2016 ILLINOIS EDITION FOR ANHYDROUS AMMONIA (NH3) 8 IL Admin Code 215 Ammonia Storage Tank Upgrade Compliance Guide Effective July 1 2016, the State of Illinois upgraded their NH3 storage requirements and put them into law. Some of these new laws are effective immediately and some have a due date as soon as 2020. Gas Equipment Company has all the necessary components and industry-leading experience to get your facilities up to standard, as well as making it the most efficient and SAFEST operation possible. We have included an illustration of an ammonia bulk plant with areas highlighted that may need to change to meet compliance (You should review all state and local requirements with your local authority having juris- diction). We also included: A numbered component cross reference chart linked to the new requirements on the illustration, parts detail pages, a nurse tank guide and a storage tank design guide on the last page. You can complete this guide to determine if any additional repairs or upgrades need to be made as well as meeting the new Illinois laws. Even though some of the deadlines are still a few years away, they will be here before you know it. This edition of GEC Solutions will help you prepare. For 80 years Gas Equipment Company has offered the best equipment avail- able from a select group of premier manufacturers. With branch warehouses throughout the Midwest, we provide same day service and our nationwide warehouses are all linked, offering you immediate prod- uct availability. Most importantly, our staff knowledge and expe- rience is unmatched in the industry. We offer a free inspection of your facilities and equipment. Call us today to schedule your inspection. For Summary Compliance Information visit www.ifca.com and click on “2016_new_nh3_rules_compliance_guide.pdf” Our field repre- senta- tives can help you understand all of your compli- ance options. We offer FREE on-site facility inspections and evaluations. INSIDE • 8 IL Admin Code 215 Ammonia Storage Tank Upgrade Compliance NEW Regulations • Sample Compliance NH3 Storage Layout • Base Engineering WIRE- LESS Emergency Shutdown System • NH3 Storage Equipment • NH3 Nurse Tank Equipment • Bulk Storage Tank Design Guide & Appurtenance Information Form IMPORTANT SAFETY WARNING: Anhydrous Ammonia (NH3) is a hazardous substance and should be handled by experienced and trained personnel only using accepted governmental and industrial safety procedures. Installation, usage, and maintenance of all products must be in compliance with all manufacturer instructions as well as requirements and provisions of ANSI, CGA, and all applicable federal, state, provincial and local standards, codes, regulations, and laws. Failure to follow these codes, regulations and recommendations could result in hazardous installation, bodily injury and/or death. It is the installer’s/operator’s responsibility to confirm that installations are proper- ly designed and installed in accordance with all safety codes, regulations and manufacturer recommendations; including your local authority having jurisdiction. Inspection and maintenance on a periodic basis is essential. Installation and maintenance should be performed only by qualified & certified personnel. Be sure all instructions are read and understood before installation, operation and service.
8
Embed
Storage Tank Upgrade Compliance Guide - Gas … with a manual shutoff valve or B. An approved excess flow valve or back check valve, a manual shutoff valve, and an approved Emergency
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
2 0 1 6 I L L I N O I S E D I T I O N F O R A N H Y D R O U S A M M O N I A ( N H 3 )
8 IL Admin Code 215 AmmoniaStorage Tank UpgradeCompliance GuideEffective July 1 2016, the State of Illinois upgraded their NH3 storagerequirements and put them into law. Some of these new laws areeffective immediately and some have a due date as soon as 2020.Gas Equipment Company has all the necessary components andindustry-leading experience to get your facilities up to standard, aswell as making it the most efficient and SAFEST operation possible.
We have included an illustration of an ammonia bulk plant with areashighlighted that may need to change to meet compliance (You shouldreview all state and local requirements with your local authority having juris-diction). We also included: A numbered component cross reference chart linked tothe new requirements on the illustration, parts detail pages, a nurse tank guide and astorage tank design guide on the last page. You can complete this guide to determineif any additional repairs or upgrades need to be made as well as meeting the newIllinois laws. Even though some of the deadlines are still a few years away, they willbe here before you know it. This edition of GEC Solutions will help you prepare.
