Top Banner
2004 © SWITCH Study Trip of the SWITCH Committee UK, October 4 – 7, 2004
13

Study Trip of the SWITCH Committee

Jan 01, 2016

Download

Documents

rhona-berg

Study Trip of the SWITCH Committee. UK, October 4 – 7, 2004. The Foundation. Mission and History Organisation Institutional Aspects, Financing Users Strategic Business Areas Strategic Projects. Mission. Deed of Foundation, 22-10-1987 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Study Trip of the SWITCH Committee

2004 © SWITCH

Study Trip of the SWITCH Committee

UK, October 4 – 7, 2004

Page 2: Study Trip of the SWITCH Committee

2004 © SWITCH 2

The Foundation

Mission and History

Organisation

Institutional Aspects, Financing

Users

Strategic Business Areas

Strategic Projects

Page 3: Study Trip of the SWITCH Committee

2004 © SWITCH 3

Mission

Deed of Foundation, 22-10-1987Mission of the Foundation is to create, promote and offer the necessary basis for the effective use of modern methods of telecomputing in teaching and research in Switzerland, to be involved in and to support such methods

History1986-1989 Establishment1990-1995 Development phase1996-1999 Consolidation phase2000-2004 New strategic orientation

Page 4: Study Trip of the SWITCH Committee

2004 © SWITCH 4

Organisation

FoundationCouncilBoard

Direction

SecurityInternet

IdentifiersManagement

ServicesNetServicesNetwork

BusinessDevelopment

SecretaryGeneral

W. Huber M. Sutter C. Graf C. Tönz C. Tönz

U. Eppenberger

F. Scaroni

Foundation Council: 32 membersBoard:

A. Dudler PresidentG. Chapuis Vice PresidentT. BraunP. KofmelR. Werlen

DirectionT. Brunner Managing DirectorC. Tönz Deputy

Headcount 6-2004: 58

Page 5: Study Trip of the SWITCH Committee

2004 © SWITCH 5

Institutional aspects, Financing

The Members of the Foundation Council representConfederation/Government (6)Cantons (9)Cantonal Universtities (10)SFIT-Domain (4)Universities of Applied Sciences (3)

The Foundation is financed byUniversitiesSWITCH equities (DN-Revenue)Confederation/Government (on project basis)EU (on project basis)Services

Global budget 2003: CHF 30 Mio (approx. £ 13 Mio)

Page 6: Study Trip of the SWITCH Committee

2004 © SWITCH 6

Users

Page 7: Study Trip of the SWITCH Committee

2004 © SWITCH 7

Strategic Business Areas

Network

Networkengineering

NetworkInfrastructure

Consulting

• SWITCHlambda

• IP Routing

• IPv6, QoS, Multicast

• PERT

Internet Identifiers

Domain Namen(Registration)

Domain Namen(further TLDs)

• Invoicing

• Administration

• Help Desk

• Online-Queries

• Consulting

• Added Services for End Users

• Added Services for second level service provider

UserRegistration

NetServices

virtual communities

e-mobility

• SWITCHaai• SWITCHmobile

• SWITCHvconf• Collaboration Tools• content delivery tools• Grid Middleware

Consulting

Security

Incident Handling

Consulting

Laboratory

Protection ofInfrastructure

Page 8: Study Trip of the SWITCH Committee

2004 © SWITCH 8

Network

1400 km fibersDWDM, 10GE, 1GE

Page 9: Study Trip of the SWITCH Committee

2004 © SWITCH 9

NetServices - Middleware & End User

SWITCHmobile enabled sites SWITCHvconf active users

SWITCHaai - Home Orgs and Resources

Page 10: Study Trip of the SWITCH Committee

2004 © SWITCH 10

C(I)IP:Collaboration with

the Government

SWITCH Security

Technical Expertise:Anomaly detection, Data analysis, Simulations, new Services etc.

Reaction:Contact and coordination point, Network Security

Projects/Service:e.g. PKI, common Policies

„CERT“

supports

Security Lab

Proactiv:Information of

the community (inter)national “Networking”

CriticalInftrastructure

Protection

supports

“Incident handling”

Services/Consulting

Page 11: Study Trip of the SWITCH Committee

2004 © SWITCH 11

Internet Identifiers

Development of Domain-Name registration .ch and .li 1996-2004

Total

Active

Inactive

Page 12: Study Trip of the SWITCH Committee

2004 © SWITCH 12

Srategic projects

Authorisation Authentication Infrastructure

e-Collaboration: videoconf, mobile

Public Key Infrastructure

End-to-End quality of service

Accounting (AAA)

Security of critical infrastructure

GRID services

New Identifiers services

Page 13: Study Trip of the SWITCH Committee

2004 © SWITCH 13