Top Banner
Rehabilitation of the Liberia Refinery Company EIA Proposed recommendation Environmental Impact Assessment for the Proposed/approved rehabilitation of the LPRC. July 2015
42

storage tanks

Apr 15, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: storage tanks

Rehabilitation of the Liberia Refinery Company

EIA

Proposed recommendation

Environmental Impact Assessment for the

Proposed/approved rehabilitation of the LPRC.

July 2015

Page 2: storage tanks

RECOMMENDED REPORT

Prepared by: ANSUMANA E.M. DUKULY, JR.

1.1 INTRODUCTION

Page 3: storage tanks

The primary petroleum product storage tanks area in Liberia is the Liberia Petroleum Refinery

Company. This area is located in the southcenterrnmost part of the west of Monrovia, specifically

Bushrod Island. The Liberia Refinery Company stretches from NPA of Liberia and as far as to Clara

town, in the West. Although varying in width, it is approximately 3.2 km wide, extending in some

areas into the National Port Authority (NPA). The Government of Liberia (GoL) has divided the

Freeport of Monrovia (NPA) into three PST areas. Liberia Petroleum Refinery Company is located

towards the west extremity of the NPA and is covered by LPRC and SRIMEX & ECOFUEL joint

venture. LPRC holds interests in developing and expanding the PST.

Page 4: storage tanks

1.2 APPROACH AND METHODOLOGY

The purpose of the EIA is to provide relevant, understandable and objective information to

inform decisions regarding the authorization and expansion of the Rehabilitation of the

Liberia Refinery Company EIA (RELPRC) in Monrovia, Liberia.

This EIA consists of the following four phases:

Screening;

Scoping;

Specialist Studies; and Integration and Assessment.

Screening

Based on limited capacities the initial screening phase identified that a full EIA was

required as petroleum facilities engineering and production have classified as a Category III

activity in terms of the Environmental Impact Assessment Regulations (1998) promulgated

under the National Environment Act of 2003 which was amended in 2010 of Liberia.

Scoping

The second phase of the EIA process was Scoping. The objectives of Scoping were the

following:

1. to identify issues of serious environmental concern;

2. ensure all potential impacts, key issues and reasonable alternatives are identified; and

3. Ensure informed, transparent and accountable decision-making by the Environment

Protection Agency/Authority (EPA).

As part of the scoping phase, a consultation process was conducted manually with an

opportunity to raise concerns and comment on the potential impacts and merits of RELPRC

development. Input was captured in order to focus the assessment on key concerns, and to

better understand expectations of those potentially affected. Figure 1.2 identifies the key

identified during consultation.

Page 5: storage tanks

Figure 1.2 Key Stakeholder Groups

Project participants (Liberia Petroleum and Refinery Company management and

employees)

Local community members

Vulnerable groups (e.g. general residents)

Local businesses around the LPRC’s Facility

National and level authority especially EPA with references from their achieves

Locals and

Local environment and social NGOs Media groups

A range of issues were raised during consultation. The main issues include the following:

Present Site location and its environmental effects – Some business people and locals

around LPRC mentioned that site alternatives needed to clearly outline both the positive

and negative impacts of the RELPRC. Numerous locals including LPRC’s employees

indicated their preference for the RELPRC to be located outside Bushrod Island because of

serious environmental issues raised as will be explained later.

Awareness Raising and Community Liaison - Many locals and national agencies feel that

LPRC should play a more active role in raising awareness about the project specifically and

oil storage tanks in general and especially for example the Ganta Storage Tank Terminal.

Locals and residents here had been confused because of a number of misperceptions

amongst them that could easily have been clarified if LPRC has had the time to adequately

inform locals especially in nimba and had a proactive community liaison strategy. As the

stakeholders in nimba have requested that LPRC improve their community liaison

capabilities not withstanding this has some political configuration and lobbying effects.

Page 6: storage tanks

Fish and Fishing – The majority of fishermen around Du River, especially West Point

raised concerns about the impact on the numbers of fish during and since the operation

phase of LPR C commenced. The impact of the current ban on night fishing was also

raised as a concern since it was felt that it may have severe consequences on the local

fishing economy and affect peoples’ income and livelihoods

.

