SEVENTH QUARTERLY REPORT: 1 st September 2017 – 31 December 2017 Prepared for Strengthening Public Financial Management for Social Protection (SPFMSP) Project December 2017
41

Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

SEVENTH

QUARTERLY

REPORT:

1st September

2017 – 31

December 2017

Prepared for

Strengthening

Public

Financial

Management

for Social

Protection

(SPFMSP)

Project

December

2017

Page 2: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Table of Contents Acronyms ................................................................................................................................................................ 3

Executive Summary ................................................................................................................................................. 5

Background and Introduction ................................................................................................................................. 6

Progress Under All Outputs ..................................................................................................................................... 7

Output 1: Improved mechanisms within SP sector of GoB. ................................................................................. 7

1.1. A fully functional Social Protection Budget Management Unit (SPBMU) at the Finance Division..... 7

Output 2: Improved GoB capacity to manage, implement and monitor social protection programmes .............. 8

2.1 Institutalisation of SP-PFM courses in selected training institutes and trainers trained. ................... 8

Output 3: Ministries and Departments of the Government of Bangladesh have access to a strengthened

evidence base on social protection ...................................................................................................................... 9

3.1: Diagnostic studies on 7 SP schemes under taken ............................................................................... 9

Output 4: Mechanisms in place that contribute to better targeting and monitoring in SP schemes ................ 10

4.1: A fully functional MIS at the SPBMU linked with 6 LMs to improve targeting of programmes,

timely delivery of transfers and monitoring of SP expenditure ..................................................................... 10

4.2 Costed plans for SP reform developed ............................................................................................ 14

Annex 1 ................................................................................................................................................................. 17

Annex 2 ................................................................................................................................................................. 19

Annex 3 ................................................................................................................................................................. 24

Annex 4 ................................................................................................................................................................. 25

Annex 5 ................................................................................................................................................................. 30

Page 3: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Acronyms

a2i Access to Information Project

BBC Bangladesh Computer Council

BBS Bangladesh Bureau of Statistics

DD Deputy Director

DfID Department for International Development

DFAT Department of Foreign Affairs and Trade

DGHS Directorate General of Health Services

DSF-MHVS Demand-Side Financing- Maternal Health Voucher Scheme

DSS Department of Social Services

ED Executive Director

FD Finance Division

G2P Government to People

GoB Government of Bangladesh

HDWWA Husband-Deserted Women and Widow’s Allowance

iBAS integrated Budgeting and Accounting System

IPF Institute of Public Finance Bangladesh

LM Line Ministry

LMA/MA Lactating Mothers Allowance and Maternity Allowance

MIS Management Information System

MJF Manusher Jonno Foundation

Page 4: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

MoDMR Ministry of Disaster Management and Relief

MoE Ministry of Education

MoF Ministry of Finance

MoHFW Ministry of Health and Family Welfare

MoPME Ministry of Primary and Mass Education

MoSW Ministry of Social Welfare

MoWCA Ministry of Women and Children’s Affairs

MSP Maxwell Stamp PLC

NID National ID

NPD National Project Director

OAA Old Age Allowance

PESP Primary Education Stipend Programme

PD Project Director

PFM of SP Public Financial Management of Social Protection

PIC Project Implementation Committee

PSC Project Steering Committee

Page 5: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Executive Summary

This Quarterly Report covers the implementation period from 1 September 2017 to 31 December 2017 of

SPFMSP project.

Progress has been made in all major work streams. All the targets in the Annual Work Plan (Annex 1) relevant to

this quarter have been met and work continues at a good pace. This is in part due to a strong commitment and

ownership from the Government of Bangladesh (GoB), specifically the Finance Division (FD) of the Ministry of

Finance (MoF), towards SPFMSP. The active participation of GoB officials from FD, Social Protection Budget

Management Unit (SPBMU), and the six associated Line Ministries (LMs) in various activities of the Project

continues to contribute to all the accomplishments of the SPFMSP Project.

FD has already started the process of integrating SPBMU into regular set up of FD. Organogram, Duties and

Responsibilities of SPBMU and its staff, Recruitment Rules and other related documents have been drafted and

are being processed for approval. Other necessary actions are also underway to ensure SPBMU, as a regular unit

of FD, is established before the start of the 2018-2019 budget. Capacity and necessary skills of GoB Officials are

being developed through their active engagement in the implementation of various SPFMSP project activities.

Monthly Coordination meetings of the Project are being held regularly, chaired by the NPD and participated by

the officials of the FD and the Project. Two such meetings were held during the reporting period. The second

Project Steering Committee (PSC) meeting chaired by the Secretary of Finance was held in November 2017

where some very important decisions on the sustainability of the Project were taken.

