BUILDING IS NOT LOCATED IN FLOOD HAZARD AREA; THEREFORE FLOODDESIGN DATA IS NOT REQUIRED
8. SPECIAL LOADS (1603.1.7)
SPECIAL LOADING CONDITIONS ARE NOT APPLICABLE TO THE DESIGN OFTHIS BUILDING; THEREFORE SPECIAL LOADS ARE NOT REQUIRED
9. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE (1603.1.8)
BUILDING IS DESIGNATED SEISMIC DESIGN CATEGORY B; THEREFORESPECIALINSPECTIONS FOR SEISMIC RESISTANCE ARE NOT REQUIRED.
FOUNDATION NOTES
NET ALLOWABLE SOIL BEARING PRESSURE = 3000 PSF PER GEOTECHNICAL REPORT.
F-1. ALL COLUMN FOOTINGS ARE TO BE CENTERED UNDER COLUMN CENTERLINES,UNLESS NOTED OR DETAILED OTHERWISE.
F-2. THE FOUNDATION CONTRACTOR SHALL FULLY REVIEW UNDER-GROUNDPLUMBING DRAWINGS AND SHALL COORDINATE WITH THE UNDER-GROUNDPLUMBING CONTRACTOR TO DEPRESS FOOTINGS AND PROVIDE PIPE SLEEVESTHROUGH FOUNDATION WALLS AS NECESSARY TO ACCOMMODATE PLUMBINGLINES OR TRAPS WHICH PENETRATE CONCRETE FOOTINGS OR FOUNDATIONS.
F-3. PROVIDE PVC SLEEVES THROUGH FOUNDATION WALLS/FOOTINGS FOR PIPE,CONDUIT, AND CABLE PENETRATIONS, INCLUDING ELECTRICAL GROUNDINGSYSTEM CABLES. SEE APPROPRIATE DRAWINGS FOR LOCATIONS/SIZES.PLACE SLEEVES IN LOCATIONS TO AVOID DISPLACING REINFORCING STEEL.
F-4. FOOTING SUBGRADES SHALL BE CLEAN AND FREE OF DEBRIS, STANDINGWATER, AND LOOSE SOIL.
F-5. COORDINATE WITH ARCHITECTURAL AND CIVIL DRAWINGS FORMISCELLANEOUS FOUNDATIONS NOT SHOWN ON STRUCTURAL DRAWINGS.
F-6. CONTROL JOINTS IN THE CAST-IN-PLACE CONCRETE FOUNDATION WALLSSHALL BE PLACED AT SPACING NOT TO EXCEED 20' O.C. OR AS LOCATEDPER DRAWINGS AND SHOULD ALIGN WITH MASONRY CONTROL JOINTSWHERE APPLICABLE. SEE DETAIL SHEETS FOR CONTROL JOINT DETAILS.PROVIDE VERTICAL "V" GROOVE AT ALL CONSTRUCTION AND CONTROLJOINTS. CONTRACTOR SHALL SUBMIT PLANS OF JOINT LOCATIONS FORAPPROVAL.
F-7. SEE TYPICAL SLAB-ON-GRADE DETAILS FOR SLAB AND SUB-BASEREQUIREMENTS. THESE WILL BE TYPICAL THROUGHOUT UNLESS NOTEDOTHERWISE.
F-8. A LEAN CONCRETE MUD SLAB 2" TO 3" THICK SHALL BE USED IN THE FOOTINGEXCAVATION IF THE BOTTOM OF THE EXCAVATION TENDS TO BECOME MUDDYAND SOFT DUE TO CONSTRUCTION ACTIVITY. LEAN CONCRETE SHALL HAVE AMINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2000 PSI.
F-9. COORDINATE GROUNDING REQUIREMENTS FOR FOUNDATION/FOOTINGREINFORCING STEEL WITH ELECTRICAL DRAWINGS. COORDINATEINSTALLATION OF GROUNDING WIRES/EQUIPMENT WITH ELECTRICALCONTRACTOR PRIOR TO CASTING CONCRETE.