Waste Management -A number of serious observations were made in LPRC’s Tanks Farm

and the kind of waste that the RELPRC is going to generate and how that waste was going

to be handled or disposed is of major environmental concern. LPRC, beyond all

environmental reasons is one of the most polluters of the city as far as environmental

analyses are concern.

Oil Spills and leakages – resident will want to know if LPRC had any management measures

in place that would address clean-ups of oil spills. The impact of oil spills on fish stocks

and water resources was also a significant concern to local stakeholders.

Air Quality – locals and employees are extremely concerned about the impact of the RELPRC

and the aftermath especially operational periods on air quality, during

flaring/flushing/dewatering of tanks. Employees and locals also wanted to know what

measures RELPRC would put in place to mitigate air pollution and greenhouse gases.

Flushing and dewatering - Given the sensitivity of the environment in the project area and the dry

conditions during half of the year, locals were concerned about the risks of fire and potentially

other risks associated with Flushing and dewatering that could threaten the environment.

Community benefits – An overwhelming number of residents expressed the view that the project

should ensure that the local people experience social transformation and that they must directly

benefit from the project. For example many of the locals were anticipating electricity provision

to the whole of Bushrod Island since the hydropower is not operational.

Page 7: storage tanks

Other issues raised included issues surrounding: project life span, the need for a Strategic

Environmental Assessment, community benefits, security and conflict, and perceptions of

corruption (everyone’s concern).

Other issues raised included issues surrounding: project life span, the need for a Strategic

Environmental Assessment, community benefits, security and conflict, and perceptions of

corruption (everyone’s concern).

Specialist Studies

Specialist studies included baseline information gathering relating to the affected environment

and an assessment of the impacts associated with the proposed development. In support of the

EIA, the following specialist studies were undertaken:

Visual;

Air quality;

Waste management;

Ground and surface water;

Flora and fauna; and

Socio-economic

Integration and Assessment

A synthesis of the baseline information and impact assessment undertaken, which addresses the

key issues identified during the scoping process, is integrated into the Environmental Impact

Statement. Potential impacts are assessed according to predefined assessment criteria and

mitigation measures developed for the impacts.

Page 8: storage tanks

1.3 LEGAL AND POLICY FRAMEWORK

Liberia has a wide array of legislation that promotes the protection of the environment. A number of

Policies, Acts and Regulations were taken into account during the EIA process though the EPA,

implementer arm of the processes is weak.

An Environmental Impact Study (EIS) has been compiled as part of the EIA process in accordance with

the regulatory requirements stipulated in the EIA

Regulations, 2003 promulgated under the National Environment Act of 2010.

1.4 PROJECT DESCRIPTION

Rehabilitation and Expansion of Liberia Petroleum Refinery Company; Product Storage Terminal

(RELPRC/PST) will consist of the following:

Supply Pipelines from the Jetty to the tank farm three new pipelines (8, 10 and 12 inch diameter) are to

be installed along the onshore Jetty walkway to the product terminal replacing existing pipelines.

LPRC Product Storage Terminal is comprising two adjoining tank fields namely: Mobile and Texaco

with a total Storage capacity of 480 thousand barrels including 15 existing storage tanks:

a) Storage Tanks

The new storage tanks construction shall include shells, floors, roofs, foundations, access stairways,

railings and handrails, together with venting and gauging mechanisms.

b) Piping Network

The new piping network shall include valves, flanges, fittings and pipe support, designed to provide

full transfer flexibility from the pump station to each product storage tank and to the loading station.

Page 9: storage tanks

Loading Rack and Pumping

a) Tank truck loading

To undertake the complete redesign and build a new loading and pumping facilities with increased

loading capacity. To install top loading with provision for bottom loading. To include essential

components, including meters, loading arm, separators and filters. To install a new concrete pad for

the loading rack, accompany trenches to recover accidental spills.

b) Loading Arm Pumping Station

To install all loading and transfer pumps on one concrete pad large enough for future pumping

capacity, including additional pumps to meet projected demand.

Environmental Protection

a) Prevention actions

To provide environmental protection facilities and procedures to include the prevention and full

recovery of accidental spills and contaminated surface waters originating from the storage tank slab,

pump stations and truck loading areas, which have to be directed to an adequately- sized API oil

separator. To install floating pads on gasoline tanks to reduce air pollution, but also to reduce

gasoline tank breathing losses.

b) Remediation

To conduct an environmental audit to establish the nature and the extent of soil and /or water

contamination and identify the extent of remediation required.

