Top Banner
Siam Toyota Manufacturing Co., Ltd Project STM 2 _ TC 3 & TC 4 PCMC Engineering Co., Ltd
20

Stm2 tc3 tc4 scope of work part1

Jul 04, 2015

Download

Business

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Stm2 tc3 tc4 scope of work part1

Siam  Toyota  Manufacturing  Co.,  Ltd      

Project    

STM  2  _  TC  3  &  TC  4  

PCMC  Engineering  Co.,  Ltd  

Page 2: Stm2 tc3 tc4 scope of work part1

Project  Management    

PCMC  Engineering  Co.,  Ltd  

Work  

Time  

People  

Page 3: Stm2 tc3 tc4 scope of work part1

Project Organization Chart For STM Mechanical : Air Condition and Sanitary Work Revise : 4 ,June, 2013

Document Section! Engineer Section!

Purchase! Site Admin! EE Engineering!ME

Engineering!Auto Cad! Safety Doc.!

Store! House Keeper! ME , EE! Safety Site! Foreman! Foreman!

PCMC Director! Mr. Phichet Wangveera !

Tel : 08-4666-9963!!

QC. !

Project Co.!Document Engineering!

Document Manager! Project Manager!

Site Manager!

Page 4: Stm2 tc3 tc4 scope of work part1

Project  Manager  

•  Name  :  Mr.  Dusitsan  K.  •  Work  Experience  

PCMC  Engineering  Co.,  Ltd  

Page 5: Stm2 tc3 tc4 scope of work part1

Site  Manager  

•  Name  :  Mr.  Tawatchai  S.  •  Work  Experience    – Toshiba  Consumer  Product  (  Thailand  )  Co.,  Ltd  •  ConstrucNon  Manager    

PCMC  Engineering  Co.,  Ltd  

Page 6: Stm2 tc3 tc4 scope of work part1

Current  Project  Show  Case  •  Project  Name  :      FaxLite  Green  Data  Center  •  Owner  :          AIS  •  Main-­‐Contractor  :      Schneider    •  Project  Valve  :      76  Mil  Baht    •  Scope  of  Work  :      Mechanical,  Sanitary,  Fire  ProtecNon    

PCMC  Engineering  Co.,  Ltd  

Page 7: Stm2 tc3 tc4 scope of work part1

FXL  :  Scope  of  Work  

•  Mechanical  Work  – Water  Cooled  Chiller  500  Ton  x  3  Units    – Cooling  Tower  x  3  Units  – Chilled  &  Condenser  Water  Pump    – Piping  ,  InsulaNon  Work  – AHU,  FCU  ,  and  CRAC    – DucNng  and  InsulaNon  Work  – Electrical  Work    – ME  BMS  Control  Work    

PCMC  Engineering  Co.,  Ltd  

Page 8: Stm2 tc3 tc4 scope of work part1

FXL  :  Scope  of  Work  

•  Sanitary  – Cold  Water  Work    – Waste  and  Rain  Water  Work  – Piping  Work    

•  Fire  ProtecNon  Work    – Sprinkler  Work    – Pre-­‐AcNon  Work      

PCMC  Engineering  Co.,  Ltd  

Page 9: Stm2 tc3 tc4 scope of work part1

FXL  :  Single  Line  Diagram  

PCMC  Engineering  Co.,  Ltd  

Page 10: Stm2 tc3 tc4 scope of work part1

 Morning  Talk  /  Safety  Training  

PCMC  Engineering  Co.,  Ltd  

Page 11: Stm2 tc3 tc4 scope of work part1

Safety  Training  

•  อบรมพนักงานใหม่ก่อนเข้าทํางาน •  อบรมพนักงานทุกคน 1  อาทิตย์ต่อครั้ง  

Page 12: Stm2 tc3 tc4 scope of work part1

Rule  and  RegulaNon  

Page 13: Stm2 tc3 tc4 scope of work part1

การแต่งกายช่างที่เข้าทํางานในโครงการ

สวมหมวกนิรภัย

ติดบัตรพนักงาน สวมเสื้อบริษัทฯ

นุ่งกางเกงขายาว

รองเท้าหุ้มส้น

Page 14: Stm2 tc3 tc4 scope of work part1

Safety  Training  

Page 15: Stm2 tc3 tc4 scope of work part1

Safety  Training  

Page 16: Stm2 tc3 tc4 scope of work part1

Safety  Training  :  Worker  ID  

Page 17: Stm2 tc3 tc4 scope of work part1

Safety  Cycle  

Page 18: Stm2 tc3 tc4 scope of work part1

Safety  Patrol  

Page 19: Stm2 tc3 tc4 scope of work part1

Safety  Patrol  

Page 20: Stm2 tc3 tc4 scope of work part1

Safety  Patrol