Stillwater Mining Company Stillwater Mine East Boulder Mine
68

Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Aug 30, 2018

Download

Documents

hatuong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Stillwater Mining Company

Stillwater Mine

East Boulder Mine

Page 2: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Forward Looking Statement

Some statements contained in this presentation are forward-looking within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended, and, therefore, involve uncertainties or risks that could cause actual results to differ materially. Additional information regarding factors which could cause results to differ materially is found in the section entitled “Risk Factors” in the Company’s Annual Report on Form 10-K.

The Company intends that the forward-looking statements contained herein be subjected to the above-mentioned statutory safe harbors. Investors are cautioned not to put undue reliance on forward-looking statements. The Company disclaims any obligation to update forward-looking statements.

Page 3: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Agenda

• Thursday, September 29Orientation, Stillwater MineReview of 2005 Operational FocusUnderground TourTour of Smelter, Refinery

• Friday, September 30Overview, East Boulder OperationsUnderground and Surface Tour, East Boulder Mine

Page 4: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Operations Focus

Goal: Sustainable operations after the auto contracts

• Cost Reduction

• Increase Production Levels

• Introduce/Re-introduce Selective Mining

• Improve the Developed State

• Develop and Advance the Safety Systems

• Establish sound environmental system

Page 5: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Advance the Safety Systems

• G.E.T. Safe introduced in 2001

• “Safety first, production will follow”

Page 6: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Safety Record

MSHA Reportable Accident Frequency Rate

0.02.04.06.08.0

10.012.014.016.0

Jan

2000 Ap

rJu

lO

ctJa

n 20

01 Apr

Jul

Oct

Jan

2002 Ap

rJu

lO

ctJa

n 20

03 Apr

Jul

Oct

Jan

2004 Ap

rJu

lO

ctJa

n 20

05 Apr

Jul

Oct

Inju

ries/

200,

000

Hou

rs

Page 7: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Safety Record

MSHA Reportable Accident Frequency Rate

0.02.04.06.08.0

10.012.014.016.0

Jan

2000 Ap

rJu

lO

ctJa

n 20

01 Apr

Jul

Oct

Jan

2002 Ap

rJu

lO

ctJa

n 20

03 Apr

Jul

Oct

Jan

2004 Ap

rJu

lO

ctJa

n 20

05 Apr

Jul

Oct

Inju

ries/

200,

000

Hou

rs

Page 8: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

2004 Achievements

• MSHA recognition for “Most Improved Mine” in Rocky Mountain District

• OSHA award under SHARP for smelter, refinery

• 34% reduction in accident frequency rate compared to 2003

Page 9: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Safety Record

MSHA Reportable Accident Frequency Rate

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Jan

2000 Ap

rJu

lO

ctJa

n 20

01 Apr

Jul

Oct

Jan

2002 Ap

rJu

lO

ctJa

n 20

03 Apr

Jul

Oct

Jan

2004 Ap

rJu

lO

ctJa

n 20

05 Apr

Jul

Oct

Inju

ries/

200,

000

Hou

rs

Page 10: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

2005 Update

• Laboratory recognized under SHARP by OSHA

• Further expansion of employee participation

• Implementation of internal audit processes

• A further reduction of 30% of injury frequency rate

Turning a historic operating weakness into a point of competitive strength

Page 11: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Operations Focus

• Cost Reduction

• Increase Production Levels

• Introduce/Re-introduce Selective Mining

• Improve the Developed State

• Develop and Advance the Safety Systems

Page 12: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Improved Developed State

• Significant investment in 2005

• Improved infrastructure to support higher production

• Increased primary development to expand proven reserves

Page 13: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Infrastructure- Stillwater Mine

• Sand Plant for Upper West

• Rail haulage on 35W

• Continued development on B32

Page 14: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Infrastructure – East Boulder