Fire Protection

a) A totally new Fire Water distribution network has to be devised and installed

b) Install all new foam making equipment (chambers)

Power Generation

The contractor shall carried out a thorough and full assessment of the existing electric system and

will provide a report in the context of immediate modifications which may be required for adaption

with the PST project and to install new power generation system to meet demand.

Page 10: storage tanks

Security

To install adequate security lighting, strategically located inside and around the Tank field perimeter

of meters and along the shore supply pipelines

Safety

To verify and correct non conformities in the actual layout of Tanks within the terminal, taking into

consideration specified regulatory safe distances between tanks as per their respective dimensions,

distances loading racks and property limits, public roads, fire protection equipment, laboratory,

railroads, together with adjacent lodgings and office buildings, all according to applicable local or

international regulations

CRITIQUE OF THE PROJECT FLOW

A) Storage Tanks

If we looked at the general integrity of all the tanks owned by LPRC, it seems pretty well stable to cut

down costs attached. However, there is going to be some technical demands well certain from the

engineering team of LPRC. INTEGRITY of tanks one (1), three (3), five (5), six (6), seven (7), eight

(8), four hundred and three (403), four hundred and four (404), four hundred and seven (407), and

finally four hundred and eight (408) worth a lot to explain.

As a result of serious environmental hazards resulting from reservoir failures there is need to carryout

Periodic monitoring of the reservoir. Above surface vertical cylindrical reservoir used in Oil and gas

industries are constructed of steel and over the years many of the structures have corroded and leaked

petroleum products into the soils thus contaminating ground water and the environment.

Leaking reservoir can be a source of groundwater problem as the petroleum which they carry contains

toxic compounds including benzene, toluene, xylene and ethylene dibromide. These compounds are

thought to cause cancer, and pose a number of health risks including nervous system damage,

reproductive problem and immune system depression. The soils and geological condition at the structure

locations can also affect ground water contamination.

Page 11: storage tanks

OIL STORAGE TANKS AT THE LPRC TERMINAL

Reservoirs/tanks at the LPRC terminal were constructed between 1956 and 1970s. There are at the

Moment 15 oil storage reservoir, the shortest in height is around approximately 13m in height and

diameter 36.5m while longest is 17.1m in height 31m in diameter.

The structural integrity of these reservoirs/tanks has been of major concern to both local community and

Environmentalists. Although API Standards have not remained the industry standard relative to reservoir

inspection and maintenance, the frequency of testing and inspection can also be affected by various state

and local regulations.

The schedule of this inspection process depend on a number of factors which include: the age, their

Proximity to groundwater, the leak records, the date of the last integrity test, the construction material

used, the product stored, soil condition etc.

Reservoir at LPRC farm is half way bounded with a bound walls which measuring 250m by 150m and at

a height of 12m. The bound walls are to accommodate and contain any spill that may result from failure

of any of the reservoir.

STRUCTURAL HEALTH MONITORING

Reservoir/tanks used by oil LPRC are cylindrical in shape. As a result of age, non-uniform settlement of

the foundation, geological conditions loading and offloading, war, abandonment, negligent, non-

technical team over the years, oil temperature, primary and secondary settlement of sediments results in

radial deformation or out of roundness of the reservoir. This results in the binding of the floating roof or

in cone-roof tanks displacement. Out of roundness may result in the upper shell course buckling. Shell

out of roundness may result in gaps between reservoir shell and their hydrocarbon emission into the

environment occurred. As a safety measure, each reservoir needs to be monitored periodically

TANK 1

This tank has a capacity of approximately 3400000 US Gallons, not neglecting other causes attached,

and based on the observation of the tank, it seems likely that this tank can be revamped using API 510

standards and it will maintain its stability status as before, hence bringing cost reduction (CAPEX), this

will be explained in subsequent paper presentations.

Page 12: storage tanks

It is advisable to use API 510 by removing the base-floor and adjusting the already tilted ankles and

circumference and or reassessing the tank before management final decisions are taken.

TANK 3

This tank has a capacity of approximately 2600000 US Gallons, the tanks has been quantified if not

replaced, however, based on best practices it seems not completed as sprinklers/terminal cooling system

are not yet up to date, but almost.