The FD has started implementing the Communication Strategy developed by the Project. FD has distributed

200,000 copies of flyers in Bengali with information about the Project. These were distributed at the

Development Fair organised by the GoB in December 2017 throughout Bangladesh. The SPFMSP website has

been maintained by the Project and all knowledge documents developed and produced by the Project have been

made available on the website.

The Project initiated discussions for institutionalising SP-PFM training courses in the selected training institutes

of the relevant ministries. Meetings were held with National Academy for Primary Education (NAPE) of Ministry

of Primary and Mass Education (MOPME), National Academy for Educational Management (NAEM), Secondary

and Higher Education Division, Ministry of Education, National Academy of Social Services Academy (NASS),

Ministry of Social Welfare (MoSW) and Institute of Public Finance (IPF), Ministry of Finance, and all these

institutes have agreed to continue hosting the course after June 2018 when the Project has ended.

After the successful design of the SPBMU MIS and piloting of two schemes i.e. Maternity Allowance (MA)

programme of Ministry of Women and Children Affairs (MoWCA) and Old Age Allowance (OAA) programme of

Ministry of Social Welfare (MoSW), the project has initiated the process of extending the linkage of the SPBMU

MIS to other line ministries namely Ministry of Social Welfare (MoSW), Ministry of Women and Children Affairs

(MoWCA), Ministry of Education (MoE), Ministry of Primary and Mass Education (MoPME) and Ministry of

Disaster Management and Relief (MoDMR). During the reporting period, the project conducted an assessment

on the digitisation status of the schemes in the six LMs. The outcome of the assessment guided the design of

Page 6: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

linkage between SPBMU MIS and six schemes of five Line Ministries in place of six ministries planned earlier.

Demand Side Financing (DSF) scheme of MoHFW could not be included in the design of linkage with SPBMU MIS

because its data has not been digitised and it would not be feasible to digitise the data and configure linkage to

SPBMU MIS before June 2018. The report on design of linkage was submitted to DFID in December 2017.

The project was mandated to perform diagnostic studies of seven existing programs of various line ministries.

With the completion of the PESP Diagnostic study in the quarter under review, the project has met a 100%

target of completing all the diagnostic studies. The Ministries and departments of the Government of

Bangladesh (GoB) have already started accessing the evidence based recommendations on social protection.

While the MoHFW has incorporated some of the recommendations from the diagnostic study of DSF – MHVS

into their operational plan, other ministries too are in the process of using these studies to improve their

program design and delivery. More recently, the MoWCA has used the evidences and recommendations of the

reform plan and have accordingly put forward their budgetary proposals to the FD for the 2018–19 fiscal year,

the deliberations and approvals for which are expected by June 2018.

On the side of reform plans, the quarter witnessed initiating the development of the third reform plan namely

OAA HDDWA. A team of national and international consultants was deployed during the quarter who started the

work, conducted meetings and performed field visits along with the SPFMSP team, SPBMU team, and other

stakeholders. A draft report on this reform plan was prepared and submitted to DFID in December 2017 and the

final version is scheduled to be submitted after the dissemination workshop likely to be held in March 2018.

Developing the last and final reform plan on VGD shall begin in the next quarter (January 2018-March 2018).

The preliminary task such as drafting the ToR on the basis of agreed recommendations and selection of team of

consultants have been accomplished in the current quarter.

Background and Introduction Strengthening Public Financial Management for Social Protection (SPFMSP) Project is a complex technical

assistance intervention that works closely with the Finance Division of the Government of Bangladesh (GoB)

Ministry of Finance(MoF), and six implementing LMs including the Ministry of Social Welfare (MoSW), the

Ministry of Primary and Mass Education (MoPME), Ministry of Women and Children’s Affairs (MoWCA), the

Ministry of Education (MoE), the Ministry of Health and Family Welfare (MoHFW) and the Ministry of Disaster

Management and Relief (MoDMR). The Project is co-financed by UK Aid through (DFID) and Australian Aid

through the Department of Foreign Affairs and Trade (DFAT) and is managed by Maxwell Stamp PLC (MSP).

SPFMSP is one component of the DFID-funded Strengthening Government Social Protection Systems for the

Poor Programme (SGSP). The aim of the five-component SGSP Programme was to support the GoB to establish

policies, budgets and plans for a more effective and efficient social protection system. The other four

components of SGSP were delivered by four implementing partners: The United Nations Development

Programme (UNDP), the World Food Programme (WFP), WB, and the Manusher Jonno Foundation (MJF), a local

Bangladeshi NGO. However, funding for these four components finished in August 2017 whereas the SPFMSP

was given a ten month extension to June 30th 2018

The Technical Assistance Project Proforma (TAPP) of the SPFMSP Project was approved by the Government in

August 2015. The Project is being implemented by the Social Protection Budget Management Unit (SPBMU) of

the FD under the overall supervision of the Additional Finance Secretary (Budget) who also acts as the National

Project Director (NPD) for the Project.

