Connecng people, products and places safely and efficiently with customer focus, accountability and environmental sensivity to enhance the economy and vitality of North Carolina STIP Project No. R-5798: Proposed Construcon of a Median along East Caswell Street (U.S. 74) from Graham Street to Allen Pond Road (S.R. 1749) September 11, 2018 Wadesboro, Anson County to the Public Meeng for the State Transportaon Improvement Program (STIP) Project No. R-5798. Project Team Members from the N.C. Department of Transportaon Division 10 and DRMP are pleased to be here to answer your quesons and receive your input. Maps of the area idenfying the project study area, community points of interest and traffic informaon are available for review. You can find informaon on the NCDOT Public Meeng website at: h3ps://www.ncdot.gov/news/public- meengs Welcome Quesons? Comments? Chris Haire, PE DRMP, Inc. 8000 Regency Parkway, STE 110 Cary, NC 27518 Phone: (919) 230-7857 E-mail: [email protected]Travis Preslar, PE NCDOT Project Manager Division 10 12033 E. Independence Blvd. STE H Ma3hews, NC 28105 Phone: (704) 845-1151 E-mail: [email protected]Purpose of this Public Meeng Today’s meeng is an important step in the NCDOT process for making you, the public, a part of the project development process. The purpose of the meeng is to: • Present the proposed designs • Discuss any concerns and ask quesons • Receive your comments Project Schedule and Costs Preliminary Designs………………....…...… ….Fall 2018 Final Environmental Document……………..Fall 2018 Begin Right of Way Acquision………...Spring 2019 Begin Construcon …….......................Spring 2021 Right of Way & Ulies $ 5,500,000 Construcon $ 11,300,000 *Costs as shown in the currently adopted State Transportaon Improvement Program (STIP). Schedule and Costs are subject to change. Your Input Is Important Public involvement is an important part of the project development process. The NCDOT encourages public involvement on transportaon projects. All comments, regardless of how submi3ed (online, phone, email, or le3er), will be taken into consideraon as the project develops. The project team will explore opons to incorporate comments and address concerns where and when feasible. Comments should be submi3ed by September 26, 2018.
10
Embed
STIP Project No. R-5798: Proposed Construc˙on of a Median ... · Allen Pond Road (S.R. 1749), is a five-lane, undivided arterial roadway, with a 2016 average annual daily traffic
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Connec�ng people, products and places safely and efficiently with customer focus, accountability
and environmental sensi�vity to enhance the economy and vitality of North Carolina
STIP Project No. R-5798: Proposed Construc�on of a
Median along East Caswell Street (U.S. 74) from
Graham Street to Allen Pond Road (S.R. 1749)
September 11, 2018 Wadesboro, Anson County
to the Public Mee ng for the State
Transporta on Improvement Program (STIP) Project No.
R-5798. Project Team Members from the N.C. Department
of Transporta on Division 10 and DRMP are pleased to be
here to answer your ques ons and receive your input. Maps
of the area iden fying the project study area, community
points of interest and traffic informa on are available for
review. You can find informa on on the NCDOT Public
Mee ng website at: h3ps://www.ncdot.gov/news/public-