TANK 4

This tank has a capacity of approximately 2500000 US Gallons. The floating roof system is good and

based on standards many business people will want to go for it but when it comes to integrity and

stability, the cone roof or fixed roof is always better than it. Others might want to argue about product

losses etc. but no matter what however, no tank is “product lose free” therefore ten it is 100% advisable

to build fixed cone roof.

TANK 5

This tank has a capacity of approximately 1300000 US Gallons. Looking at the tank’s conditions, we

first assume that it is old or outdated, but this doesn’t mean that API 510 cannot be applied or

implemented. Please cut down cost and improve stability. The department of petroleum at LPRC will

give you much needed briefings.

TANKS 6, 7, 8,403,404,407,408

This tank has a capacity of approximately 1300000, 700000, 430000, 660000, 418000, 410000 US

Gallons respectively.

Similarly all other API applications and standards should be applied to avoid unnecessary wasteful costs

not neglecting API 510.

Page 13: storage tanks

PIPING SYSTEM

Installing an outer pipe around an inner pipe has been found to prevent the release of hazardous

liquids being transported in the inner pipe. This system as a whole is called a secondary contained

piping system, or double-walled pipe. A major use for these systems is for transporting liquid fuel,

“Liquid Fuel Storage and Dispensing Systems.” There are no generally recognized codes for

dimensions.

The interior pipe transporting the liquid is called the carrier or primary pipe. The outer pipe around

the carrier pipe is called the containment pipe or secondary containment. A detail of a typical double-

contained pipe is schematically an illustration to be done by LPRC’s Petroleum Engineers. The two

pipes are to be kept apart by spacers, these are often called frogs or spiders by manufacturers.

Double-wall systems are manufactured from many different piping materials. There is no requirement

for the primary and secondary pipe to be made of the same material, except where a possible

incompatibility may exist. the LPRC piping system is been one of the most vulnerable ever,

therefore, then it is highly recommended to consider all pipes being buried underground to control

fire security, spillages as well as environmental sensibility .

REMEDIATION AND SECURITY

Watering and water system will not be meant only for tanks, if we looked at the roofs of the pump

house, and the loading rack, you will understand that there is a need if not a serious one to cane the

roof as from zinc to clay, the distance of the loading rack should be at least 120 ft. away from offices,

a firefighting sprinkler should be installed within the roof of the loading racks as well as all offices

within the LPRC vicinity because wit fire nothing is ever safe, therefore safety first. The contingency

pipeline line, if it is meant for the future then should be halted and brought within the NPA fence

instead of its present location, because 15 to 25years from now the tiding will be different.

1.5 SITE SELECTION

As part of the EIA process, a site selection study was undertaken from June – July 2015 in

order to identify the most appropriate area for the RELPRC/PST. Hence the old site is

considered as fairly suitable but not advisable for the future because of cluster impedance and

Page 14: storage tanks

population of the environment as For oil escarpment, that could result in an unacceptable

environmental impact, RELPRC/PST would also result in an additional US$ 30 million capex

(capital expenditures) and US$ 3.3 million opex (operational expenditures) affecting the

financial viability of the Project summing up to $33.3 million tis estimate is an approximation

based on qualitative analyses (quick look). Tis estimate can be reduced to $12 million to $15

million if considerations are given to API 510

Based on such a result, LPRC’s preference will be considered for the following reasons:

Reduced capital expenditure (capex) and operational expenditure (opex) – this is seen as a

serious consideration affecting decision making with the members of the board, as the

additional costs associated would make the financial viability of the RELPRC/PST unfeasible;

Greater energy efficiency and hence lower fuel consumption;

Lower technical risk – e.g. no flow assurance or seismic damage risks associated with a

pipeline up the escarpment because the seismic zone in which Liberia falls is approximately 1

at the magnitude level; and

Lower security risk - security can be better controlled with numerous locations close to the

RELPRC/PST site, as such, Site formed the focus of the RELPRC/PST EIA.

1.6 Social

The population of the Bushrod Island is settled at 6 relatively small landing sites and 1 fishing

location at West Point along the shore. The overall population of the Island is relatively high

although it has increased with time as a result of the improved peace initiatives of the United

Nations and ECOWAS, the attraction of fishing and people coming to the West Point even

from neighboring in search of self-employment from Senegal and Ghana. There has been

considerable population growth over the past few years, with rapid growth expected to

continue.