Page 7: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

SPFMSP has two governance structures:1) The Project Steering Committee (PSC) oversees the Project and is

chaired by the Finance Secretary with representation from six LMs, DFID, DFAT and other government relevant

ministries/agencies; and 2) the Project Implementation Committee (PIC), chaired by the NPD with representation

from six LMs, DFID, DFAT, monitors the timely implementation of the Project.

Progress Under All Outputs The activities and key achievements are described below under the three major outputs.

Output 1: Improved mechanisms within SP sector of GoB.

1.1. A fully functional Social Protection Budget Management Unit (SPBMU) at the Finance

Division

1.1.1 Integrating SPBMU into the regular setup of FD with defined roles & responsibilities and its expenditure is

included in GoB revenue budget

A fully functional SPBMU is expected to sustain the various Project outputs and assist the different budget

sections of the FD in drawing evidence based budget for social protection expenditure, manage the SPBMU MIS

and oversee the implementation of the G2P payment system developed by the Project. Important decisions were

taken to ensure that each quarter sees the necessary steps that have to be taken so that the Unit becomes fully

functional by the end of the Project in June 2018. In the reporting quarter progress has been made to attain this

output.

The Project’s Steering Committee (PSC) (Annex 2) headed by the Secretary, FD, in November 2017, with

representation from SPFMSP related six Line Ministries, Planning Commission, ERD and Development Partners

(DFID, DFAT) approved the setting up of SPBMU as a regular outfit of the FD. Meetings were held subsequently

in the FD to discuss steps needed and initiatives have, since then, been taken to ensure institutionalising of the

SPBMU in the regular setup of the FD and its expenditure is included in the revenue budget. Organogram, Duties

and Responsibilities of SPBMU and its staff, Recruitment Rules and other related documents drafted and under

process for approval which is expected to be completed before start of the 2018-2019 budget. Capacity and

necessary skills of GoB Officials are being developed through their active engagement in the implementation of

various SPFMSP project activities.

Incumbent NPD Mr Muslim was promoted to the post of Secretary Finance, in October 2017 and Mr Abdur Rouf Talukder, the Additional Secretary of the Finance Division, was subsequently appointed as the NPD of the Project in addition to his duties at the Finance Division. The Project also saw another change in staffing during this reporting period as the Executive Director of the Project retired from the Project in November 2017. This position has been filled by the Deputy Director who is working in the capacity of Executive Director In-charge.

1.1.2 Implementation of SPBMU communications strategy

A Communication Strategy which was developed in 2017 and was handed over to the FD, the FD has initiated

steps to implement the strategy. A flyer (Annex 3) depicting various activities and progress of the Project was

designed and developed by FD with the assistance of the Project. FD has distributed 200,000 copies of the flyer

at the Development Fair organised by the GoB in December 2017 throughout Bangladesh down to Upazila level.

The fair was visited by people from all strata of the society. The activities and progress of the project continues

to be disseminated through several meetings, workshops, field visits held during the reporting quarter on the

Page 8: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

various issues relating to the implementation of the Project. Those meetings, workshops were attended by

officials of GoB, DPS, and other stakeholders including local government representatives and beneficiaries. The

SPFMSP website (www.spfmsp.org) has been maintained by the Project and all knowledge documents developed

and produced by the Project have been made available on the website. Initial discussions have taken place to

hand over the website to the FD before the end of the Project.

Output 2: Improved GoB capacity to manage, implement and monitor social protection

programmes

2.1 Institutalisation of SP-PFM courses in selected training institutes and trainers trained.

2.1.1 Strengthening of selected departmental training institutes by integrating SP Public Financial Management

courses in their regular training program

As per the Capacity Building Strategy, the Project has initiated discussions to institutionalise the training courses

on SP-PFM within the core training programmes of the relevant ministries. Steps are being taken to ensure that

the incorporation of the training course content happens in a manner that is implementable by all training

institutes. Time, cost and resource persons are issues that the Project and the training institutions are discussing

to best ensure the smooth adoption of the SP-PFM course in the regular ongoing training courses.

Meetings have been held with National Academy for Primary Education (NAPE) of Ministry of Primary and Mass

Education (MOPME), National Academy for Educational Management (NAEM), Secondary and Higher Education

Division, Ministry of Education, National Social Services Academy (NSSA), Ministry of Social Welfare (MoSW) and

Institute of Public Finance Management Bangladesh (IPFB), Ministry of Finance, who will continue conducting

the course after June 2018 when the Project has ended. Before the end of the Project, SPFMSP will provide all

the institutions mentioned with the course content and layout to safeguard the smooth transition of ownership

of the courses.

