STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program
26

STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Dec 21, 2015

Download

Documents

Andrew Webb
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

STORMWATER PERMITTING UNRAVELED

NCMA Water Quality WorkshopFeb 19, 2015, Raleigh, NC

Bethany Georgoulias, Stormwater Permitting Program

Page 2: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Outline

Overview of Stormwater Permitting Programs

NPDES Stormwater Permitting Stormwater Pollution Prevention Plans Benchmark Concentrations Tier Responses to Benchmark

Exceedances Permitting Construction Activity

Page 3: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Stormwater Permitting Programs Federal NPDES Stormwater Program

Phase I Phase II

State Stormwater Programs Phase II Post-Construction (Session Law 2006-

246) Coastal Stormwater (Session Law 2008-211) High Quality Waters / Outstanding Resource

Waters Water Supply Watershed Nutrient Sensitive Waters Special Management Strategies (e.g., Goose

Creek) 401 Water Quality Certifications

Page 4: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

STORMWATER POLLUTION PREVENTION PLANS

NPDES Stormwater Program

Photo from Ohio EPA

Page 5: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Federal NPDES SW Program

Industrial activities in 10 categories Municipal separate storm sewer systems

(MS4s) serving >100,000 population Construction activities disturbing > 1

acre (Phase II lowered threshold from 5 acres)

Smaller MS4s (Phase II)

Photo by DLRPhoto by DWR

Photo by DWR

Most NPDES SW permits require an

SPPP

Page 6: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Stormwater Pollution Prevention Plans

SPPP Requires: Site Plan (location map; facility map; storage practices;

significant spills; certify no non-stormwater discharges). Stormwater Management Strategy (feasibility study;

secondary containment records; BMP summary) Spill Prevention and Response Procedures (not just

SPCC) Solvent Management Plan (some permits) Preventative Maintenance/Good Housekeeping

Program Employee Training (at least annually) Facility inspections (site & SW systems, semi-annually) Responsible Party Annual (at least) SPPP update. Every Year! (list of

spills, BMP evaluation, re-certify whether outfalls have non-stormwater discharges, review year’s analytical data, etc.)

Page 7: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Purpose of an SPPP

Identify pollutant sources to stormwater Identify best management practices

(BMPs) that reduce or eliminate potential water quality impacts

Implement those BMPs (not just a paperwork exercise)

Vigilance of how activities might impact stormwater; look out for problems

Identify improvement opportunities Understand where your stormwater goes

PROACTIVE INSTEAD OF REACTIVE

Page 8: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Beauty of the SPPP

Page 9: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

SPPP Flexibility

If drainage areas, outfalls, or monitoring change, change the SPPP – no need to modify the permit.

If a new BMP needs to be installed, revise the SPPP –no need to modify the permit (approval of BMP might be required under State Stormwater or a local program, if post-construction related).

If the waterbody becomes listed as impaired or a Total Maximum Daily Load (TMDL) is established, change the site map – no need to modify the permit.

If the regional office requires actions (e.g., Tier responses), retain the correspondence in the SPPP – no need to modify the permit.

Page 10: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

SPPP Enforcement

Enforcement responsibility on two parties: The PERMITTEE and PERMITTING AUTHORITY

Take SPPP off the shelf and use it (instead of collecting dust until a surprise inspection). Implementation is a permit requirement.

UPDATE IT at least annually. Meaningfully. Train employees regularly; continuity even in

turnover. Keep records together so they’re easy to get to

(monitoring, responses, training, etc.) DEMLR works with permittees to improve short

falls in SPPP implementation.

Page 11: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

STORMWATER MONITORING AND BENCHMARKS

NDPES Stormwater Program

Photo by DWR

Page 12: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Stormwater Discharge Monitoring

Qualitative/Visual and Analytical Monitoring

Benchmark values guide analytical monitoring

Tiered Response to Benchmark Exceedances

Tier 1 – identify

potential cause and

take action, document

Tier 2 – monthly monitoring until 3

samples below benchmark, Tier 1 actions

First exceedance 2 exceedances in a row

“Tier 3” – Must notify DEMLR, who may revise monitoring, require certain

BMPs, or other actions

Any 4 exceedances

Page 13: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

What Are Stormwater Benchmarks?

Benchmarks are NOT effluent LIMITS.

“Action level” concentrations that trigger investigation and management actions.

Generally based on aquatic impacts.

Tool for the permittee to respond to possible stormwater exposure problems.

Tool for DEMLR to identify recurrent problems or assist permittee in correcting.

Page 14: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Stormwater Benchmarks

Page 15: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

FAQs About Benchmarks

Q: How are SW benchmarks derived?

A: Typically reflect level of protection for acute (short-term) exposure (e.g., metals, toxicants). This is usually ½ FAV.

A: May be based on other criteria, regulations or data sources (e.g., TSS, BOD5) when no acute equivalent.

Page 16: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

FAQs About Benchmarks

Q: Why are some values so much lower than the drinking water standard (like copper)? Isn’t that unreasonable for stormwater runoff?

A: it’s not all about people.

Page 17: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

FAQs About Benchmarks

Q: What happens when I get into “Tier 3” because I can’t get a concentration below a benchmark?

A: It depends.

Photo from http://kaelepulupond.org/

What if this site is next door, running onto your facility?

What if you haven’t done anything about this?

Photo from http://www.co.contra-costa.ca.us/

Page 18: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Metals Benchmarks Update

Triennial Review revised NC metals standards

New standards include dissolved metals and revise hardness assumption (no longer 50 mg/l)

DWR implements method to translate dissolved to total concentrations for NPDES permitting

Stormwater Program adopted consistent approach for metal benchmarks

Permits issued since January 2014 include new benchmarks; other permits are being revised upon renewal

Page 19: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

New Freshwater Metal Benchmarks

Cr III new

Previous

Page 20: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

What Happens in Tier 3?

Facility monitoring data exceeded benchmark any four times and must notify Regional Office

DEMLR wants an understanding of what permittee has already done to investigate sources, alleviate sources, considered feasibility of implementing, etc.

RO will visit and help assess RO will respond with further direction.

Until then, permittee continues monthly monitoring.

Page 21: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Addressing Exceedances

Page 22: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Working with Permittee

Page 23: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

CONSTRUCTION ACTIVITY AT INDUSTRIAL FACILITIES

NPDES Stormwater Program

Photo by DWR

Page 24: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

Construction Stormwater

When is it needed? Construction will disturb an acre or more Project needs E&SC Plan approval by local or state

program Do you need to submit a Notice of Intent (NOI)?

No, automatic coverage upon E&SC approval Can I skip getting an NCG01 if I already have a

different NPDES stormwater permit for my industrial activity? No, both permits apply. That’s IN ADDITION to the E&SC Plan requirements.

NCG01 covers discharges from construction only.

Page 25: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

http://portal.ncdenr.org/web/lr/construction-stormwater

Page 26: STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.

QUESTIONS?

http://portal.ncdenr.org/web/lr/stormwater

Stormwater Permitting Program

Telephone: (919) 707-9220