Strategic Planning - 2020 Facilities, Planning & Operations N Concept 5. University Peace Garden 7. Science Hall Plaza Renovation 8. Wilson Hall Rear Patio Enhancement 9. Parking Lot Screening 10. Building Service and Storage reorganization 11. Student Center Front Patio Renovation 12. University Board Walk 13. Art Alley Exhibit & Rec Space 14. Abbotts Pond Overlook Feasibility 16. Pfleeger Hall North Parking & Access/Circulation Enhancement 17. Savits Hall Garden Enhancements 18. Engineering parking Lot Removal & Relocation 19. Site for future Development @ Science Hall 20. Science Hall Stormwater Management and Outdoor Classroom 21. Meditation Garden 24. Bunce Hall Addition 25. Hollybush Mansion Rehabilitation 26. 322 Side Walk Addition Recently Completed Projects 43. Linden Site Parking Lot 44. Pet Therapy Facility 45. Tony Lisa Natatorium 61. Rowan SOM Master Planning (Stratford) 64. Inspira Health Network at Rowan (West Campus) 65. RowanCollege Engineering Building 66. Rohrer College of Business Building 67. Holly Pointe Commons 68. University Vista 69. Wilson Plaza 70. Soccer Fields Turf and Upgrades 71. The Crossroads at Robinson Green 72. University Seasonal Amphitheater & Wetland 73. University Monumental Signs a. Rt. 322/ College of Business b. Holly Pointe Commons c. Bowe Blvd./Rowan College of Engineering d. Bowe Blvd & Carpenter St. 74. Savits Hall Accessibility 75. Memorial Stormwater Management 76. University Ceremonial Archway 77. Presidential Rose Garden 78. South Campus Gazebo Landscape 79. Mimosa Courtyard Restoration 80. Oak & Laurel Courtyard Stormwater Management 81. West Campus Athletic Fields (West Campus) 82. Camden Bank Building Renovation (Camden) 83. 301 High St Art Gallery 84. Rowan CREATEs (West Campus) 85. Rowan Boulevard A1-4 86. North Campus Parking Lots 87. Westby Courtyard 88. Intramural Fields Turf & upgrades 89. Westby Hall façade Upgrades Design & Construction 6. 322 West Parking Lot V 15. Triad Repurposing - Sophomore Village 22. Recreation Center Stormwater Management & Enhancement 23. North Residence Halls Adaptive Reuse & Development 27. Wilson Hall Addition 28. Student Center Agora 29. New Academic Building “Discovery Hall” 30. Stormwater Managment Phase II: a. Chestnut Creek Restoration Phase II b. Meditation Walk Phase II c. Student Center Plaza Renovation 31. Rt. 322 Pedestrian Enhancements 32. Rowan Hall Renovation 33. New Academic Building CHSS 34. Bunce Hall Rehabilitation & Repurposing 35. Bole Hall Repurposing 37. Oak & Laurel Repurposing 38. Cassady Gateway/Arch 39. Cassady Site Use Study Predevelopment Opportunity 40. 322 Closer & Pedestrian Corridor/Quad 41. Hawthorn Hall Rehabilitation 42. Rowan Woods Enhancement 58. Freshman Village Other Projects - Satellite Campuses 59. Jean & Ric Edelman Fossil Park Development (Sewell) 60. SOM White Horse Pike Access Road (Stratford) 62. Joint Health Science Building (Camden) 63. Cooper Medical School Parking Garage (Camden) Building KEY: Masterplanning Planning 1. Greenway Masterplan 2. Facilities Masterplan Update 3. Sustainability Masterplan 4. Parking Upgrade NORTH CAMPUS SOUTH CAMPUS 22 5 6 7 8 9 9 10 11 12 13 15 16 17 18 19 21 23 24 25 14 26 27 29 30A 30B 30C 32 31 34 35 37 38 39 40 41 42 44 45 33 40 updated February 27, 2020 28 58 89 43