2.1.2 Training of Trainers through National/Global courses

The Project’s capacity development initiative providing National Courses on Public Financial Management for

Social Protection (PFM for SP) in Bangladesh in an attempt to create a pool of trainers to ensure sustainability is

ahead on schedule and a Training of Trainer courses proposal has been drafted and is being discussed with FD

and IPF. A rigorous 3 to 5-day training of trainers (ToT) course has been planned which will include advanced

training on delivery of training, intensive coaching, on effective teaching strategies for engaging future course

participants, targeted instruction and practice in training others to deliver the SP-PFM curriculum.

This ToT will train selected individuals at a further advanced level on SP-PFM as well, in order to enhance their

ability to answer questions and solve problems that may arise at the implementation stage in the future.

Participants will be selected from the officials of FD and LMs who previously participated in the national courses

on SP-PFM organised by the SPFMSP. Preference will be given to those officials who worked as facilitators for

the national courses and are associated with the departmental trainings or trainings of similar nature.

The number of participants per ToT course will be limited to 30. So far all the trainings on SP-PFM have been

organised and hosted by the SPFMSP project but in future that the training courses are planned to be

institutionalised to ensure the sustainability and accomplishment of the goals set by the FD. The expected

outcome of this course is the development of confident and competent trainers with the skills and latest

techniques required to help design and implement future training courses when and where needed without

dependency on externals.

Page 9: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Output 3: Ministries and Departments of the Government of Bangladesh have access

to a strengthened evidence base on social protection

3.1: Diagnostic studies on 7 SP schemes under taken

With the completion of the PESP Diagnostic study in the quarter under review, the project has met a 100%

target of completing all the diagnostic studies. The Project was mandated to perform diagnostic studies on 7

existing SP schemes belonging to various line ministries.

3.1.1 Conducting diagnostic study on stipend programs including disability stipend (as the 7th scheme)

The diagnostic study on stipend programmes was undertaken in the extension phase as a part of the mandated

activities of SPFMSP Project being implemented by the Finance Division in association with 6 Line Ministries

including MoPME, MoE and MoSW. The diagnostic study was initiated in October 2017 and was completed well

within the stipulated timeline of December 25th, 2018. The study that was focussed on Primary Education

Stipend Program (PESP) of the Ministry of Primary and Mass Education (MoPME) also captured the other stipend

programmes in the country including the ones for secondary students and students with disability.

The diagnostic study presented an independent and comprehensive analysis of the stipend programmes in

Bangladesh with a focus on Primary Education Stipend Project (PESP) being implemented by the Ministry of

Primary and Mass Education. The other stipend programmes are being implemented by the Ministry of Education

and Ministry of Social Welfare. The purpose of performing the diagnostic was to conduct an operational and

financial analysis of the three programmes with central focus on identification of issues and challenges on the

processes adopted for money flows from Ministry of Finance to the end beneficiaries under the PESP through

multiple operational level and any challenges in transfer of money at different levels. The study provided

evidence-based concrete recommendations to improve design, eligibility, features, database of beneficiaries,

delivery system, beneficiary selection if any, and efficiency of resource utilization that maximize Value for

Money (VfM). Study focused at exploring how financial allocations can be more meaningful and useful for the

primary students’ stipend programme. Specifically, it focused on the delivery mechanism including the payment

system and how the beneficiary data could be used more efficiently to generate MIS and integrate into the

Payment System.

The methodology for the diagnostic study comprised a combination of primary and secondary surveys. On the

primary side, it ranged from a wide variety institutional interviews to focused group discussions with the

beneficiaries while on the secondary side, a literature / desk review of the existing documents and reports was

performed for the stipend programmes. Field visits to different Upazila was performed to understand the field

perspectives.

To discuss the findings and recommendations made in the diagnostic study, a dissemination workshop (Annex 4)

was held at the Ministry of Primary and Mass Education on Thursday, 14th of December at the Ministry of

Primary Education and was chaired by the Secretary, MoPME. The dissemination workshop was also attended by

officials of the Finance Division as well as three-line ministries (MoPME, MoE and MoSW) and their departments

/ projects engaged in the implementation of various stipend programs. The Workshop agreed broadly with the

findings and recommendations of the study. The comments and suggestions made in the workshop have been

appropriately addressed in the final version of the report that was submitted to the DFID by the end of

December 2017. The Workshop also recommended to the Government for considering the suggestions made in

the report for implementation. The final report will also be sent to Finance Division shortly so that the FD can

take up further deliberations with the Ministry.