For 80 years GasEquipment Companyhas offered the bestequipment avail-able from aselect group of premier manufacturers. With branch warehousesthroughout the Midwest, we provide same day service and ournationwide warehouses are all linked, offering you immediate prod-uct availability. Most importantly, our staff knowledge and expe-rience is unmatched in the industry. We offer a free inspectionof your facilities and equipment.
Call us today to schedule your inspection.
For Summary Compliance Informationvisit www.ifca.com and click on
INSIDE• 8 IL Admin Code 215Ammonia Storage TankUpgrade ComplianceNEW Regulations
• Sample Compliance NH3Storage Layout
• Base Engineering WIRE-LESS EmergencyShutdown System
• NH3 Storage Equipment
• NH3 Nurse TankEquipment
• Bulk Storage TankDesign Guide &AppurtenanceInformation Form
IMPORTANT SAFETY WARNING: Anhydrous Ammonia (NH3) is a hazardous substance and should be handled by experienced andtrained personnel only using accepted governmental and industrial safety procedures. Installation, usage, and maintenance of all productsmust be in compliance with all manufacturer instructions as well as requirements and provisions of ANSI, CGA, and all applicable federal,state, provincial and local standards, codes, regulations, and laws. Failure to follow these codes, regulations and recommendations couldresult in hazardous installation, bodily injury and/or death. It is the installer’s/operator’s responsibility to confirm that installations are proper-ly designed and installed in accordance with all safety codes, regulations and manufacturer recommendations; including your local authorityhaving jurisdiction. Inspection and maintenance on a periodic basis is essential. Installation and maintenance should be performed only byqualified & certified personnel. Be sure all instructions are read and understood before installation, operation and service.
2 SOLUTIONS.Illinois NH3 Edition.2016CALL GEC FOR A FREE ON-SITE INSPECTION
16
13
14
15
STORAGE TANK
2524
2019
22
1718
10' - 0"
28
2930
3233
8
11 12
31
34
910
12 3
47
56
27TRANSPORT UNLOADING
23
3"2"
11/4"11/4"
LIQUID/VAPOR TO RISER
LIQUID PUMP
21
26
HIGHLIGHTS OF THE NEW REGULATIONS8 IL Adm Code Part 215 215.55 (p) Container
pressure relief valves shallnot be used over 5 yearspast the manufactureddate. Compliance no laterthan December 31, 2020.
215.25 (a) & (f) If a storage tank is currentlyin use and does not have a U1-A form or abuild sheet or a legible data plate, it must betaken out of service by January 1, 2030.Railroad car tanks permanently mountedand used for storage shall be removed fromservice no later than December 1, 2025.
215.40 (g) (1) Each facility shallprovide the minimum protectionat each non-refrigerated storagetank opening on or beforeDecember 31, 2020 by:
A. The installation of an internalvalve with a manual shutoff valveorB. An approved excess flow valveor back check valve, a manualshutoff valve, and an approvedEmergency Shutoff Valve (ESV)located within 3 feet of the openingof the manual shutoff valve ESVs& internal valves shall be testedannually for the functions required.
215.65 (i) (3) Theminimum protectionfor all bypass linesshall consist of anexcess flow valveand a manual shutoffvalve provided thebypass is located atthe highest elevationof the storage tank.Any bypass line onthe underside of thetank shall have thesame type ofprotection as all otheroutlets on theunderside of the tank– see 215.40 (g) (1)
215.65 (v) & 215.65 (i) (2) Bulkheads shallprovide protection during transport unloading215.65 (v) 6 Caution signs at bulkheads required215.65 (i) (4) Installation of an in-line strainer ora strainer screen on the liquid unloading line atthe Bulkhead.
NH3 Bulk PlantContact GEC for acomprehensive RegOAnhydrous AmmoniaEquipment Catalog.