Education levels are still very low in the republic, with respondents commenting that the value

of education is not fully understood. The population living in the island are predominantly

semi-illiterate, with literacy rates estimated to be approximately 40 percent and as low as 15

percent amongst the women. Poor education levels have also been attributed to parents taking

Page 15: storage tanks

their children out of school and in facts as a result of accelerated Ebola virus in the sub region

of Mano River, to assist with fishing and other household responsibilities. With these problems

prevailing every day, LPRC will need to provide more scholarships for students at all level

both international and national.

It was reported that the common diseases within the island include malaria (including cerebral

malaria), dysentery, diarrhea, cholera, sexually transmitted diseases (STDs), meningitis,

maternal mortality and anemia in children. Headaches and coughs were also reported to be a

persistent problem most of which are associated with pollution in other ways.

1.7 SUMMARY OF ACTUAL AND RESIDUAL IMPACTS

1.7.1 Nature of Impacts

A key element of ongoing environmental and socio-economic management is to address

uncertainty, through collecting information, additional assessment and, where necessary, the

development of further mitigation and management measures.

As the project moves forward and on-the-ground implementation confirms or puts in to

question the nature or extent of impacts discussed below, these will need to be addressed as

part of the ongoing updating and refining of the Environmental Management Plan (EMP).

It is vital to stress that the residual impact significance ratings provided in this

EIA are based on LPRC’s bending adherence to the mitigation measures (actions) and

ineffective implementation of the monitoring measures. Without this level of commitment from

LPRC, the residual impacts will be more significant than currently assessed.

Page 16: storage tanks

1.7.2 Summary of Actual and Residual Physical and Biological Environment

Impacts during Construction Phase

During the construction phase, only the impact on local fauna necessitates a medium negative

residual impact. Although the remaining physical impacts received a residual impact of either

low negative or negligible negative, the biggest impact will be on waste, spills, fauna and flora.

During the construction phase of the Project, the activities to be carried out will involve site

clearance for the separator of produced water and temporary and permanent accommodation

facilities, excavation of flow lines trenches, construction of roads in RELPRC/PST area etc.

This will entail flora clearance and thus disturbance of the local flora and fauna and potential

habitat degradation, destruction or fragmentation thus affecting biodiversity. The main habitat

to be impacted will be the snakes with a loss of approximately 0.08 percent of the entire

facility.

A summary of the physical and biological environment impacts including pre-mitigation and

residual impact during construction are summarized below in Table 1.1.

Table 1.1 Summary of Actual and Residual Physical and Biological Environment Impacts

During Construction

1.7.3 Summary of Actual and Residual Physical and Biological Environment

Impacts during Operation Phase

Although no impacts will be received as a residual impact rating of medium negative or higher

during the operation phase, some discussion on the impacts to air quality and flora is pertinent.

While the air quality dispersion modelling undertaken during the baseline studies provided a

worst case scenario and some uncertainties exist as a result of the lack of measured

meteorological data, exceedances in the NO2 1-hour WHO ambient air quality guideline in the

Bushrod Island are predicted. While these exceedances are unlikely to have any health impact

Page 17: storage tanks

on local communities as a result of the RELPRC, should the facility be expanded or should

other polluting industries be attracted to the area, the cumulative impact could be of concern.

As such, it is imperative that detailed monitoring of ambient air quality be continued while

monitoring of meteorological data also continued so as to generate a long term data set, LPRC

petroleum Engineers will take care of that. It is therefore assumed that a combination of

technology options, engineering design and siting have achieved the desired effect in the

ambient environment, i.e. a reduction in the predicted exceedances of the WHO 1-hour

guideline for NO2 during normal operating conditions.

The operational phase will not have the same severity of impact as the construction phase for

fauna and flora, as over time, most animals (snakes and insects as well as fish) will adjust to

the increased disruption within the life cycle of animals and human habitats on the Island

which are critical habitats, hence decreasing the level of protection from further disturbance.

