Please insert your Company Logo here, using the Slide master •Concerns / Issues Needing Attention Preliminary Objectives Current Situation & Target To reduce FP testing time in MMF from current avg of 6.89 days to 5 days Company Name: BIOCON LTD Gemba: QUALITY CONTROL-BIOCON CAMPUS GKW Dates: 5 th Nov TO 6th September Project Title: Streamline testing and release for MMF There is variation in FP test times from 3 days to 9 days Consumption of chemical Man power under training Team Name:Immuno Members: (L-R) Applachari,Praveen,Sunil,Vijay and Babu A P D C Month B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B 10 B 11 B 12 B 13 B 14 B 1 B 2 B 3 B 4 5 B 6 B 7 B8 B9 B 10 B 11 B12 B 13 B 14 B 15 B 16 B1 7 B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B 10 B 11 B 12 B 13 B 14 4 7 3 4 4 4 3 4 4 2 3 2 2 4 3 4 4 3 5 4 4 5 5 3 2 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 G ood Gebm a QC -IS Lab Objective Testcom pletion days O w ner Vijay Target 5 days KA IZE N PR OGRESS R EVIEW June-A ugust2013 Location C am pus Biocon-G em ba S ource ofD ata Frequency ofupdation E ach batch 0 1 2 3 4 5 6 7 8 B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14 B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14 Batchesw ith in target 1. Background & Targets
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Please insert your CompanyLogo here, using the Slide master
•Concerns / Issues Needing Attention
•Preliminary Objectives
Current Situation & Target
To reduce FP testing time in MMF from current avg of 6.89 days to 5 days
Company Name:
BIOCON LTD
Gemba:
QUALITY CONTROL-BIOCON CAMPUS
GKW Dates:
5th Nov TO 6th September
Project Title: Streamline testing and release for MMF
There is variation in FP test times from 3 days to 9 days
Consumption of chemical
Man power under training
Team Name:ImmunoMembers: (L-R) Applachari,Praveen,Sunil,Vijay and Babu
A
P
D
C
Month
B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14 B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14 B15 B16B17
B 1 B 2 B 3 B 4 B 5 B 6 B 7 B8 B9 B10 B11 B12 B13 B14