The illustrations in this guide are intended to inform a professional installer/system designer where valves are generallyinstalled on certain containers or applications. These illustrations are not intended for and must not be used for system design.
3SOLUTIONS.Illinois NH3 Edition.2016 CALL GEC FOR A FREE ON-SITE INSPECTION
WIRELESS EMERGENCY SHUTDOWNRadio Remote Control (Part# ASK1F1WAX200A-AC)Designed specifically for Anhydrous Ammonia Plants, our Remote Emergency Shutdown system was developed to eliminate costly hard-wiringof manual emergency-shutdown switches. Any number of radio transmitter units can be installed within 1000 ft of a receiver control unit. Thesystem is designed to work in conjunction with existing or new plant safety equipment and is easily installed. The ASK system can also beordered to work in conjunction with our Truck Remote Units if required. Transmitter devices are low-voltage intrinsically safe units suitable foruse in Class 1, Div 2, Group “D” hazardous environments. Transmitter batteries will last three-four years and have a test feature and low bat-tery alarm. Remote stop-switch is rugged non-sparking cast aluminum and is fully sealed against extreme weather and temperature condi-tions. Receiver units are designed to easily interface and trip electrical, pneumatic, nitrogen, or mechanical plant shut-off equipment. Systemsare pretested and shipped with a detailed installation guide and schematics. A four-year full replacement warranty and 24/7 lifetime productsupport is included.
Pneumatic Rotary Actuator6 A3212RA7 ESV-SIGN Small Emergency Shut-Off Sign8 ESV-SIGN-R Large Emergency Shut-Off Sign
4 SOLUTIONS.Illinois NH3 Edition.2016CALL GEC FOR A FREE ON-SITE INSPECTION
STORAGE TANK COMPONENTS
Swing-Check ESVs for Bulk Plants
A6010
Threaded Internal Valve for Delivery Trucks,Transports, and Stationary Storage Tanks
A3209D A3209DT
A3211D
A3213D
A3212R
Relief Valves
Rough Rider®CM6339-11-72Magnetel®
6339-11Eliminator®P6293-R4400
Rotogauge®A9090
A7616 A7624A7794
Magnetel® Gauge for Storage Tanks, Eliminator® Gauge for Storage Tanks,and Rough Rider® for Trucks
AA8533MAAA8542
A8560A8570
Globe Valves
A7513APA7514AP
A7517FP
Pull-Away Valves
A2141A6L
A2141A6
Excess Flow Valves
A2137
A7537N4
A3500L4
A6016 A6024
Nozzles
A7793
A7914A
Nozzles
A3185A2805C
TSS31691008SS-400
Storage Misc.
A3217AR
5SOLUTIONS.Illinois NH3 Edition.2016 CALL GEC FOR A FREE ON-SITE INSPECTION
GEC carries a complete line of components including pumps,compressors, valves, gauges hoses and actuator systems
LB361-LU
Part # DescriptionLGLD3E-VB-L/MTR 3” V-Belt Unit less motor10 HP TEFC 3PH 10 HP 3-phase TEFC motor
LB361-LULiquid transfer & vapor recoverycompressor unit with 15 HP3-phase TEFC motor
Blackmer Pump & Compressor
LGLD3E-VB-L/MTR
For protection of piping systems against truck pull-away with hose still connected. These bulkheads are made of 10” channel. Whenanchored in a concrete block (approximately 4 ft. x 4 ft. x 4 ft.) the bulkhead becomes a sound wall of protection against most pull-aways.
Part # DescriptionBH-10CV2-2CPLG 2-PORT VERTICAL BULKHEAD W/2" 3M FULL CPLGS*BH-10CV2-3CPLG 2-PORT VERTICAL BULKHEAD W/3" 3M FULL CPLGS*BH-10CV3-2CPLG 3-PORT VERTICAL BULKHEAD W/2" 3M FULL CPLGS*BH-10CV3-3CPLG 3-PORT VERTICAL BULKHEAD W/3" 3M FULL CPLGS*
Bulkhead StanchionsSafety Stanchions are designed for safe transfer of ammonia at the bobtail loading andtransport unloading points in a bulk plant. The stanchion is Rigid All-Steel construction.
