Dear All, In order to streamline the Structural Inspection Process and add to the efficiency, we are pleased to provide you with the following documents pertaining to the process: - Workflow Chart demonstrating the various stages of the process. - The necessary forms to be filled when requesting Inspections. - A comprehensive checklist for various types of Inspections We are confident that your improved familiarity with our procedures and their various elements will help you communicate better with CED and be better prepared for its Structural Inspection. The documents referred above will be effective immediately and until superseded by a further communication. Your’s faithfully, RASHID AL FALASI SENIOR MANAGER - PERMITS TRAKHEES - PCFC Cc: M-file To: All Business Units, Consultants & Contractors Subject: CED – Structural Inspection Procedures Our Ref : CIRCULAR-38147/2008/sk Date: 19-Aug-2008
27
Embed
Subject: CED – Structural Inspection Procedures - …trakhees.ae/en/ced/Circulars/Inspection Compliance/CircularLNO38147... · - A comprehensive checklist for various types of Inspections
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Dear All,
In order to streamline the Structural Inspection Process and add to the efficiency, we are pleased to provide you with the following documents pertaining to the process:
- Workflow Chart demonstrating the various stages of the process. - The necessary forms to be filled when requesting Inspections. - A comprehensive checklist for various types of Inspections
We are confident that your improved familiarity with our procedures and their various elements will help you communicate better with CED and be better prepared for its Structural Inspection.
The documents referred above will be effective immediately and until superseded by a further communication.
Your’s faithfully,
RASHID AL FALASI SENIOR MANAGER - PERMITS TRAKHEES - PCFC
Cc: M-file
To: All Business Units, Consultants & Contractors
Subject: CED – Structural Inspection Procedures
Our Ref
:
CIRCULAR-38147/2008/sk
Date: 19-Aug-2008
Date: ……………….…….24th September, 2009
Others
4. Status of Inspection:
Contractor: …………………………………………….…………………………….
Project / Lessee Name: ……………………………………………………….…….
Name of Site Engr.:…………………………………………………………………..
Note: Hoist/Passenger Lift for Structures > G+4 Floors is required
Not Approved
CED Inspection Engineer
Date of Inspection:……………………………………………………………………………………………………………………
"Request for Inspection" for "Normal" category (Without Inspection Fee) shall be Submitted 24 Hours Prior to the Inspection required or to be sent latest by 07.30 Hrs either through eMail to [email protected] or by fax @ +971 4 4327888 for Inspection of 'Structural Element" on the
same working day and for "Paid Inspections" submission shall be before 12:00 Noon on working day
3. Availability of supporting documents for inspection:
2. Details of Structural Element ready for inspection on Date: ……………………..(Specify the Date only)
We confirm above structural element is checked by us in compliance with approved drawings, Trakhees - CED Regulations, Codesand Engineering Standards. We take responsibility for quality of concrete and related works
Contractor Signature Duly Stamped
………………………………………..….…
………………………………………..…….……………………………………………
REQUEST FOR INSPECTIONCIVIL ENGINEERING DIVISION
Refer Check List Reference No: Circular-38147/2008/sk dated 19-August-2008 and the availability of supporting documents shall bein compliance with specified structural element as requested for inspection
1. In case of a change of the Consultant, this document should be transferred to the new Consultant after the consent of CED. 2. This schedule to be available at site for each visit of inspection by CED Engineer. 3. This schedule has to be submitted along with the request for Building Completion Certificate