Page 10: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

With the completion of the PESP Diagnostic study, the project has met a 100% target of completing the

diagnostic studies. As mentioned earlier, the Ministries and Departments of the Government of Bangladesh have

already started accessing the evidence based recommendations on social protection. More recently, the MoWCA

has used the evidences and recommendations and have accordingly put forward their budgetary proposals to the

FD for the 2018 – 19 fiscal year, the deliberations and approvals for which are expected in this quarter.

Output 4: Mechanisms in place that contribute to better targeting and monitoring in

SP schemes

4.1: A fully functional MIS at the SPBMU linked with 6 LMs to improve targeting of

programmes, timely delivery of transfers and monitoring of SP expenditure

As envisaged in the TAPP, one of the core functions of the SPFMSP project in the first phase of the project which

ended in August 2017 was to develop a MIS for SPBMU of Finance Division (FD) that ensures efficient and

effective social transfers to the poor, monitor and control fiduciary risks, and to increase value for money (VfM)

in delivery of social protection programs. What was achieved in the first phase that ended in August 2017 was

designing and setting up the SPBMU MIS and then setting up automatic transfer of data from the MIS databases

of two schemes namely Maternity Allowance (MA) program of Ministry of Women and Children Affairs (MoWCA)

and Old Age Allowance (OAA) program of Ministry of Social Welfare (MoSW) to the central SPBMU MIS.

In the current phase of the project which runs from 1st September 2017 to 30th June 2018, SPFMSP is required

to establish auto linkages between the SPBMU MIS to a minimum of one scheme of the six Line Ministries

namely: Ministry of Social Welfare (MoSW), Ministry of Women and Children Affairs (MoWCA), Ministry of

Health and Family Welfare (MoHFW), Ministry of Education (MoE), Ministry of Primary and Mass Education

(MoPME) and Ministry of Disaster Management and Relief (MoDMR).The SPFMSP Project team have been

working on modalities of realising this objective as evident in the progress in the MIS work stream over the past

4 months running from September 2017 to December 2017.

Described below is the brief analysis of some of the key activities that the SPFMSP MIS team have undertaken

during this Quarter under each of the deliverables below.

4.1.1 Designing of linkages between SPBMU MIS and Line Ministries

In order to link the schemes of the 6 Line Ministries to the SPBMU MIS, several inception activities were carried

out to determine the anticipated scope of work. Some of the key inception activities listed below were

undertaken before the design of the linkage and further development of the SPBMU MIS:

Assessment of MoE, MoPME, MoDMR and MoHFW MISs and digitization status of schemes. Several

meetings were conducted with the Directorates of these Ministries responsible for the

management of the various Cash Transfer programs with main focus on Primary Education Stipend

Program (PESP), Employment Generation Program for the Poorest (EGPP), Secondary Education

Stipend Program (SESP) and Demand Side Financing (DSF).

Assessment of MoWCA, MoSW MISs and digitization status of schemes which have not been linked

to SPBMU MIS. The focus was on Lactating Mothers schemes of MOWCA which is almost similar to

already linked MA, Disability Allowance (DA) and Widows Allowance of MoSW.

Technical Assessment of linking of iBAS++ and SPBMU MIS in readiness for piloting of proposed

payments system in OAA and MA schemes in selected Upazila.

Preparation of assessment report and TOR for Linkage of SPBMU MIS with the 6 Line Ministries and

Page 11: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

further development of SPBMU MIS.

The findings from the assessment of the status of data digitisation in 6 Line Ministries is summarised below

Ministry and scheme Digitisation Status

Ministry of Health-DSF MIS does not exist and therefore data is stored in paper form and excel sheets at

Upazila level.

Beneficiaries’ data are not stored at Directorate level apart from summary

reports on number of Beneficiaries

Ministry of Education-SESP SESP program has a digital database of beneficiaries but it is maintained by a

private firm at their premises.

Though they have a database maintained by the private, they do not have a

proper MIS which can be used at the Directorate, therefore data cannot be

accessed by the Directorate online.

SESP program depend entirely on the private firm on access of data like for

every payment cycle they depend on payrolls generated by the firm before

sharing with Dutch Bangla Bank.

Ministry of Primary and Mass

Education-PESP

PESP around 1 crore data is digitized but currently stored and maintained by

SureCash vendors of Rupali Bank.

The Directorate does not keep any copy of the database even though it is

mentioned in the contract signed between Rupali Bank and MoPME that they

should own a backup of the database.

Ministry of Disaster

Management and Relief-EGPP

EGPP data has been digitized and stored at BCC

The program also has a very well design and functional MIS

The MIS is to be upgraded by March 2018 from using Microsoft SQL Server

database to Oracle database and other schemes of the Directorate included.

Ministry of Women and

Children Affairs-LMA

LMA data has not been digitised and is currently stored on paper forms.