BH-10CV2
ESV
Transport unloading Risersw/Hoses/Valves on STD 2 Hole BH
Both Liquid & Vapor Line
Flex-Union w/ Nipple
Flex Connector
BH-10CV2-2CPLG
Piping fromstorage
Grade
5/8" Rebar holes
65"
10"
12"
24" Minimum Depth*
16"
30"
*Check with local codes for proper above grade height.Bulkheads shall be anchored in reinforced concrete to preventdisplacement of the bulkhead. Reinforcement rod not supplied.
BH-10CV3-2CPLG
BH-10CV2-PKGPiping Kit installed. Bulkhead
not included.
BULKHEAD INSTALLATION RECOMMENDATIONS
TRANSFER EQUIPMENT
Part # Description QTYREL90-200X114 2"X1-1/4" REDUCING 90 DEGREE ELBOW 3000#
2EL90-200-2M FS ELBOW 90 DEGREE 2 INCH AT 2000#N-200X12 2" M.NPT X 12" EXTRA HEAVY SCH 80 BLACK PIPE NIPPLE 4
BH-10CV2-PKG includes fittings below:
NOTE: Piping kit for BH-10CV2-2CPLG, BH-10CV3-2CPLG bulkheads only.
* NOT APPROVED FOR USE IN TEXAS
6 SOLUTIONS.Illinois NH3 Edition.2016CALL GEC FOR A FREE ON-SITE INSPECTION
NH3 Anhydrous Ammonia Transfer Hose AssembliesDesigned to handle NH3/Anhydrous Ammoniatransfer applications
Hose ID Working Pressure Burst Pressure Part #3/4”
Century 2000 APPLICATION:• Low-permeation, anhydrousammonia transfer hose• Developed for use with nursetanks• Distinctly identified with a boldgreen stripe• Branded with removal date• Pro-rated six-year warranty foragricultural applications onlywhen coupled by an approveddistributer
TEMPERATURE RANGE:• -40°F to +180°F• -40°C to +82°C
BURST PRESSURE:• Minimum 5:1
MATERIAL TUBE:• Extruded , high-grade, low-per-meation EPDM
MATERIAL COVER:• Black abrasion and weatherresistant EPDM• Cover is pin-pricked, which pro-motes better dissipation of theanhydrous ammonia andassists in resisting cover blisters
BRANDING:• Green longitudinal mylarstripe: CENTURY 2000 •
– *** • REFER TO INDUSTRYRECOMMENDATIONSINCL RMA/IP-11-2 FORCARE
* Year of Manufacture”** Year of Manufacture plus 6years*** Year-Month of Manufacture
STANDARD LENGTHS:• 100 feet, 30.5 meters
Smart-Hose assemblies are designed and engineered with avalve integrated in each end fitting. If the hose assembly expe-riences a catastrophic hose failure, the Smart-Hose SafetySystem is designed to instantaneously shut off the flow in bothdirections. Designed as a passive safety device, the Smart-Hose Safety System needs no human intervention to activate.
The Smart-Hose Safety System is integrated intoNH3/Anhydrous Ammonia transfer hose assemblies anddesigned to meet the most rugged applications found in theFertilizer Industry. All NH3/Anhydrous Ammonia transfer hose
assemblies are designed to meet DOT HM 225 Standards.
