JSC-20955 STS S1-J Natioo;C11 Space Transportation System Missi.on Report December 1985 ·NI\S/\ National Aeronautics and Spa ce Administ ration Lyndon B. Johnson Space Center Houston, Texas
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 1/8
JSC-20955
STS S1 -J
N a t i o o ; C 1 1 SpaceTransportation SystemMissi.on Repor t
December 1985
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 2/8
TABLE OF CONTENTS
Title
INTRODUCTION AND MISSION OBJECTIVES
MISSION SUMMARY
VEHICLE ASSESSMENT •
SOLID ROCKET BOOSTER •
EXTERNAL TANK
SPACE SHUTTLE MAIN ENGINE
MAIN PROPULSION SYSTEM •
ORBITER
Intermittent Power to SSME 3 LH2 Prevalve
Page
1
1
1
1
3
3
3
3
3
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 3/8
I NT R O D UC T I O N AN D M I S S IO N O B JE C T I VE S
The ST S 51-J N a t io n a l Space T r a nspor ta t i o n Syste m M issio n Repo r t co nt a i ns a
summ a ry of the O rbit e r, E T (exter n a l ta nk), SR B (sol id rocket bo ost er), andS S ME {Space Shutt l e ma i n e ng i n e)/MP S (m ai n propulsio n syste m) syste ms oper a ti o n
fo r the t w en ty-first Space Shutt le missio n. This was the first fli ght of the
Orbi te r v ehicle A tl a n tis (OV-104). Because of the securi ty classificat io n
assign ed t o this mission, this repo r t co nt a i ns no discussio n of any of the
classified m issio n act i v it i es o r accompl ishme nts.
Table I co nt a i ns the sequence of ev e n ts of majo r m issio n acti v i t ies that a r e
unclassified •. This repo r t also con t ai ns a discussio n of the most sig n ifican t
unclassified Orbi t er pr oble m. T abl e II co n ta i ns a l isti n g of a l l unclassifiedO r bi t er p ro bl e ms /a n om a li e s.
MI S S IO N S U M M AR Y
The ST S 51-J m issio n w as l aunched on Oct ober 3, 1985, at 273:15:15:30 G.m.t.,
fro m K S C w i th fiv e cr e w m e mbe rs. TI le cr ew m embe rs for this mission w er e
Ka r o l J. B obko, Co l., U. S. Ai r F o rce, Co m m ande r; R o n a ld J. Grabe, Lt. Co l.,
U. S. Ai r F o rce, Pi lo t; Da v id C. Hil m e rs, Maj., U. S. Ma r in e C o rp., and
Rober t C. S t e wa r t, Co l., U. S. Ar my, Mission Specia l ists; and Wil l ia m A. P a i1es,Maj., U. S. Ai r F o rce, Paylo ad Special ist.
The countdo wn phase w as compl e ted sat isfacto r ily. Al l syste m oper a t i ons w e r e
n o mi n a l duri n g the ascen t phase. SRB mo t o r pe rfo r m a nce was n e a r the predicted
l e v e ls a nd w el l w i thi n the a ll o w abl e e n v el opes. Exter n a l t a nk a nd M P S perfo r m-
a nce w as excel l e nt wi th M E C O (m a in en g i ne cutoff) nea r the predicted t im e.
The e n t ry phase syste m ope r a ti o ns w er e sa t isfacto ry w i th the O rbi t e r l a ndi n g o n
run w ay 2 3 at Edwa rds Ai r F orce B ase a t 280:17:00:08 G.m.t. on Oct obe r 7, 1985.The r o ll out dista nce w as 8056 ft. An i nspecti o n of the O rbit e r aft e r l andi~g
show ed T P S (ther m a l pro t ecti o n syste m) dam ag e t o the l eft i nbo a rd el e v o n a nd
the nose cap.