It is therefore essential that LPRC work in close cooperation with EPA and the existing

concessionaire in terms of ensuring that the conservation worthiness of these habitats is

maintained. Furthermore, ongoing long-term monitoring programmes for all fauna and flora

types in the Island will be essential to improve the understanding of the conservation

worthiness of the area and to guide future development. LPRC should again work in

collaboration with EPA and local research institutions in gathering this data inclusive of LPRC

technical department.

A low negative impact significance rating was given for the impacts on surface and ground

water quantity as a result of groundwater abstraction during operation. Should groundwater

abstraction be higher than the recharge flux into the aquifer system (Du River and the Atlantic

Ocean), the impact significance rating may be more significant than the current rating. As

such, based on existing information, the degree of confidence in predictions is currently low. It

is therefore recommended that a detailed follow-up intrusive investigation at the proposed site

is undertaken to update the hydrogeological conceptual and numerical models and to confirm

the preliminary calculation results assumed by me.

Page 18: storage tanks

A summary of the physical and biological environment impacts including premitigation and

residual impact during operation are summarized below in Table 1.2.

Table 1.2 Summary of Residual Physical and Biological Environment Impacts During

Operation

Section Impact Significance(Premitigation) Residual

Impact

Significance

7.2.2 Impacts on

Air Quality

Relating to

Sulphur

Dioxide

(SO2) During

Operation

LOW NEGATIVE LOW

NEGATIVE

7.2.3 Impacts on

Air Quality

Relating to

Nitrogen

Dioxide

(NO2)

During

Operation

MEDIUM

NEGATIVE

LOW

NEGATIVE

Air Q

ualit

y

Page 19: storage tanks

7.2.4 Impacts on

Air Quality

Relating to

Particulate

Matter

(PM10)

During

Operation

LOW NEGATIVE LOW

NEGATIVE

7.3.1 Impact on

Groundwater

and Surface

Water

Quality as a

Result of

Sewage,

Waste and

Effluent

Pollution

MEDIUM

NEGATIVE

LOW

NEGATIVE

7.3.2 Impacts on

Groundwater

Quality as a

Result of

Reinjection

of Produced

Water into

earth

MEDIUM

NEGATIVE

LOW

NEGATIVE

7.3.3 Impact on

Surface and

Groundwater

as a Result

of Spillages

MEDIUM

NEGATIVE

LOW

NEGATIVE

Surf

ace

and

Grou

ndw

ater

Page 20: storage tanks

and

Leakages

(e.g.

Refueling,

Leaks from

Storage

Tanks, Leaks

from Pipes

etc.)

7.3.4 Impacts on

Surface and

Ground

Water

Quantity as a

Result of

Groundwater

Abstraction

LOW NEGATIVE NEGLIGABLE

NEGATIVE

7.4.1 Loss of

Topsoil

LOW NEGATIVE

NEGLIGIBLE

NEGATIVE

7.4.2 Soil

Compaction

LOW NEGATIVE

NEGLIGIBLE

NEGATIVE

7.5.1 Impact on

Biodiversity

NEGLIGIBLE – LOW

NEGATIVE

NEGLIGIBLE

– LOW

NEGATIVE

Section Impact Significance(Premitigation) Residual

Impact

Soil

Habi

tat a

nd

Biod

iver

sity

Page 21: storage tanks

Significance

7.6.1 Impact on

Local Flora

LOW NEGATIVE LOW

NEGATIVE

7.6.2 Impact on

Local Fauna

MEDIUM

NEGATIVE

LOW

NEGATIVE

7.7.1 Impact on

Terrestrial

and Aquatic

Habitats as a

Result Oil

Spills

LOW NEGATIVE NEGLIGIBLE

NEGATIVE

1.7.4 Summary of Actual and Residual Social Impacts during Construction Phase

A summary of the social impacts including pre-mitigation and residual impact during

construction are summarized below in Table 1.3. Those impacts that have a residual impact

significance of medium negative or higher or a medium positive or higher are discussed.

Increased Pressure on Social Infrastructure and Service Delivery

The development of the RELPRC as part of the broader oil-related activities will prompt an

increase in pressure on the already limited infrastructure and services in the Island through both

direct and indirect project activities. This impact, as related to the RELPRC and the broader

oil-related activities, has been given a high negative pre-mitigation rating in terms of the

indirect impact of in-migration into the project area. The direct impact of LPRC employees

and contractors on local infrastructure and services was rated as a low negative given that their

needs will be met by LPRC.