• Each hose is tested under water with dry air or nitrogen toworking and test pressure• Each hose is serial numbered• Each hose is shipped with a Test Certificate and OperatingBooklet• Each hose meets US Passive Shutoff Mandate forMC330/331 Transports• Each hose meets HM 225• 316 Stainless Steel fittings are designed for reuse on new hose
LL3 Design L
a
assemblies and All NH3 / Anydrous Ammonia Each hose is tested under water with dry air or nitrogen to working and test pressure Each hose is serial numbered Each hose is shipped with a Test Certificate and Operating Booklet Each hose meets US Passive Shutoff Mandate for MC330/331 Transports 316 Stainless Steel fittings are designed for reuse on new hose
H
LL3-B Design *Available in 2” ID
S a
All NH3 / Anydrous Ammonia Each hose is tested under water with dry air or nitrogen to working and test pressure Each hose is serial numbered Each hose is shipped with a Test Certificate and Operating Booklet Each hose meets US Passive Shutoff Mandate for MC330/331 Transports 316 Stainless Steel fittings are designed for reuse on new hose
H
Krug CompressorFor efficient transferof Anhydrous AmmoniaPart # Description
DG0000-V-ISCellular Ammonia Monitor for Class I,Division I, Group D Locations -Includes 5’ Harness Assy. w/Remote
Ready Sensor
DG0001-V-ISCellular Ammonia Monitor for Class I,Division I, Group D Locations -
Monitor Only
DG0001-VCellular Ammonia Monitor for Class I,Division 2, Group D Locations -
Includes 5’ Harness
DG0000-VCellular Ammonia Monitor for Class I,Division 2, Group D Locations -
Monitor Only
IS Cellular Ammonia Monitor
®
TRANSFER EQUIPMENT
LL1 Design
assemblies and All NH3 / Anydrous Ammonia Each hose is tested under water with dry air or nitrogen to working and test pressure Each hose is serial numbered Each hose is shipped with a Test Certificate and Operating Booklet Each hose meets US Passive Shutoff Mandate for MC330/331 Transports 316 Stainless Steel fittings are designed for reuse on new hose
H
TM-GSLRH10
BulkPart # Description
TM-GSLTH10 8” Taylor Dialw/10 ft. cable
TM-GSLRH10 8” Magnetel Dialw/10 ft. cable
TM-GSLSH10 4” Magnetel Dialw/10 ft. cable
TM-GSHB10A10 ft. harness assy.w/sensor F/LG 8” &4” dial replacement
DG0000-V
7SOLUTIONS.Illinois NH3 Edition.2016 CALL GEC FOR A FREE ON-SITE INSPECTION
Pressure GaugeW0164
Safety Relief ValveAA3130UA250AA3130UA265
Vapor Bleeder ValveA7551P orA7550P
Hose End ValveA7797A orA7708L with A7575L4
Liquid Withdrawal ValveA8017D Series Fixed Liquid
Level GaugeTSS3169
Liquid Filler ValveA8016DP
Liquid Filler ValveA8016DP
Pressure GaugeW0164
Safety Relief ValveAA3130UA250/265
Liquid Withdrawal ValveA8017DH/DP Fixed Liquid
Level GaugeTSS3169
Vapor Return ValveA8016DP
Part # DescriptionA8017DP Liquid Withdrawal ValveA8016DP Liquid Fill Valve or Vapor Return ValveTSS3169 Vent valve, 1⁄4” SS, Teflon
Part Number Length DescriptionE16NH3X12.5FT 12.5' 1” x 12.5’ - 1” NPT Male EndsE20NH3X12.5FT 12.5 1 1⁄4” x 12.5’ - 1 1⁄4” NPT Male EndsE16NH3X15FT 15' 1” x 15’ - 1” NPT Male EndsE20NH3X15FT 15' 1 1⁄4” x 15’ - 1 1⁄4” NPT Male Ends
NH3 Hose Assemblies
NURSE TANK COMPONENTS
E16NH3X12.5FT
8 SOLUTIONS.Illinois NH3 Edition.2016CALL GEC FOR A FREE ON-SITE INSPECTION
C
D
B A
F
E
G H
9
13
10 11 12 1 2 3
8 7 6
5
4
Bulk Storage Tank Design GuideContact
Company NameDate of Inspection
CityState
Inspected by
Data Plate InformationManufacturerManufacturer YearSerial #Water CapacityO.D.Working PressureOAL