Ministry of Social Welfare-

Disability Allowance and

Widows Allowance

Data for Disability Allowance and Widows Allowance are being digitised using

the DSS MIS.

The digitised data of the two schemes are hosted in the DSS MIS which also

keeps the OAA data.

The design of SPBMU MIS Linkage to the Line Ministries was based on recommendations made after the

assessment of the digitisation status of the schemes.

Page 12: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

The recommendations are outline in the Table below:

Ministry and scheme Recommendations Remarks

Ministry of Health-DSF In order to link this scheme to the SPBMU MIS the Ministry will be

required to digitise the current DSF data and build a MIS for

maintaining the data.

It was not therefore feasible to digitise the data for DSF and

develop the MIS within the extension period which ends in June

2018.

Linking not

feasible.

Ministry of Education-

SESP

It was recommended that for linking of SESP with SPBMU MIS, the

database of SESP which is currently hosted by the private firm

should be migrated to BCC to ensure full ownership of the

database by the Directorate. SPFMSP Project will provide the

technical assistance during the migration process.

SPFMSP will also help Directorate and SESP develop a MIS that will

enable them to perform continuous update of the database.

To be linked

depending on the

completion of

recommended

activities

Ministry of Primary and

Mass Education-PESP

SPFMSP has advised the Directorate to have full ownership of the

database by either migrating the database from SureCash servers

to BCC or request Rupali Bank to create a backup copy of the

database which can be updated automatically.

After migrating the database to BCC or creating the backup copy,

the SPFMSP Project will link the PESP database and MIS to SPBMU

MIS.

To be linked

depending on the

completion of

recommended

activities

Ministry of Disaster

Management and Relief-

EGPP

Linking of EGPP certainly be done since the database and MIS

already hosted in BCC.

To be linked

Ministry of Women and

Children Affairs-LMA

Since MA MIS has already been developed and the fact that LMA

processes are almost similar to MA, the recommendation is to

modify the existing MA MIS so that it can be used to capture data

for LMA.

After modifying the MA MIS, LMA scheme data can be digitised

and thereafter linked with SPBMU MIS with minimum changes.

To be linked after

modification

Ministry of Social

Welfare-Disability

Allowance and Widows

Allowance

Since the digitisation of these two schemes is in progress using the

DSS MIS, linking them to SPBMU MIS is feasible.

The recommendation is to link the two schemes in order to achieve

Value for Money.

To be linked

Based on the assessment and the recommendations, SPFMSP Project completed broad designing of linkages

(Annex 5) of SPBMU MIS to 6 new schemes of 5 Line Ministries. By the end of June 2018 the project anticipates

to have a total of 8 schemes (6 new +2 done earlier) linked with SPBMU MIS.

4.1.4 Furthering MIS development in areas such as payment system, linkage with iBAS++ etc.

On the other front, the project has managed to collect all the requirements on linkage between SPBMU MIS and

Integrated Budget and Accounting System (iBAS++) which is needed for the piloting of the proposed payment

system. These have been documented by the contracted firm ISTL and will be presented in the Software

Requirements Specification (SRS) document in the second quarter. The SRS document contains detailed design

Page 13: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

of the SPBMU MIS linkage and further development and will be used as the guiding document during the MIS

development phase which will start in the second quarter.

On the other front, the project has managed to collect all the requirements on linkage between SPBMU MIS and

Integrated Budget and Accounting System (iBAS++) which is needed for the piloting of the proposed payment

system. These have been documented and will be presented in the Software Requirements Specification (SRS)

document in the second quarter. The SRS document contains detailed design of the SPBMU MIS linkage and

further development and will be used as the guiding document during the MIS development phase which will

start in the second quarter.

The project developed TORs for SPBMU MIS development work and used it to contract software development

firms in November 2017 following the processes proposed by MSP and agreed to by DFID. The contracted firms

were involved in the successful development of SPBMU MIS during the first phase of the project and were

separately contracted in the extension phase to work on SPBMU MIS linkage, further development of SPBMU

MIS and modification of already existing MoWCA MA MIS to incorporate the features for handling digitisation

of Lactating Mothers Allowance data as recommended in the assessment report.

Inception Report of MIS Development Firms

SPBMU MIS Inception reports prepared by the two firms were submitted as scheduled in the contract on the 19 th

of December 2017. This was the first deliverable in the contract signed between the firms and MSP.

The reports provide detailed account of how the proposed MIS activities will be undertaken as summarised

below:

PROPOSED METHODOLOGY: This provides an overview of the solution including scope of work and the

architectural overview of the system.

PROJECT PLAN: Includes the work breakdown of the project in terms of different tasks and milestones,

weekly milestones deliverable list and an activity-by-activity project plan including the time needed

for each of the activities.