CONCRETE & REINFORCING STEEL NOTES
MATERIAL PROPERTIES (U.N.O.)COMPRESSIVE STRENGTH - F'c = 4 KSICONCRETE REINFORCEMENT - Fy = 60 KSI (A615 GR 60)
CR-1. PROVIDE ONE (1) HOOKED REINFORCING BAR IN CONCRETE FLOOR SLABTO SERVE AS A “CONCRETE ENCASED ELECTRODE” IN ACCORDANCEWITH THE NATIONAL ELECTRIC CODE. COORDINATE WITH ELECTRICALCONTRACTOR FOR EXACT LOCATION. HOOKED REINFORCING BAR SHALLCONFORM TO THE FOLLOWING:
A. UNCOATED, LOW-ALLOY STEEL, CONFORMING TO ASTM A706.B. BAR SIZE NUMBER 4.C. HOOKED AT ONE END ONLY.D. MINIMUM HORIZONTAL LENGTH OF REINFORCING BAR ENCASED IN
CONCRETE SLAB SHALL BE 20’-0”.E. MINIMUM VERTICAL PROJECTION OF REINFORCING BAR HOOK ABOVE
CONCRETE SLAB SHALL BE 1’-8”.F. MINIMUM COVER ALL AROUND REINFORCING BAR SHALL BE 2”.
CR-2. ALL BAR LAPS SHALL CONFORM TO ACI 318 CLASS "B" SPLICE CRITERIA.USE TOP BAR LAP LENGTHS FOR TOP BARS IN SLABS AND BEAMS OVER14" DEEP. MINIMUM BAR LAPS AS FOLLOWS U.N.O.:
FOR EPOXY COATED BARS, PROVIDE 1.5 TIMES THE INDICATED LAP LENGTH.FOR TOP BARS PROVIDE 1.3 TIMES THE INDICATED LAP LENGTH.
CR-3. LAP LENGTH SHALL BE SPECIFICALLY NOTED ON SHOP DRAWINGSWHERE MORE THAN ONE BAR MAKES UP A CONTINUOUS STRING.
CR-4. HORIZONTAL BARS SHALL BE DETAILED TO SHOW THE DISTANCE FROMAT LEAST ONE END OF THE BAR TO THE NEAREST BUILDING GRID LINEOR WALL.
CR-5. REINFORCING SHALL BE DETAILED IN ACCORDANCE WITH ACI 315.
CR-6. ALL REINFORCEMENT BARS SHALL BE FABRICATED IN ACCORDANCEWITH THE LATEST CRSI MANUAL OF STANDARD PRACTICE AND SHALL BECLEAN AND FREE OF GREASE AND SCALING RUST.
CR-7. CONTINUOUS TOP AND BOTTOM BARS, WHEN SHOWN IN TRANSVERSESECTION ONLY, SHALL BE LAPPED AS FOLLOWS:
TOP BARS NEAR MID-SPANS;BOTTOM BARS DIRECTLY OVER SUPPORTS, U.N.O.
CR-8. HOOK HORIZONTAL WALL AND BEAM REINFORCING BARS ATDISCONTINUOUS ENDS, TYPICAL U.N.O. EXTEND REINFORCEMENTTO FAR FACE OF PIERS/PEDESTALS AND/OR COLUMNS U.N.O.
CR-9. PROVIDE HOT/COLD WEATHER PROCEDURES AND PROTECTIONIN ACCORDANCE WITH ACI RECOMMENDATIONS AND PROJECTSPECIFICATIONS.
CR-11. PROVIDE ADDITIONAL #5 BARS AT 4'-0" LONG 3" BELOW TOP OFSLAB AT 45° TO ALL REENTRANT CORNERS AND OPENINGS INCONCRETE SLABS AND AS SHOWN.
CR-12. ALL CONCRETE FOUNDATION WALLS SHALL HAVE A MINIMUM OF(2) #5 BARS CONTINUOUS TOP AND BOTTOM, UNLESS NOTED ORDETAILED OTHERWISE.
CR-13. EXTEND ALL PIER STEEL TO PROVIDE STD. HOOK UNDER FOOTINGREINFORCEMENT, UNLESS NOTED OTHERWISE.