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 4/8
I. - STS 51-J SEQUENCE OF EVENTS
Parameter- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -G .m .t ., h r: mi n :s ec
APU Activation (1)
(2)
(3)
SRB HPU activation command (LH-A2)
MPS start command sequence (engine 3)
SRB ignition command from GPC (lift-off)
MPS throttle-down to 68-percent (engine 3)MPS throttle-down to 65-percent (engine 3)
Ma xi mum dyn am ic pre ssur e
MPS throttle-up to 104-percent (engine 3)
SRB separation command from GPC
MPS throttle-down from 3g acceleration (engine 3)
Main engine cutoff (MECa)
E xt er na l t an k se pa ra ti on
APU deactivation (1)
(2)(3)
Flight control system checkout APU 3 start
APU 3 shutdown
APU 1 activation
APU activation (2)(3)
E nt ry I nt er fa ce
E nd b la ck ou t
Terminal area energy management (TAEM)Main landing gear contact
Nose landing gear contact
Wheels stop
276:15:10:39
276:15:10:41
276:15:10:43
276:15:14:59.4
276:15:15:23.4
276:15:15:30
276:15:15:55.4276:15:16:00.9
276:15:16:19
276:15:16:24.57
276:15:17:34
276:15:23:05
276:15:24:02
276:15:24:20
276:15:30:21
276:15:30:22276:15:30:23
279:17:32:01
279:17:37:38
280:15:45:31
280: 16:17:30
I 280:16:17:37
I 280:16:30:21
I 280:16:48:12
I 280:16:53:53I 280:17:00:08
1280:17:00:15
I 280: 17:0 1:13
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 5/8
E XTE RN AL TA NK
All ET systems performed as expected. There was only one minor ET instrumen-
tation anomaly. There was no ice/frost buildup observed, and the vehicle wascl ea n a t l ift -o ff.
SPACE SHUTTLE MAIN ENGINE
The SSME performance data during prelaunch, mainstage, shutdown and propellant
dump were within specifications. Engine 1 HPTP (high pressure fuel turbopump)
line pressure oscillations were observed during mainstage. This pump will be
replaced before the next flight.
MAIN PROPULSION SYSTEM
The overall performance of the MPS was excellent. All pretanking purges were
performed satisfactorily. The L02 (liquid oxygen) and LH2 (liquid hydrogen)
pr opel la nt l oadi ng , pr epr essur iza tio n a nd pre ssur izat ion syst em s per fo rm ed a s
planned. Propellant loading was accomplished with no flow stopages.
Ascent performance of the MPS was normal and was within specification require-
ments throughout the flight. At approximately T + 235 seconds, the OrbiterME (main engine)-2 LH2 inlet temperature measurement failed; however, this had
no effect on the flight. Trajectory reconstruction indicated that the vehicle
specific impulse was near the MPS assessment tag values. One DTO (detailed test
objective), 40 percent MPS Vacuum Dump Test, was successfully performed.
ORBITER
All Orbiter systems operated very satisfactorily with only eleven anomalies
occuring during the flight. A discussion of the most significant problemis contained in the following paragraph, and a complete listing of all problems
and anomalies is contained in Table II.
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 6/8
UNC1. fFIED
I xo, I
J SC S TS 51-J P RO HL DI T RA CK IN G L IS T F OR 0\ -1 \;',A TL ,\ NT IS ~;L IG HT 1 OCT. 25, 1IJa5
TITLE. - - - - - - - - - - ~ - ~ - - - . - - - - - - - - - ~ - ~ . - - - ~ ~ . - - . - - - - - - - - - - - - - - - - - - - - - - ~ - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - ~
R ES P. t fC R.I T1~iE, C;. 11.T. I CfltelENTS
1 SSt-!E3 L H2 P RE VA LV E:
A CLOSE REHOTE POWER CONTROLLER "A"
F AU LT Y " ON " I ND IC AT IO N ( V7 6X 41 26E ).
B OPEN pmJER CIRCUIT DID NOT OPERATE
P R OP E RL Y ( V4 IX I 30 3E ).
2 PORT MPH SHOULDER "A" PYRO
I NIT IA TO R C IR CU IT F AIL ED S ELF T ES T.
3 INSTRUMENTATION:
A I F UE L C EL L 1 H YD RO GE N F LO W
( V45R O I70A ) L O W.
B SSME 2 LH2 INLET TEMPERATURE
F A IL E D ( V41T I 201C ).
C APU 1 GAS GENERATOR VALVE MODULE
T EM PE RA TU RE F AI LE D ( V4 6T OI 71 A) .