RISK MANAGEMENT AND QUALITY ASSURANCE: includes the risk management procedure that needs to

be in place for a successful implementation of the project, since global statistics show two thirds of all

software projects fails, risk management is the single most important factor to consider.

PROJECT TEAM: Shows the positions of the team members, their organisation within the project

development and support team, with suitable range of skills and experience to successfully deliver all

the MIS Development project objectives.

TECHNICAL PLATFORM: includes a comprehensive list of the key tools and technologies for frontend,

backend and business logic- stating from system analysis and design to the end of operational and

acceptance testing, deployment and project handover.

Training of SPBMU MIS Staff

The two programmers of SPBMU MIS and the maintenance engineer have been attending Java programming and

Linux Operating System courses from the last quarter. These courses will provide the SPBMU MIS officers with

the necessary skills for maintaining the SPBMU MIS even after the end of the SPFMSP project.

Page 14: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

4.2 Costed plans for SP reform developed

4.2.1 Developing Costed Reform Plan-3 (VGD/ OAA)

As a backdrop to developing the reform, two diagnostic studies on the Old Age Allowance (OAA) and Husband

Deserted and Destitute Women and Widow’s Allowance (HDDWW) were performed as part of these efforts.

Findings of the study were discussed in a dissemination workshop and recommendations were agreed upon. It

was also agreed upon that a costed reform plan be developed so that the recommendations could be

implemented by the Ministry. The quarter in review witnessed the start of the third reform plan on Old Age

Allowance (OAA) and Husband Deserted Destitute Women and Widow Allowance (HDDWWA) Program.

The project designed the ToR for developing the reform plan and discussed this with the Ministry of Social

Welfare (MoSW) for their agreement. Based on the agreed ToR, one International and one National consultant

were hired for developing the reform plan.

The objective of developing the reform plan was to provide the contours of an improved programme in terms of

economy, efficiency, effectiveness and work out an implementation blueprint for the proposed reform

programme on OAA and HDDWWA based on the agreed / recommended design, product features, processes,

improved payment system, implementation arrangements, monitoring, MIS etc. The plan will provide an

estimated additional cost needed for implementing the reform and assess the capacity requirement of the

government agencies as well as an assessment of IT infrastructure that would be needed for implementing the

proposed reform plan.

Based on the timelines of the reform plan, the study was initiated in November 2017 and a draft reform plan

was submitted by the consultants in December, 2017. However, the draft has been reviewed by the project and is

likely to be submitted to the DFID by first week of January, 20181. Going forward, the final draft report on

developing the costed reform plans for the two schemes shall be submitted by early February, 2018. This shall be

followed by a dissemination workshop with all relevant stakeholders and a final report is expected to be

submitted to the DFID by end of February, 2018.

The fourth and final reform plan is likely to be developed for the MoWCA’s program on Vulnerable Group

Development (VGD). The project has already identified the team of consultants during the quarter in review and

has drafted the Terms of Reference for the study. The ToR shall be discussed and agreed upon with the MoWCA

and the team of consultants is expected to start the study by end of January 2018.

1 The same was subsequently submitted to the DFID on January, 8th, 2018.

Page 15: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Status of Diagnostic and Reform Plans

Sector Name of

Scheme

Name of

Line

Ministry

Diagnostic

Study

Current

Status

Reform Plan

Status of

TOR

Agreement

by LM

Current Status of

Reform Plan Remarks

Vu

lner

abilit

y Sec

tor VGD MOWCA Completed

and

Submitted

to DFID

ToR

Prepared. To

be Discussed

with MoWCA

Consultants and ToR

in Place. Reform Yet

to Start

(Likely Start –

January 2018)

Likely Completion

April 2018

VGF MODMR Completed NA NA No Further Action

Required

Hea

lth

Sec

tor

DSF-

MHVS

MOHFW Completed

and

Submitted

to DFID

NA NA MoHFW Adopted

Recommendations

from Diagnostic

MA /

LMA

MOWCA Completed

and

Submitted

to DFID

Agreed Completed and

Submitted to DFID

MoWCA in Process of

Implementing

Reforms

Saf

ety

Net

Sec

tor

OAA MOSW Completed

and

Submitted

to DFID

Agreed

Draft Report to be

Submitted to DFID

in First Week of

January 2018

Likely Completion by

March 2018 HDDWA MOSW

Edu

cati

on

Sec

tor

PESP MOPME Completed

and

Submitted

to DFID

NA NA Meeting between FD

and MoPME to take it

further

Paym

ent

Sys

tem

NA

NA

(initiative

of FD)

Research

Study

Completed

and

Submitted

to DFID

Agreed with

FD

Completed and

Submitted to DFID

Assisting FD and

other LMs in Piloting

the Payment System

4.2.3 Supporting FD and other Line Ministries in implementing already designed reform plan on Payment

Systems (including piloting of the plan in 2 SP schemes)

The project is in the process of supporting the FD and two other line ministries, namely MoWCA and MoSW in

piloting the payment system in few Upazila. Preliminary meetings on piloting payment system has already taken

place at the project involving the SPBMU and the FD. One meeting at the Secretary and DG level was held at the

Finance Division which was headed by the Secretary, Finance Division and attended by the Secretary as well as

the Director General, MoSW and other senior officials.

