S Strengths •This is an example text. •Go ahead an replace it with your own text. •This is an example text. Opportunities Space Sol a Space Sol a •This is an example text. •Go ahead an replace it with your own text. •This is an example text. O a DLF Epitom (DLF Cyber City, a DLF Epitom (DLF Cyber City, W Threats Weaknesses •This is an example text. •Go ahead an replace it with your own text. •This is an example text. lution for at lution for at T •This is an example text. •Go ahead an replace it with your own text. •This is an example text. at me (Bldg # 5) Gurgaon, India) at me (Bldg # 5) Gurgaon, India)
16
Embed
Strengths Weaknesses SS Space Solution for W Go ahead an replace it ... - DLF … PPT - 20.02.pdf · 2017. 12. 20. · DLF OOEpitome (DLF Cyber City, Gurgaon, India) W Threats Weaknesses
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SS
Strengths
•This is an example text.
•Go ahead an replace it with your own text.
•This is an example text.
Opportunities
Space Solution for
at
Space Solution for
at•This is an example text.
•Go ahead an replace it with your own
text.
•This is an example text. OO
at
DLF Epitome (DLF Cyber City, Gurgaon, India)
at
DLF Epitome (DLF Cyber City, Gurgaon, India)
WW
Threats
Weaknesses
•This is an example text.
•Go ahead an replace it with your own text.
•This is an example text.
Space Solution for
at
Space Solution for
at
TT•This is an example text.
•Go ahead an replace it with your own
text.
•This is an example text.
at
Epitome (Bldg # 5)(DLF Cyber City, Gurgaon, India)
at
Epitome (Bldg # 5)(DLF Cyber City, Gurgaon, India)
DLF Cybercity Master Plan
DLF Epitome
(Bldg. # 5)
DLF Epitome (Bldg # 5)
Cybercity Park – Next to DLF EpitomeEpitome (Bldg # 5)
Proposed Surface Parking – Next to DLF Next to DLF Epitome (Bldg # 5)
DLF Epitome (Bldg # 5)
Metro line & Rapid Metro Station – right in front
Walkers Ramp – Way out to smoking zone
Green Belt – right in front
Smoking Zone – Outside the Bldg.
Landscaped Internal Pathways
Pickup & Drop-off points
Ground Floor Retail / Amenities/ Amenities
Operational Food Court
Proposed Reception Plan – Tower C AtriumTower C Atrium
Proposed Reception Plan – Tower C AtriumTower C Atrium
Site Plan
Typical Floor Plan
Tower BTower A
Tower Total Floors
A 3B+G+6P+22F
B 3B+G+6P+18F
C 3B+G+6P+22F
Total Area
Tower CTower B
Area (sq.ft.)
706,224
617,520
736,509
2,060,253
Key Highlights
�[
� Independent development in a 10.563 acre plot
� Total of 9 level of car parking (3 basements + 6 podium)
� Dedicated gas based power plant for Bldg.5 of 40 MW
� Metro Station right in front of the Bldg.
� Ground Floor dedicated for Retail Amenities including food court