CR-14. ALL CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM WITHTHE LOCAL BUILDING CODE REQUIREMENTS AND THOSE OF THEFOLLOWING STANDARDS (LATEST EDITION):
"ACI 318, BUILDING CODE REQUIREMENTS FOR REINFORCED CONC.""ACI 315, DETAILS AND DETAILING OF CONCRETE REINFORCEMENT""ACI 301, SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BLDGS.""ACI 307, RECOMMENDED PRACTICE FOR CONCRETE FORM WORK"
CR-15. SEE SECTION 033000 OF SPECIFICATIONS FOR INFORMATION REGARDINGCONCRETE MIX DESIGN, TESTING, MATERIALS, AND ADMIXTURES.
CR-16. ALUMINUM CONDUIT IS NOT PERMITTED TO BE EMBEDDED IN CONCRETE.
CR-17. REFER TO FLATWORK DRAWINGS AND/OR SPECIFICATIONS FORSLAB-ON-GRADE FINISH TYPES AND DEPRESSIONS REQUIRED FOR MATS,TILE, AND OTHER FINISH MATERIALS.
CR-18. PROVIDE FOOTING DOWELS TO MATCH VERTICAL WALL REINFORCING.WHERE WALL REINFORCING IS NOT INDICATED, DOWEL FOOTING TOFOUNDATION WALLS WITH #5 REBAR AT 16" O.C. BY 3'-0" LONG, WITHSTANDARD HOOKS EMBEDDED A MINIMUM OF 9" INTO FOOTING.
CR-19. ALL PIER FOOTINGS TO HAVE DOWELS WITH STANDARD HOOKS OF SAMESIZE AND QUANTITY AS PIER STEEL. DOWELS TO LAP PIER STEEL ASREQUIRED FOR A CLASS "B" TENSION SPLICE.
CR-20. ALL OPENINGS IN CONCRETE FOUNDATION WALLS ARE TO HAVE (4) #5DIAGONAL BARS EACH FACE OF THE WALL UNLESS OTHERWISE NOTED.BARS SHALL EXTEND 2 FEET BEYOND OPENING ON EACH SIDE.
CR-21. UNLESS NOTED OTHERWISE, THICKEN THE SLAB-ON-GRADE BENEATHINTERIOR MASONRY PARTITIONS 8 INCHES BELOW BOTTOM OF SLAB ONGRADE. THICKENED PORTION TO EXTEND 8 INCHES BEYOND THE FACEOF THE WALL ON EACH SIDE. REINFORCE THE THICKENED PORTION WITH(3) #5 CONTINUOUS LONGITUDINAL REINFORCING BARS AND #5 TRANSVERSEBARS AT 16" O.C., U.N.O.
CR-22. PITCH CONCRETE TO FLOOR DRAINS. COORDINATE WITH PLUMBING ANDARCHITECTURAL DRAWINGS.
CR-23. UNLESS NOTED OTHERWISE, PROVIDE CONTROL OR CONSTRUCTION JOINTSIN SLABS-ON-GRADE AT 15 FOOT MAXIMUM CENTERS EACH DIRECTION.CONTRACTOR SHALL SUBMIT PLANS OF JOINT LOCATIONS TO THEARCHITECT/ENGINEER FOR APPROVAL PRIOR TO CASTING SLABS-ON GRADE.COORDINATE WITH ARCHITECTURAL DRAWINGS AND FLOOR FINISHES SUCHAS TILE AND TERRAZZO.
GENERAL NOTES
G-1. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO STARTOF CONSTRUCTION - RESOLVE ANY DISCREPANCY WITH ARCHITECT/ENGINEER.
G-2. FOR CLARITY, ALL EXTERIOR SLABS AND SIDEWALKS MAY NOT BE SHOWN.FOR EXACT DIMENSIONS, LOCATIONS, JOINTS AND SCORE LINES, SEEARCHITECTURAL AND/OR CIVIL DRAWINGS.
G-3. VERIFY ALL SIZES, WEIGHTS AND LOCATIONS OF MECHANICAL AND ELECTRICALEQUIPMENT, ROOF PENETRATIONS, DUCTS, ETC. WITH MECHANICAL ANDELECTRICAL CONTRACTORS AND FIELD CONDITIONS.