PRELAUNCH
PRELAUNCH
PRELAUNCH
276:02:02
PRELAUNCH
T+4 ~lIN
P OS T H ECO
D FES FREON COOLANT LOOP 1 TEHPERATURE ASCENT
(VG3TI207) RESPONSE UNUSUAL AND FCL AND
2 TEi1PERATURE (V63TI407) LAGGED FCL O};'ORBIT1.
PRIOR TO LOADING, CLOSE FPC "A" liAS HLINKING
\ ffi ENP RE VAL VE l IA S OP EN . S US PE CT A VI ON ICS B AY 6
C UN MO N H IR IN G P RO BL EM . TiS AT KSC.
DURING SPECIAL ELECTRICAL TESTS, WI~N OPEN
COMMANDS "A" AND "B" ONLY \~ERE "Ol~" (V41K131IJX
AND 1320X). CHIT J-1810.
I
I
I
IS. ~!uR RAY
I D . P P.E VE TT
I
I
I S . I :U RR AY
I D . P RE VE TT
I
FAILED RESISTANCE TEST. H WAS GOOD. IF PIC "A" J. PECK
FIRES, GUILLOTINE WOULD CUT RMS WIRE BUNDLE.
POSTFLIGHT A CRUSHED WIRE WAS FOUND 2 INCHES FROM
T HE P YR O C ON NE CT OR .
DURING FUEL CELL PURGE, FLOW wAS 0.215 LBS/HR F. PLAUCHE
FOR 10 MINUTES. AT 276:04:18 Fe 1 I.,'ASACTIVATED
AND FLo\.JHAS NORMAL DURING tlISSlON. FLY AS IS.
INDICATED OFF SCALE HIGH. Rc'ioRAT KSC.
I l'4D IC AT EDO FF S CAL E L OW A ND T HE N WAS
INTERMITTENT. PREFLICHT WAIVER. SUSPECT L{)USE
WIRING. USED T2 (V46TOI72A) TO VERIFYTEHPERATURE. TiS AND REPAIR AT KSC.
D . P RE VE TT
D R 2 8F 007
W. SCOTT
AT T+2 }lIN 45 SEC FCL 1 TENP DROPPED TO 32 DEC F H. ROTTER
S ETT IN G o rr C c'i oWAND THEN RECOVERED. LAG
RESPONSE SIHILAR ON OV"099. 1NSULATlON or , R&FFCL 2 SENSOR.
U~CLASSIFIED
} .
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 7/8
UNCLASSIFIED
OCT. 25, 19R5
TITLE
JSC STS 51...J PROBLEH TRACKING LIST FOR OV-I04 ATLANTIS FLIGHT 1
COMMENTSI NO. I R ES P. ~l GR .I T IM E, C .H .T . I
4
5
6
7
8
9
E FUEL CELL 3 OXYGEN FLOW METER
( V45R 0 360) F A IL E D .
F APU 1 EXHAUST GAS TEHPERATURE 2
( V46T 0140A ) F A IL E D .
HSS 2 REGU LATOR PR ESSURE (VS8P 0204)
DECAYED.
O PERATIO NS RE CORDER 2 TRA CKS 7, 8AND 9 INTERHITTENT.
RIGHT OHS FUEL TOTAL QUANTITY
R EA DI NG O FF SE T (V 4J QS 33 IC ).
THER MAL PROT ECTION SYS TEM DAH AGE O N
LEFT INBOARD ELEVON LEADING EDGE AND
IN NOSE CAP AREA.
SSME 1 A~D 2 PITCH AND YAW ACTUATOR
S EC ON DA RY D EL TA P RE SS UR ES H IG H.
FLT DAY 4
ENTRY
FLT DAY 1
FLT DAY SJ AND 4
DEORBIT
LAUNCH
AND
Et-.'TRY
FLT DAY 4
PAYLOAD BAY CMIERA "B" HAS DIFFICULT I ON ORBIT
TO FOCUS AND CANERA "c" AZIHUTH AND
A ND E LE VA TI ON fA IL FD .
READ OFF SCALE LOW. FUEL CELL OPERATION NORt-tAL.
T/ S AT KSC VERIFIED FAILURE. IPR. REPAIR \:HEN
FC IS PULLED. FLY AS IS.
READ OFF SCALE tou. R&R AT KSC.