• Added tailings capacity

• Tunnel re-hab/improvement

• Ventilation

• Long-term ore/waste passes

Page 15: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Infrastructure – East Boulder

• Two raises, each 1800-ft • Will double ventilation flow at mine• Initially schedule for completion of both raises in Q3

2005• Transferred second raise to different contractor• First raise to be completed near year-end, second raise

in H2 of 2006

Page 16: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Developed State - Proven Reserves

• Reef – Unique type of deposit

• Formation of the Stillwater Complex

• Accessing the deposit

• Proven, probable reserves

Page 17: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Primary Platinum Group Metal Sources

Page 18: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill
Page 19: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Stillwater Complex – Pre Beartooth Uplift

Page 20: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Stillwater Complex – Post Beartooth Uplift

28 miles long

+1 mile deep

5 feet thick

Page 21: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Stillwater Complex Hanging Wall Projection – Looking West

Page 22: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Location of the Stillwater Complex

CORPORATEHEADQUARTERS

?

?

?

?

?

Projection of the Stillwater Complex

Page 23: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Deposit Characteristics

- Large lateral extent

- Consistency in average over larger areas

- Local variability

- Limited surface access

Page 24: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Ore Reserves

- Proven ReservesBased primarily on diamond drilling results, typically on 50-foot spacing horizontally and vertically.

- Probable Reserve determinationProjection from known points up to a maximum of 1,000 ft. Estimation factors are based on proven reserve information (grade, reef thickness, % mineable, area, etc.)

- Economic analysis

- Reviewed and opined on by Behre Dolbear

Page 25: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Probable Conversion

• Typically, each year a portion of the area carried as probable reserve is accessed, drilled and placed into proven reserves

• Probable conversion rate is an indicator of past success in converting probable reserve tons to proven reserve tons

• Year to year there is considerable variability

• Stillwater’s probable estimation technique is based on cumulative geologic experience

Page 26: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Ore Reserves – Block Model

Block Area 8

Page 27: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81997 to 2004 Reef Main Zone Composites

Page 28: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81997 to 2004 Reef Undiluted Block Model

Page 29: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81997 Reef Undiluted Block Model

Conversion rate – 1,160%

Page 30: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81998 Reef Undiluted Block Model

Conversion rate – 24%

Page 31: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81999 Reef Undiluted Block Model

Conversion rate – 70%

Page 32: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-82000 Reef Undiluted Block Model

Conversion rate – 41%

Page 33: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-82001 Reef Undiluted Block Model

Conversion rate – 67%

Page 34: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-82002 Reef Undiluted Block Model

Conversion rate – 55%

Page 35: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-82003 Reef Undiluted Block Model

Conversion rate – 103%

Page 36: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-82004 Reef Undiluted Block Model

Conversion rate – 133%

Page 37: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Block-81997 to 2004 Reef Undiluted Block Model

Probable to proven conversion rate 1997-2004…. 84%

Page 38: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Historical – Overall Mine Conversion

Stillwater Mine East Boulder Mine1997 163%1998 150%1999 66%2000 111%2001 104% 88%2002 71% 91%2003 52% 86%2004 62% 125%

Overall Stillwater Mine 92% Overall East Boulder Mine 100%

Annual Conversion of Probable to Proven Tons

Page 39: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Drill Results – Off Shaft

Three Month Rolling Average

0

50

100

150

200

250

300

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04

Num

ber o

f Def

initi

on H

oles

0%

10%

20%

30%

40%

50%

60%

% E

cono

mic

Hol

es

# Holes % Economic

Avg. ~ 36%

Page 40: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Drill Results – Off Shaft

• Off Shaft – Grade-Thickness 11.9 (oz x HT)

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04

Hor

izon

tal G

rade

-Thi

ckne

ss

MonthlyThree-Month Average

Page 41: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Drill Results – Upper West

