer of risk managed?

Type approval test (TAT), QC/QA, experience, consistency

24 hour monitoring?

Mind

Minimum

Bend Radius

(MBR)

Page 17: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Damage during loading

Joint in load port ?

• Factory jointers

• Low risk operations

• Delay

Leave in stow and joint at sea ?

• Field jointers

• Higher risk operations

• Contract issues?

• Delay

• Weather risk

Page 18: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Transportation

Page 19: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Installation – Focus Points

• Planning, planning & planning

• Risk control

• Experience & competence

• Tests and trials

• Contingency planning

• Operations

• Implement plans and procedures

• Manage change

• Identify root cause of incidents

Page 20: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Technical impact of losses

Failed Shore End Landing - HVDC Interconnector:

• Investigation of cause

• Cost of rectification engineering & planning - 8 months

• Delay > 6 months - ship time, support vessels

• Weather impact

• Consents and permits impact

• Negotiation, dispute resolution

• Schedule delay

• Complete installation works

• Additional rock protection and trenching

Page 21: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Claim: Circa EUR 10,000,000

Damage: 132kV Export Cable and submarine joint

Cause:

Lifting frame was incorrectly hooked up to manoeuvring points and not lifting points

Manoeuvring points failed dropping the cable and frame

Lessons Learned:

Operators were not familiar with the frame and its safe operation

The lifting points were not clearly colour coded, which is good practice

Page 22: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Claim: Circa EUR 10,000,000

Cause:

Small weather front which was un-forecast came through the area giving unexpected direction and wind speed. The barge was in survival position, but was not able to survive the almost-beam-on winds and swells from this unexpected system

Damage:

Significant damage to Export cable & Plough

Lesson Learned:

MWS provided strong recommendations to consider seeking shelter, Barge Master decided to continue

Page 23: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Lessons Learned

• Appoint a MWS with relevant & extensive experience; it’s a false economy to go cheap

• Get MWS involved earlier in the project schedule; at least from engineering design review

• Let the MWS do their job; it can help everyone!

• Don’t sweat the small stuff; there’s lots of it…

• Confirm project teams’ understanding of distinction between contract requirements and policy conditions

• Communication: It’s good to talk – be frank

• Plan for the worst: It costs less at the desk.

Page 24: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

The historical insurers in marine markets are pulling capacity from

their traditional hull markets and see cables as a possible

opportunity. Less experienced insurers for cables might benefit

from the guidance of relevant expertise.

Insurers might consider direct appointment of MWS.

How hard does the market have to be for insurers to support the

MWS when push back from developers and contractors is

prevalent, and increases the risk?

Thoughts

Page 25: Subsea Power Cables...Subsea Power Cables: Lessons Learned A Marine Warranty Surveyor’s Perspective Risk Control Specialists –Subsea Cables 7th November 2019 Capt. Chris Sturgeon

Thank you