Zone Reference Associated Waters Length (if applicable Approx Height Above Ground (if applicable) Approx 10 figure NGR (if applicable) Licence type required for SEPA Controlled Activity SEPA Comment 4AT1 Carron Water 65m or thereby N/A NO 87500 85733 CAR Licence not required 4AT2 Carron Water 2m or thereby N/A NO 87517 85733 Marine Scotland Marine Scotland Marine Scotland 4AT3 Carron Water 5m or thereby N/A NO 87459 85748 Temporary Bridge Registration CAR Licence not required 4AT4 Carron Water 5m or thereby N/A NO 87515 85739 Marine Scotland Marine Scotland Marine Scotland 4AT5 Carron Water 20m or thereby N/A NO 87520 85733 Marine Scotland Marine Scotland Marine Scotland 1BT1 Carron Water 150m or thereby N/A NO 87314 85756 CAR Licence not required 1BT2 Carron Water 120m or thereby N/A NO 87439 85743 CAR Licence not required 1BT3 Carron Water 5m or thereby N/A NO 87307 85755 Temporary Bridge Registration CAR Licence not required 1BT4 Carron Water 70m or thereby N/A NO 87388 85738 CAR Licence not required 1C 1CT1 Carron Water 115m or thereby N/A NO 87274 85758 CAR Licence not required 1DT1a+b Carron Water 120m or thereby N/A NO 87200 85716 CAR Licence not required 1DT2 Carron Water 80m or thereby N/A NO 87100 85657 CAR Licence not required 1DT3 Carron Water 5m or thereby N/A NO 87106 85655 Temporary Bridge Registration CAR Licence not required 1DT4 Carron Water 5m or thereby N/A NO 87192 85701 Temporary Bridge Registration CAR Licence not required 1DT5 Carron Water 5m or thereby N/A NO 87068 85644 Temporary Bridge Registration CAR Licence not required 1DT6 Burn of Glaslaw 5m or thereby N/A NO 87086 85640 Temporary Bridge Registration CAR Licence not required 1ET1 Carron Water 140m or thereby N/A NO 87048 85641 CAR Licence not required 1ET2 Carron Water 2m or thereby N/A NO 86926 85647 Temporary Bridge Registration CAR Licence not required 2GT1 Burn of Glaslaw 60m or thereby N/A NO 87006 85467 CAR Licence not required 2GT2 Burn of Glaslaw 50m or thereby N/A NO 87025 85469 CAR Licence not required 2GT3 Burn of Glaslaw 90m or thereby N/A NO 87077 85580 CAR Licence not required 2GT4 Burn of Glaslaw 2m or thereby N/A NO 87086 85623 Temporary Bridge Registration CAR Licence not required 2GT5 Burn of Glaslaw 75m or thereby N/A NO 87054 85530 CAR Licence not required 2GT6 Burn of Glaslaw 20m or thereby N/A NO 87015 85469 CAR Licence not required 2GT7 Burn of Glaslaw 5m or thereby N/A NO 87017 85469 Temporary Bridge Registration CAR Licence not required 2GT8 Burn of Glaslaw 5m or thereby N/A NO 87036 85497 Temporary Bridge Registration CAR Licence not required Temporary construction vehicle access bridge over river flow <5m wide Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary construction vehicle access bridge over river flow. Temporary construction vehicle access bridge over river flow < 5m wide. Temporary construction vehicle access bridge over river flow < 5m wide. Temporary bridge diversion of utilities above channel to faciliate bridge and channel works <5m wide. Temporary construction vehicle access bridge over river flow < 5m wide. Stonehaven FAS Expected Temporary Works The background provides a list of associated activities. See separate sheets for depictions of temporary works Description 2G 1E Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary construction vehicle access bridge over river flow <5m wide Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary diversion of flow in culvert. Culvert to contain two resting pools at approximately 40m centres. Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary channel diversion along extent to facilitate works. This may be created by a temporary barrier to separate the works from the river flow. End of barrier adjusts to switch water to opposite side to accommodate works on opposing backs when necessary. Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary channel diversion and/or overpumping of water along extent to facilitate channel works. Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. 4A 1B 1D Temporary construction vehicle access bridge over river flow < 5m wide. Temporary construction vehicle access bridge over river flow < 5m wide. Temporary barrier to separate works from river flow to facilitate works. End of barrier adjusts to switch water to opposite side to accommodate works on opposing banks when necessary. Temporary bridge diversion of utilities above channel to faciliate bridge and channel works <5m wide. Temporary bridge (2m wide, 15m span), to allow pedestrian access for the public during raising of existing bridge and provide a diversion route for utilities. Temporary construction vehicle access bridge over river flow < 5m wide. Temporary flood defence barrier during construction, to maintain flood defence standard once existing wall removed. Temporary overpumping of water to allow for culvert replacement Temporary reprofiling of slope to allow access to carry out works, including tree removal.