G-4. DETAILS MARKED "TYPICAL" MAY OR MAY NOT BE CUT ON PLANS, BUT SHALLAPPLY UNLESS NOTED OTHERWISE.
G-5. STRUCTURAL SYSTEM IS DESIGNED TO WORK AS A COMPLETED SYSTEM, ANYSHORING OR BRACING NECESSARY DURING CONSTRUCTION SHALL BE THERESPONSIBILITY OF THE GENERAL CONTRACTOR.
G-6. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING PLANS FORSLEEVES, INSERTS, ETC. NOT SHOWN ON STRUCTURAL PLANS.
G-7. NO PIPES OR SLEEVES FOR MECHANICAL TRADES SHALL PASS THROUGHSTRUCTURAL MEMBERS WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER.
G-8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL SITE SAFETY AND ALLACCIDENTS WHICH RESULT IN DEATH, PERSONAL INJURY, OR DAMAGE TOPROPERTY ARISING OUT OF OR IN CONNECTION WITH THE PERFORMANCE OFTHE WORK.
G-9. IT IS THE OWNER'S RESPONSIBILITY TO POST LIVE LOADS PER SECTION 1603.3OF THE GOVERNING CODE.
G-10. SECTIONS, DETAILS, AND NOTES SHOWN ON THE DRAWINGS ARE INTENDEDTO BE TYPICAL AND SHALL APPLY TO SIMILAR CONDITIONS ELSEWHERE,UNLESS OTHERWISE SHOWN.
DO NOT SCALE DRAWINGS!!!!
EARTHWORK NOTES
EW-1. SEE GEOTECHNICAL REPORT AND SPECIFICATIONS FOR DEFINITION OFMATERIALS AND COMPACTION REQUIREMENTS.
EW-2. U.N.O., THE CONTRACTOR SHALL RETAIN AN INDEPENDENT, QUALIFIEDGEOTECHNICAL ENGINEERING FIRM/TESTING AGENCY TO IDENTIFY AREASOF POOR SOILS, TO MONITOR PROPER SUBGRADE PREPARATIONS AND TOOVERSEE AND TEST THE PLACEMENT OF COMPACTED FILL MATERIAL.
EW-3. ALL SUBTERRANEAN STRUCTURES, UTILITIES, PIPING, ETC. IIN THE AREAOF EXCAVATIONS TO BE LOCATED AND MARKED BY CONTRACTOR PRIORTO EARTH REMOVAL WORK. CONTRACTOR TO MAINTAIN MARKERS UNTILEXCAVATION ACTIVITIES HAVE CEASED. IF UNDERGROUND UTILITYCONFLICTS ARE DISCOVERED BEFORE OR ENCOUNTERED DURINGEXCAVATION, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY.
EW-4. BEFORE PLACING FOOTINGS, FOUNDATIONS OR SLAB-ON-GRADE,THE SUB-GRADE SHALL BE PREPARED AND INSPECTED AS REQUIREDBY THE SPECIFICATIONS.
EW-5. REFERENCE THE GEOTECHNICAL REPORT INCLUDED IN PROJECT MANUALFOR REQUIREMENTS FOR EXCAVATION AND CONTROL OF GROUND WATERDURING CONSTRUCTION. EXISTING SOILS MAY EXPERIENCE A LOSS OFSTRENGTH IF SURFACE WATER IS ALLOWED TO ACCUMULATE IN THE EXCAVATIONS; DO NOT ALLOW SURFACE WATER TO ACCUMULATE INTHE BOTTOM OF EXCAVATIONS.
EW-6. WHERE STRUCTURES DERIVE SUPPORT FROM FILL-SUPPORTEDFOUNDATIONS AND AT SLAB-ON-GRADE, FILL SHALL BE COMPACTED TO92% OF MODIFIED PROCTOR MAXIMUM DRY DENSITY U.N.O.
EW-7. NO FILL SHALL BE PLACED OVER FROZEN, MUDDY, OR OTHER DELETERIOUSMATERIAL. NO FILL SHALL BE PLACED OVER A PREVIOUS LIFT THAT HASNOT BEEN ADEQUATELY COMPACTED PER SPECIFICATIONS.