As part of the support to the MoSW, one round of Training and other Capacity Development was held at the

project office for the DSS Officials who are currently in the process of piloting the payment system under an

agreement with the a2i of the Prime Minister’s Office.

Page 16: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

4.2.4 Supporting FD and relevant Line Ministries in implementing already developed reform plan-2 on health

cluster schemes (MA, LMA and DSF-MHVS)

The FD is likely to convene meeting with the MoWCA in order to take stock of the current situation. Meanwhile,

based on the recommendations of the reform plans developed by the project, the MoWCA has requisitioned for

additional funding in their budgetary support for 2018–19 which the FD is likely to agree.

Page 17: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Annex 1

Work plan for the period September 1, 2017 – June 30, 2018

LogFrame Outcome: The Government of Bangladesh has established a more effective and efficient Social Protection

system, including policies, budget and plans.

Year 2017 2018

Month Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Output and Activities

LogFrame Output 1: Improved mechanisms within SP sector of GoB.

1.1: A fully functional Social Protection Budget Management Unit (SPBMU) at the Finance Division (FD)

1.1.1 Integrating

SPBMU into the regular

setup of FD with

defined roles &

responsibilities and its

expenditure is included

in GoB revenue budget

September October November December January February March April May June

1.1.2 Implementation

of SPBMU

communications

strategy

September October November December

LogFrame Output 2: Improved GoB capacity to manage, implement and monitor social protection programmes

2.1: Institutalisation of SP-PFM courses in selected training institutes and trainers trained

2.1.1 Strengthening of

selected departmental

training institutes by

integrating SP Public

Financial Management

courses in their regular

training program

September October November December January February March April May

2.1.2 Training of

Trainers through

National/Global courses

September October November December January February March April May

LogFrame Output 3: Ministries and Departments of the Government of Bangladesh have access to a strengthened

evidence base on social protection

3.1: Diagnostic studies on 7 SP schemes under taken

3.1.1 Conducting

diagnostic study on

stipend programs

including Disability

stipend (as the 7th

scheme):

September October November December

LogFrame Output 4: Mechanisms in place that contribute to better targeting and monitoring in SP schemes

Output 4.1: A fully functional MIS at the SPBMU linked with 6 LMs to improve targeting of programmes, timely delivery

of transfers and monitoring of SP expenditure

4.1.1 Designing of

linkages between September October November

Page 18: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

SPBMU MIS and 6 Line

Ministries

4.1.2 Establishing

linkages between

SPBMU MIS and 6 Line

Ministries

December January February March April May

4.1.3 Developing plans

for SPBMU MIS roll out

to other ministries

May June

4.1.4 Furthering MIS

development in areas

such as payment

system, linkage with

iBAS++ etc.

September October November December January February March April May June

4.1.4 Training on

further SPBMU MIS

development and on

SPBMU MIS linkage

with Line Ministries

January February March April May

Output 4.2 Costed plans for SP reform developed

4.2.1 Developing

Costed Reform Plan-3

(VGD/ OAA)

September October November December

4.2.2 Developing

Costed Reform Plan-4

(VGD/ OAA)

January February March April

4.2.3 Supporting FD

and other Line

Ministries in

implementing already

designed reform plan

on Payment Systems

(including piloting of

the plan in 2 SP

schemes)

September October November December January February March April May June

4.2.4 Supporting FD

and relevant Line

Ministries in

implementing already

developed reform plan-

2 on health cluster

schemes (MA, LMA and

DSF-MHVS)

September October November December

4.2.5 Training on

reformed payment

system through

National courses

November December January February March April May

4.2.6 Training on

implementation of

reform plans 2, 3 and 4

through National

courses

November December January February March April May

Page 19: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Annex 2

Page 20: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 21: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 22: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 23: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 24: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Annex 3

Page 25: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Annex 4

Page 26: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 27: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 28: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 29: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 30: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All

Annex 5

Page 31: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 32: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 33: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 34: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 35: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 36: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 37: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 38: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 39: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 40: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All
Page 41: Strengthening Public Financial Management for Social ...spfmsp.org › wp-content › uploads › 2018 › 04 › SPFMSP... · Progress has been made in all major work streams. All