Three Month Rolling Average

0

20

40

60

80

100

120

140

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04

Num

ber o

f Def

initi

on H

oles

0%

10%

20%

30%

40%

50%

60%

70%

80%

% E

cono

mic

Hol

es

# Holes % Economic

Avg. ~ 54%

Page 42: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Drill Results – Upper West

• Upper West Grade-Thickness 9.4 (oz x HT)

0.0

5.0

10.0

15.0

20.0

25.0

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04

Hor

izon

tal G

rade

-Thi

ckne

ss

Monthly Three-Month Average

Page 43: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Actual vs Predicted

Percent of Holes with “economic” intercepts

JM RenduPredicted

SMC 2000-2004Actual

Off-Shaft Area 36-40% 36%

Upper West Area 54% 54%

Rendu used a threshold grade-thickness of 1.8 opt-ft

SMC uses a grade-thickness of 2.1

Page 44: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Grade Trends in Drill Results

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

Jan-00 Jan-01 Jan-02 Jan-03 Jan-04

Ave

rage

Gra

de (o

z/to

n)

Off-Shaft Upper West Linear (Off-Shaft) Linear (Upper West)

Page 45: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Probable Conversion

• One year results are highly variable

• Continual updating of key factors based on probable to proven results and geologic understanding

• Apparent conversion can be impacted by non-geologic factors– Metal price changes– Changes in mining methodology

Page 46: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Resource Development Sequence

14 to 23 MONTHS FROM FWL TO PRODUCTION; 17 MONTHS AVG

Page 47: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Proven Reserves

• Indicator short-term productive capacity– Number of working areas, levels available

• Targeting proven reserves of 3-4 years of production– More complete understanding of an area before development– More consistent mix of mining methods

• Development plans need to realistically reflect development sequence– Ramping up development creates a backlog of undrilled FWL,

etc– Secondary access, infrastructure needed before mining in new

reserves

Page 48: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

East Boulder Proven Reserves

Year Proven ReserveTons

Target RateTPD

Proven ReserveMonths

2001 528,685 930 18.7

2002 647,882 1,270 16.8

2003 660,346 1,520 14.5

2004 1,225,490 1,375 29.3

A production rate of 2,000 tpd indicates a targeted proven reserve of 2.2-2.9 million tons.

Page 49: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Stillwater Proven Reserves

Year Proven ReserveTons

Target RateTPD

Proven ReserveMonths

2000 2,693,826 2,600 34.1

2001 2,778,550 3,000 30.5

2002 2,489,883 2,120 38.6

2003 2,052,112 2,000 33.7

2004 1,971,248 1,900 34.1

A production rate of 2,600-2,800 tpd indicates a targetedproven reserve of 2.8-4.0 million tons.

Page 50: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Increasing Proven Reserves

• Development of Proven Reserves dependent on:– Primary Development Footage

• Footwall lateral (FWL) advance– Diamond Drilling– Sound mining practice

• Historic yields of 70 tons per foot-FWL at Stillwater, 115 tons per foot-FWL at East Boulder

Page 51: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

2005 Development Efforts

• Stillwater: – 34,700 feet of primary development, including 19,500 feet of

FWL– 465,000 feet of diamond drilling

• East Boulder: – 16,849 of primary development, including 11,500 feet of FWL– 165,000 feet of diamond drilling

• Capitalized Development cost of $62.3 million

Page 52: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Key Indicators – Developed State

• Primary Development Footage– Footwall Lateral Advance

• Diamond Drilling Footage

• Year-End Proven Reserves

• Conversion Rate

Page 53: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Year-to-Date Progress - Developed State

Goal Mid-Year Forecast

Stillwater Mine

Primary Development 34,700 Feet 36,000 Feet

Footwall Lateral 19,500 Feet 20,500 Feet

Diamond Drilling 465,000 Feet 485,000 Feet

East Boulder Mine

Primary Development 16,849 Feet 19,000 Feet

Footwall Lateral 11,500 Feet 12,500 Feet

Diamond Drilling 165,000 Feet 250,000 Feet

Page 54: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Long Term Development Rates