EW-8. BACKFILL AGAINST FOUNDATION WALLS SHALL BE PLACED EVENLY ONALL SIDES IN ORDER TO ACHIEVE GENERALLY BALANCED LOADINGS.
CLSM = CONTROLLED LOW STRENGTH MATERIAL ("FLOWABLE FILL")
CONT = CONTINUOUS
DBLT = DOUBLE-TEE
DIA = DIAMETER
DTB = DOUBLE-TEE BEARING
EF = EACH FACE
EL = ELEVATION
EW = EACH WAY
F# = SPREAD FOOTING TYPE
FDTN = FOUNDATION
FV = FIELD VERIFY
GALV = GALVANIZED
HPC = HIGH PERFORMANCE COATING
JB = JOIST BEARING
LLH = LONG LEG HORIZONTAL
LLV = LONG LEG VERTICAL
MBS = METAL BUILDING SUPPLIER
NIC = NOT IN CONTRACT
NTS = NOT TO SCALE
OC = ON CENTER
P# = PIER TYPE
PCB = PRECAST BEARING (ELEVATION)
PRCST = PRECAST
Rxn = REACTION
SF# = STRIP FOOTING TYPE
SIM = SIMILAR
SST = STAINLESS STEEL
STL = STEEL
T.O. = TOP OF ________
TBD = TO BE DETERMINED
TOC = TOP OF CONRETE
TOF = TOP OF FOOTING
TOL = TOP OF LEDGE
TOP = TOP OF PIER
TOS = TOP OF STEEL
TOW = TOP OF WALL
TPC = TOP OF PRECAST
TSL = TOP OF SLAB
TYP = TYPICAL
UNO = UNLESS NOTED OTHERWISE
WWF = WELDED WIRE FABRIC/REINFORCEMENT
03/25/14 TYPE B-3 FINALSUBMITTAL
STRUCTURAL TESTING AND INSPECTION
TI-1.IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT ALL STRUCTURALWORK FOR CONFORMANCE WITH THE CONTRACT DOCUMENTS. ANYSTRUCTURAL INSPECTION PROVIDED BY OTHERS DOES NOT RELIEVE THECONTRACTOR OF THIS RESPONSIBILITY. ANY STRUCTURAL DEVIATIONSFROM THE CONTRACT DOCUMENTS THAT ARE FOUND AT A LATER DATEAND ARE DECLARED TO BE SIGNIFICANT BY THE STRUCTURAL ENGINEERSHALL BE CORRECTED BY THE CONTRACTOR WITHOUT COST OR ANYDELAY TO THE PROJECT SCHEDULE.
TI-2.THE CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING AGENCY TOPROVIDE FIELD AND LAB TESTING OF CONSTRUCTION MATERIALS AND TOPROVIDE CONSTRUCTION INSPECTIONS. THE CONSTRUCTION INSPECTIONSHALL BE DONE BY QUALIFIED INSPECTORS THAT ARE SATISFACTORY TOTHE ARCHITECT AND ENGINEER.
TI-3.THE CONTRACTOR SHALL PROVIDE THE TESTING AND INSPECTING AGENCYACCESS TO ALL PLACES WHERE THE WORK IS BEING PERFORMED. AMINIMUM OF 24 HOURS NOTIFICATION SHALL BE GIVEN TO THE TESTINGAGENCY AND ARCHITECT/ENGINEER PRIOR TO THE COMMENCEMENT OFWORK REQUIRING TESTING OR INSPECTION.
TI-4.THE TESTING AGENCY IS NOT AUTHORIZED TO DIRECT OR APPROVE ANYCHANGES FROM THE CONTRACT DOCUMENTS. IF THE CONTRACTOR WISHESTO QUESTION THE TESTING AGENCY'S INTERPRETATION OF THE CONTRACTDOCUMENTS, HE MAY DO SO DIRECTLY WITH THE ARCHITECT ORSTRUCTURAL ENGINEER.
TI-5.THE TESTING AGENCY IS NOT AUTHORIZED TO STOP OR DELAY THE WORK.IF THE CONTRACTOR ELECTS TO CONTINUE WITH A CERTAIN PORTION OFWORK AFTER BEING NOTIFIED BY THE TESTING AGENCY THAT SUCH WORKIS NOT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, THECONTRACTOR DOES SO AT THEIR OWN RISK AND MAY BE REQUIRED TO CORRECT THE WORK AT A LATER DATE.