SUSPECT RELIEF VALVE DID NOT FULLY SEAT AFTER
ASCENT. SEE PROBLEM STS~8.17. T/S POSTFLIGHT
fO UN D O UT ?O F.S PE C L EA K.
OTHER TRACKS FUNCTIONED PROPERLY. SEE PROBLEHSTS"'SIF-IJ. DmlPED RECORDER AT DRYDEN AND KSC.
R&R AT KSC.
READ GOOD UNTIL NEAR END OF DEORBIT BURN, THEN IT
HAD ABOUT A 10 PERCENT HIGH OFFSET. RIGHT POD IS
FROH OV1"099. FOUND GLASS BROKEN IN PROBE BUT NO
LEAK. DEFER REPAIR UNTIL POD IS PULLED. FLY AS
IS.
GAP FILLER LOSS, SEVERE TILE EROSION AND AFT
CARRIE R PL ATE DAN AGE WIT H PR OBABLE ST RUCTUR AL
DAMAGE TO ELEVON. SEVERE TILE SLUMP WITHPOSSIBLE SUBSURFACE FLOW TO NOSE CAP STRUCTURE.
I NS TA LL ED D OU BL ER S O N E LE VO N S UB ~S TR UC TU RE .
AFTER SSME HYDRAULIC REPRESS, READ 300 TO 500
PSI. CONDITION EXISTED UNTIL APU 1 \ IA S S HU T D OWN
AFTER LANDING. SUSPECT ISO VALVE LEAK. T/S AT
KSC.
CAMERA "c" ONLY MOVED CLOCKWISE, THEN PITCH
SLOWED DOWN AND FINALLY THE AZ/EL STUCK. T/S AT
KSC DID ~OT REPEAT EITHER PROBLE~!. R&R AT KSC.
I JT '- V'I A " S T F T F I'
F . P LA UC HE
D R 2 8F 006
W. SCOTT
C AR 2 8F 002
J. WILTZ
D R 28F009
J. MELUGINHE N OOSS F
J. HOOP ER
J. SMITH
C AR 2 3F 009
J. WILTZ
C AR 2 8F 008
B . E HB RE Y
J SC E E615F
J SC E E616F
8/7/2019 STS-51J National Space Transportation System Mission Report
http://slidepdf.com/reader/full/sts-51j-national-space-transportation-system-mission-report 8/8
UNCLI 1 .: flED
JSC STS 51·J PROBLEM TRACKING LIST FUR OV·ll ~ ATLANTIS FLIGHT 1 OCT. 25. 1985
I NO. I TITLE I TINE. G.~I•T. I COHMENTS RESP. HGR.
10 IIATCHES:
A A IR LO CK H AT Cl I ",\ " TA PE RE D P IN D ID
~()T LATCI] It~ HATCIl OpeN l' :T]vL
O:i ORB TT CREW REPORTED LATCH ONLY FIT AROUND TO HULD PIN
1: \ SLOT \ .J I1EN DOOR WAS I N H AL F O PE t\ P O SI TI O~.
KSC FUUND PIN MISALIGNED 3/8 INCH.
N. JEVAS
UR 2 8F004
R SI DE HA TC Ii "T " H AN DL E D IF F lC UL T F OR
G ROU ~D CR E~ TO O PE RAT E.
PRELAUNCH
AND
POSTLANDING
F LIG HT CR E\.JR EP OR TED T HA T GR OU ND C RE W HA D
DIFFICULTY LOCKING AND UNLOCKING THE HATCH.
POSTFLIGHT KSC FOUND ONE OF 4 "T" HANDLE TOOLS
DID NOT \VORK.
N. JEVAS
D R 2 8F005
11 LEFT DISPLAY DRIVER UNIT DATA GOOD
B IT TO GGL ED D URI NG E ~T RY.ENTRY FLAC TOGGLED ABOUT 25 TIMES. SEE R DDU PROBLEM
STS~51F·21 ON OV~099. T/S AT KSC. CHIT J-1831.
T. LEWIS
P R EP A RE D B Y :/ s/ RJ W
ROBERT J. WARD
10/25/85
DATE
A P PR O VE D B Y :/ s/ JE M
JOSEPH E. NECHELAY
10/25/85
DATE
UNCLASSIFIED
f"