Increased Government Revenue

Increased government revenue refers to the payments LPRC will make to the

Flor

a an

d Fa

una

Non

-ro

utine

Ev

ents

Page 22: storage tanks

Liberian Government (e.g. tariffs, rents, and taxes generated from oil companies and

importers), which will translate back into Government spending in the Liberian economy. The

impact of direct payments made to government by LPRC and its importers is not applicable

during the construction phase as no direct payments will be made until operation of the

RELPRC. However, the tax payments as a result of expenditure of goods and services in the

country will be substantial due to the high capital expenditure during construction. As such,

this impact received a low-medium positive pre-mitigation rating. Based on mitigation, this

impact received a medium positive residual impact.

Improved Access to the LPRC’s Lab for Scientific Research

This impact received a medium positive pre-mitigation rating since the proposed development

in the LPRC may provide an opportunity for scientific studies to be conducted prior to the

commencement of and throughout the construction activities of the RELPRC.

Table 1.3 Summary of Residual Social Impacts during Construction

Section Impact Significance(Premitigation

)

Residual

Impact

Significance

8.2.1 Employmen

t – Direct,

Indirect and

Induced

NEGLIGIBLE to

LOW POSITIVE

LOW

POSITIVE

8.2.2 Procurement

of Local

Goods and

Services

NEGLIGIBLE

POSITIVE

NEGLIGIBLE

TO

LOW

POSITIVE

Econ

omi

c

Page 23: storage tanks

1.8 CONCLUSIONS

1.8.1 Background

The development of the oil industry in Liberia in general and LPRC’s RELPRC specifically, is

taking place in a sensitive and complex socioeconomic and biophysical environment.

Liberia, however, currently faces a large deficit in electricity supply where over 90 percent of

the population are not connected to the national power grid (West Africa Power Pool/mount

coffee). Liberia currently imports all of its petroleum product requirements from abroad as no

products are produced locally. As such the development of the energy sector in Liberia is a

national priority. This has facilitated LPRC’s Memorandum of Understanding (MoU) with the

Government of Liberia especially PPCC to develop oil production associated with RELPRC in

the Island.

However the history of tank disaster throughout the world reveals that problems often arise

undetected due to inaccurate evaluation of both foundation and structural defects. The soil,

water and concrete at the foundation bed are materials of different properties. The level of

interaction cannot be underestimated. Although the interaction is not spontaneous, the solvent

property of water can undermine the configuration of the soils upon which the structure rests.

Monitoring and inspection of crude oil reservoir will ensure continuous safety of the structure

so as to avoid the danger arising from environmental degradation as a resulting from structural

failure.

Monitoring of the tanks should be carried out more frequently for early detection of symptoms

and deficiencies and remedial measures taken as quickly as possible

1.8.2 RELPRC Location

Siting the RELPRC in the Bushrod Island is based on a number of environmental, technical and

financial criteria. The LPRC Jetty has to be located in the NPA in order to access the Tanks

Farm. The flow lines from the Jetty to the RELPRC need to be as short as possible principally

Page 24: storage tanks

due to the quality of the oil that causes concerns about flow assurance/wax formation and will

need additional pressure pumps to accelerate flows of products. The location of the RELPRC

needs to be as far as possible from the Du River which is pretty much fair based on water

analyses, in an area that will have a limited impact on the terrestrial and wetland habitats and in

close proximity to the escarpment road.

1.8.3 Impacts

The direct biophysical and social impacts of the proposed Project, as assessed in this report, can

be mitigated through stringent implementation of the mitigation measures contained in Sections

7 and 8 of the main report. However, should the facility be expanded or other industries be

attracted to the facility as already done by SRIMEX and ECOFUEL, and CONEX the intensity

and duration of potential cumulative impacts (e.g. on air quality, human health, social services

and conservation) within the Island as a result of actual and perceived impacts could be of

concern. Cumulative and indirect impacts are often more difficult for a particular private oil

company to mitigate. Generally they require significant Government intervention through

strategic planning, in partnership with the oil companies, especially importers and allocation of

the necessary resources to strengthen the local economy and institutional capacity of the area.