TI-6.THE TESTING AND INSPECTING AGENCY IS NOT INSPECTING FOR O.S.H.A.COMPLIANCE OR REQUIRED TO INSPECT TEMPORARY CONSTRUCTION,SUCH AS TEMPORARY BRACING. TEMPORARY CONSTRUCTION IS THECONTRACTOR'S SOLE RESPONSIBILITY.
TI-8.TESTING AND INSPECTION IS NOT REQUIRED FOR WORK PERFORMEDAT AN OFF-SITE FABRICATION SHOP, UNLESS SPECIFICALLY NOTED ORSPECIFIED OTHERWISE.
TI-9.THE PROJECT SPECIFICATIONS TYPICALLY INDICATE THE FREQUENCYOF CONSTRUCTION TESTING AND INSPECTIONS. WHERE THE FREQUENCYIS NOT INDICATED, THE TESTING AGENCY SHALL SUBMIT A PROPOSAL OFINSPECTION INTERVALS TO THE ARCHITECT/ENGINEER.
TI-10. THE TESTING AND INSPECTING AGENCY SHALL ISSUE ONGOING REPORTSOF INSPECTIONS AND TESTS TO THE CONTRACTOR, ENGINEER, ANDARCHITECT OF RECORD. ALL DISCREPANCIES SHALL BE BROUGHT TOTHE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION,THEN IF UNCORRECTED, TO THE ENGINEER AND ARCHITECT OF RECORD.
TI-11. INSPECTION AGENCY SHALL INSPECT FOR CONFORMANCE TO SPECIFIEDREQUIREMENTS FOR PROTECTING NEW CONCRETE AND MASONRY FROMTHE ADVERSE EFFECTS OF WEATHER, HEATING EQUIPMENT AND OTHERPOTENTIALLY HARMFUL CONDITIONS.
TI-12. CONSTRUCTION TESTING AND INSPECTION BY THE TESTING ANDINSPECTING AGENCY IS REQUIRED AS FOLLOWS:
A. CONCRETE TESTING PER THE SPECIFICATIONS.
B. CONCRETE INSPECTION SHALL INCLUDE THE PLACEMENT OFREINFORCEMENT. REINFORCING BAR SIZES, SPACING, TIES,LAPS, AND COVER.
C. MASONRY TESTING PER THE SPECIFICATIONS.
D. MASONRY INSPECTION SHALL INCLUDE THE PLACEMENT OFREINFORCEMENT. REINFORCING BAR SIZES, SPACING, AND LAPS.
E. INSPECTION OF FIELD WELDED MOMENT CONNECTIONS SHALLINCLUDE VISUAL AND/OR ULTRASONIC TESTING, AT THE TESTINGAGENCY'S OPTION. ALL OTHER FIELD WELDED CONNECTIONSSHALL BE VISUALLY INSPECTED AT A MINIMUM. THE WELDER'SCERTIFICATION SHALL ALSO BE VERIFIED.
F. FIELD BOLTING INSPECTIONS SHALL INCLUDE VISUAL INSPECTIONOF ALL THE CONNECTIONS RELATED TO STRUCTURAL STEEL. THESIZE, TYPE, AND QUANTITY OF BOLTS AND THEIR INSTALLATIONSHALL BE INSPECTED. WHERE SLIP-CRITICAL OR PRE-TENSIONEDBOLTS ARE SPECIFIED, PRE-TENSIONING OF BOLTS SHALL BEVERIFIED BY TESTING.
METAL BUILDING
MB-1. STRUCTURAL REQUIREMENTS FOR THE METAL BUILDING ARE SHOWN ONTHE S SHEETS AND ELSEWHERE. IT IS THE CONTRACTOR'S RESPONSIBILITYTO COORDINATE AND INCLUDE ALL REQUIREMENTS ON THE ENTIRE PROJECT.SEE 8/A-501 FOR LOW ROOF SUPPORT CONCEPT. SEE 4, 5/A-301 FOR CRANEBRACKET. SEE 4/A-301 FOR FRAME CLEARANCE AT HAUNCH.