East Boulder Stillwater

Historic Yield, ton/ft-FWL 110-130 70

Long Term Production Target 2,000 tpd 2,600-2,800 tpd

Steady State –FWL Advance 6,100 ft/yr 14,100 ft/yr

2005 Forecast FWL 12,500 ft 20,500 ft

Page 55: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Operations Focus

• Cost Reduction

• Increase Production Levels

• Introduce/Re-introduce Selective Mining

• Improve the Developed State

• Develop and Advance the Safety Systems

Page 56: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining

• Benefits– Increased ounces produced– Increased mining recovery of deposit

• Narrower – access to marginal areas• Ability to mine smaller stopes

– Decreased secondary development requirements

• Opportunities– Adding ramp and fill mining to Upper West at Stillwater– Increased conventional (slusher) mining in Off-Shaft area at

Stillwater (including Alimak mining)– Increasing ramp and fill at East Boulder– Adding conventional mining at East Boulder

Page 57: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Increased Recoveryof Deposit

Undiluted Grade

Page 58: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Increased Recoveryof Deposit

Bulk Mining Method

Page 59: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Increased Recoveryof Deposit

Selective Mining Methods

Page 60: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Increased Recoveryof Deposit

Selective Mining

Bulk Mining

Page 61: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Reduced Secondary Development

29W6100 StopeMining Method Ramp and Fill Alimak/SlusherStope Tons 62,815 51,547Ore Tons to Mill 54,431 48,039Average Grade 0.84 0.94Contained Oz 46,566 46,566

Secondary DevelopmentFootage 2,360 840Tonnage 19,412 6,125

Total Tons Mined 82,227 57,672Tons per Recovered Oz 1.92 1.35

Page 62: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – Improved Grade

• Focus at East Boulder – Increase Grade

• Average Grade (2003-2005): 0.389 opt– 2,000 tpd at 0.39 not an acceptable outcome– Limited opportunity for significant change without modifying mining

method

• Ore body: 5.0 feet wideSills 8.0-8.5 feet wide

• Selective (slusher) mining aim is to narrow mining width to 6.0-6.5 feet

• Less secondary development required

Page 63: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Selective Mining – 2005 Efforts

• Sand Plant for Upper West scheduled for completion Q2 of 2006

• Contractor on site at Stillwater with initial Alimak units; first mining in Q2 of 2005

• Initial conventional stopes at East Boulder in 2005

Page 64: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Key Indicators – Selective Mining

• Completion of Sand Plant in 2006

• East Boulder– Tonnage from selective mining– Grade

• Stillwater– Tonnage by mining method

• Year-End Proven Reserves

• Conversion Rate

Page 65: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Operations Focus

• Cost Reduction

• Increase Production Levels

• Introduce/Re-introduce Selective Mining

• Improve the Developed State

• Develop and Advance the Safety Systems

Page 66: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Production Increases

• Long range targets:– East Boulder 2,000 tpd– Stillwater 2,600-2,800 tpd

• Foundation needed in infrastructure, reserves and workforce to achieve and sustain

• Timing dependent on rate of success in development, but can begin in parallel with development

Page 67: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Operations Focus

• Cost Reduction

• Increase Production Levels

• Introduce/Re-introduce Selective Mining

• Improve the Developed State

• Develop and Advance the Safety Systems

Page 68: Stillwater Mine - library.corporate-ir.netlibrary.corporate-ir.net/library/99/998/99837/items/168059/Sep05... · Stillwater (including Alimak mining) – Increasing ramp and fill

Cost Reduction

• Initial actions serve to reduce operating costs

• Capital expenditures currently driven by investment in reserves, infrastructure– Longer term gain expected from less mechanized mining

• Operating cost reduced through selective mining– Less secondary development– Reduced support per ounce

• Economy of scale