As such, it is imperative that LPRC not only strictly adhere to the mitigation measures (actions)

and effectively implement the monitoring measures documented in the Environmental

Management Plan of EPA, but that they also support local government institutions in ensuring

that capacity exists to address indirect and cumulative impacts that may result. Without this

level of commitment from LPRC, the residual and potential cumulative impacts may be more

significant than currently assessed. It is recommended that LPRC continue research dialogue

with EPA and other key stakeholders in order to effectively deal with potential immediate and

long term ‘conflicts’ with environmental and human right activates

1.8.4 Strategic Environmental Assessment

The activities proposed by LPRC for the RELPRC are no different to many other oil operation

activities undertaken throughout the world, however the sensitivity of the surrounding waters

Page 25: storage tanks

environment within which the RELPRC and oil production and processing as well as

distribution and storage activities will take place are of significance. The RELPRC is also the

first upgrading oil storage of its kind in Liberia

The importance of the oil industry to the development of the Liberia economy should not be

underestimated, however it must be recognized that the development of the oil sector will pose

a threat to the environmental issues if allowed to develop unabated and outside of any strategic

visions.

The compatibility of oil production with conservation, and a subsistence economy which is

largely based on self-employment must be investigated at a higher level to ensure that potential

indirect and cumulative impacts are identified and managed on a regional basis.

While oil activities often have substantial national economic benefits, they seldom offer

significant local benefits in the interests of sustainable development and taking into account

that further oil activities in the Bushrod Island, off-shore into the Atlantic Ocean, and in other

areas within the territory of Liberia are likely, it is recommended that the Government of

Liberia, in partnership with the oil companies, undertake a Strategic Environmental

Assessment (SEA). The SEA should assess the costs and benefits of encouraging the

continuation of a subsistence economy, conservation, tourism, and the development of the oil

sector in Liberia.

The SEA should consider focusing on the following question: “Under what conditions should

the oil sector operate in order to support the sustainable development of the area?” The

conditions referred to in this question may include restrictions or trade-offs to ensure that the

oil sector does not significantly compromise conservation or development.

It should also include an assessment of the willingness to accept a certain amount of risk

associated with the oil industry (i.e. risk of oil spills) and the subsequent potential catastrophic

impacts. The results of the SEA should be used for decision making regarding the future

production of oil and other associated industry in sensitive areas and areas of conservation.

Page 26: storage tanks

1.8.5 Recommendations

In summary, the implementation of the detailed Environmental Management Plans and

adherence to international best practice, which includes further detailed baseline data collection

and monitoring requirements, will provide a sound basis for mitigating and managing the

majority of direct impacts of the proposed RELPRC. The remaining uncertainties and

‘conflicts’ associated with the potential medium to long-term indirect and cumulative impacts

that may result from further oil distribution and handling throughout the Republic of Liberia

are issues that the Government of Liberia and the oil industry will need to resolve through an

SEA. This assessment should provide a framework within which future conservation,

harvesting of natural resources and oil production can be sustainably developed to benefit both

the local communities and Liberians at large as a whole. It is recommended that LPRC

continue dialogue with EPA and other key stakeholders in order to effectively deal with

potential ‘conflicts’. It is also feasible to consider using API 510 as the current economy is of

great concern to employees and all Liberians at the moment

1.9 REFERNCES

1. Facility piping system for industrial, commercial and health care system; Michael frankel

2. Tanks protection

3. Harrington, J.M., Gill, F.S.., Aw, T.C., Gardiner, K. (1998) Occupational Health.

(149)Ministry of Health and Social Welfare. National Mental Health Policy,2009

4. Ministry of Health and Social Welfare. Annual Report, 2009

5. Ministry of Health and Social Welfare. National strategy and Policy for Community

health services,

2008

6. Ministry of Health and Social Welfare. Capacity Building for the Division of

Environmental and Occupational Health, 2008

7. Ministry of Health Policy and Plan (2007-2011), 2007

Page 27: storage tanks

8. National Integrated Water Resources Management Policy, 2009

9. Shell Petroleum Development Company of Nigeria (2000): http://www.nigerianoil-

gas.com/industry profile

10. Shell Petroleum Development Company (2003): Oil Industry profile, Nigeria.

http://www.nigerianoil-gas.com/industryprofile

11. World Health Organization WHO Report (2003) Environmental Hazards and the Oil

Industry About we visit:

12. www.geosystems2004.com