MB-2. THIS IS A CRANE BUILDING. SEE SPECIFICATION 133419 FOR CRANE DATA INFORMATION.
MB-3. ON LOW ROOF, ROOF DECK WILL BE FASTENED TO TOP FLANGE OF PURLINSAS DESCRIBED UNDER METAL DECK NOTES. THIS WILL PROVIDE FULL LATERALBRACING TO THE TOP FLANGE OF THE PURLINS ON THE LOW ROOF.
MB-4. SEE ARCHITECTURAL FOR FRAME CLEARANCES AND CRANE BRACKETPLACEMENT.
MB-5. THE LOW ROOF IS A DIAPHRAGM CANTILEVERED FROM THE HIGHER NEW BUILDING. DESIGN BY METAL BUILDING MANUFACTURER. DO NOT PUT RODBRACING NEAR LINE 5.
MB-6. DESIGN ROD BRACING CONNECTIONS SO THAT BRACING HARDWARE IS ABOVECONCRETE FLOOR.
SHOP DRAWINGS
SD-1. SHOP DRAWINGS SHALL BE SUBMITTED FOR STRUCTURAL ITEMS AS REQUIREDBY THE SPECIFICATIONS. CONSTRUCTION DOCUMENTS SHALL NOT BEREPRODUCED FOR USE AS SHOP DRAWINGS.
SD-2. THE GENERAL CONTRACTOR SHALL REVIEW ALL SHOP DRAWINGS ANDPRODUCT DATA FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTSPRIOR TO SUBMITTAL. REVIEWED SUBMITTALS SHALL BE STAMPED BY THECONTRACTOR. ANY SHOP DRAWING OR PRODUCT DATA NOT REVIEWED ANDSTAMPED BY THE GENERAL CONTRACTOR WILL BE REJECTED. GENERALCONTRACTOR SHALL CLOUD OR FLAG ALL ITEMS NOT IN ACCORDANCE WITHTHE CONTRACT DOCUMENTS AND SHALL VERIFY ALL DIMENSIONS.
SD-3. ANY CHANGES, SUBSTITUTIONS OR DEVIATIONS FROM THE ORIGINALCONTRACT DRAWINGS SHALL BE CLOUDED BY THE MANUFACTURER ORFABRICATOR. ANY CHANGES, SUBSTITUTIONS, OR DEVIATIONS WHICH ARECLOUDED OR FLAGGED BY SUBMITTING PARTIES SHALL NOT BE CONSIDEREDAPPROVED AFTER THE ENGINEER'S REVIEW, UNLESS SPECIFICALLY NOTEDACCORDINGLY BY THE ENGINEER.
SD-4. THE APPROVED SHOP DRAWINGS DO NOT REPLACE THE ORIGINAL CONTRACTDRAWINGS. ITEMS OMITTED OR SHOWN INCORRECTLY ARE NOT TO BECONSIDERED CHANGES TO THE ORIGINAL CONTRACT DRAWINGS. IT IS THECONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ITEMS OMITTED OR SHOWNINCORRECTLY ARE CONSTRUCTED IN ACCORDANCE WITH THE CONTRACTDRAWINGS.
SD-5. SHOP DRAWING REVIEW IS INTENDED ONLY FOR GENERAL CONFORMANCETO THE DESIGN CONCEPT AND CONSTRUCTION DOCUMENTS.
SD-6. SHOP DRAWINGS WILL BE RETURNED FOR RESUBMITTAL IF MAJOR ERRORSARE FOUND DURING REVIEW.
SD-7. ALLOW A MINIMUM OF (10) WORKING DAYS FOR REVIEW OF SHOP DRAWINGSBY THE STRUCTURAL ENGINEER.
METAL DECK
MATERIAL PROPERTIES (U.N.0)ROOF DECK: 1.5B20, GALVANIZED, Fy = 33 KSI
MD-1. FASTEN ROOF DECK TO PURLINS WITH #12 SCREWS IN 36/3 PATTERN AND(2) #10 CSCREWS IN SIDELAP.
MD-2. U.N.O., ALL MISCELLANEOUS OPENINGS IN METAL ROOF DECK ARE TO BEFRAMED BY 5x3x3/8" ANGLES. LONG LEG OF ANGLES SHALL BE VERTICAL.ANGLES SHALL BE WELDED TO THE TOP CHORD/FLANGE OF ROOF FRAMINGAND EACH OTHER.
MD-3. U.N.O., METAL DECKING SHALL BE CONTINUOUS OVER 3 SPANS AND HAVEJOINTS OVER SUPPORTING MEMBERS.
MD-4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING POUR STOPS AT EDGESOF METAL DECK PER SDI POUR STOP SELECTION TABLE/RECOMMENDATIONSOR BENT PLATE POUR STOPS AS REQUIRED TO FORM THE SLAB EDGE.
MD-5. MAXIMUM PURLIN SPACING EQUALS 6'-0". PURLIN DESIGN BY METAL BUILDINGSUPPLIER.
1. SITE DATUM OF FINISHED FIRST FLOOR INDICATED ON CIVIL SITE PLAN =ELEVATION 100'-0" ON STRUCTURAL DRAWINGS.
2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THEATTENTION OF THE ARCHITECT/ENGINEER FOR FINAL DECISION.
3. NOT USED.
4. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,AND SYMBOLOGY.
5. REFER TO SHEETS S-501 AND S-502 FOR TYPICAL DETAILSNOT REFERENCED ON THIS SHEET.
6. TOP OF FOOTING ELEVATION = 97'-6" UNLESS NOTED OTHERWISE.
7. REFER TO DETAILS OF SHEET S-502 FOR TOP OF PIER ELEVATIONS.
8. TOP OF FOUNDATION WALL ELEVATION = 100'-8" UNLESS NOTEDOTHERWISE.
9. STRIP FOOTINGS SHALL BE CENTERED UNDER FOUNDATION/MASONRYWALLS UNLESS NOTED OTHERWISE.
10. PIER SIZES ARE MINIMUM REQUIRED FOR FOUNDATION STRENGTH.PIERS MUST BE AT LEAST 2 INCHES LARGER THAN METAL BUILDING BASEPLATES. IF NECESSARY, INCREASE PIER SIZES TO ACCOMODATE METALBUILDING BASE PLATES.
11. SEE ARCHITECTURAL FOR ADDITIONAL LINTELS, FRAMING AND METAL DECK.
1. SEE PIER DETAILS ON S-502 FOR TOP OF PIER ELEVATIONS.
2. REFERENCE TYPICAL TIE DETAILS FOR CROSS-TIE REQUIREMENTS.
3. WHEN PIERS ARE INTEGRAL WITH WALLS, PIER DIMENSIONS ARE INDICATED FOR THE PURPOSE OF DIMENSIONINGPIER TIES, SETTING VERTICAL REINFORCING, DEFINING EXTENT OF TOP OF PIER RECESS OR PROJECTION FROM TOPOF WALL. CENTER PIER REINFORCING CAGE BELOW COLUMN AND ORIENT LONG DIMENSION OF PIER WITH AXIS OFWALL UNLESS NOTED OR DETAILED OTHERWISE. CONTINUE WALL REINFORCING THROUGH PIERS WITH LAPS ASREQUIRED.
CONCRETE PIER SCHEDULE REMARKS
1.
03/25/14 TYPE B-3 FINALSUBMITTAL
TYPE SLB05
3"
8"
TYPE SLB08
CONCRETE SLAB WITH#4 BARS AT 16" O.C. EACH WAY,AT 2" CLEAR FROM TOP OF SLAB
FINE-GRADED GRANULAR
ENGINEERED FILL
PREPARED SUB-GRADE(SECTION - 312000)
3"
5"
CONCRETE SLAB WITH 6x6 -W2.9xW2.9 WWF, AT 2" CLEARFROM TOP OF SLAB
FINE-GRADED GRANULAR
VAPOR BARRIER(SECTION - 033000)
ENGINEERED FILL
PREPARED SUB-GRADE(SECTION - 312000)
RE
Q.
AS
RE
Q.
AS
1/4" WIDE JOINT (2 BLADES).SAW CUT 4 TO 12 HOURSAFTER CONCRETE IS PLACED.FILL WITH FLOOR CONTROLJOINT FILLER