Page 1: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Steve Connor

Technical Services Consultant

Page 2: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

• Discuss the operational drivers: • Efficiency, Reliability and Safety

• The impact areas associated with each

• Possible remedies or solutions to consider

• Prioritizing

2

What We are Covering Today

Page 3: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

What’s most wrong with my boiler operation?

Efficiency?

Reliability?

Safety?

3

Page 4: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

What’s most wrong with my boiler operation?

Efficiency?

Reliability?

Safety?

Where do problems normally lie?

What are most popular solutions?

How do I prioritize them?

4

Page 5: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Efficiency

5

Page 6: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Major Market DriversEconomics

6

COST OF

OPERATION

50% +

Page 7: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Impact Areas

7

Page 8: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Popular Fuels

8

Page 9: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hydrogen/Carbon Ratio

9

Page 10: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Moisture Losses

10

Hydrogen

OxygenWater Vapor = Moisture losses!!

Page 11: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Fuel/Air Control

11

Single motor & Jackshaft

Page 12: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Combustion Problems

12

Page 13: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Stack Losses

13

40 Deg. F Rise = 1% Loss

• Operating pressure

• Firing rate

• Ambient temperature

BASED ON:

Page 14: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Excess Air Increases As The Firing

Rate Decreases

14

Page 15: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Combustion Efficiency

0%

2%

4%

6%

8%

10%

12%

Burner

Turndown4 To 1

75%LF 50%25%

Percent O2

Firing Rate

Every 2%

Increase

= 1% loss!

100%

Page 16: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Cycling Losses

16

Pre & Post

Purge Losses

Page 17: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Excessive Makeup?

Feed water temperature?

Condensate returning?

17

Page 18: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Excessive Makeup?

Feed water temperature?

Condensate returning?

18

Every 10 Deg. F increase in FW temperature

= 1% increase in efficiency!

Page 19: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Motors

19

Page 20: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability

20

Page 21: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Impact Areas

21

Page 22: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

22

Page 23: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

23

Scanner

Page 24: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

24

Diffuser

Combustion Issue

Page 25: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

25

Fuel/Air Ratio Control

Problems• Slip

• Deflect

• Wear

Page 26: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

26

Unstable water level

Page 27: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

27

Nuisance shutdowns

Pump on

LWCO

Page 28: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

28

Liner tile

Throat tile

Page 29: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

Burner housing cracks or poor seals

29

Page 30: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Safety

30

Page 31: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Impact Areas

31

Page 32: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Electrical Power

32

Low Voltage High Voltage

Page 33: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

33

Page 34: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

34

Page 35: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

35

Lower half

Sight port w/cooling line

Page 36: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Water Level Controls

Auxiliary

36

Main

Gauge glass

Page 37: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Water Side Occurrence

37

Page 38: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Confined Spaces

38

Firetube Boiler Watertube Boiler

Page 39: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Safety Valve Piping

39

Page 40: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Solutions

40

Page 41: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Efficiency Solutions

41

Page 42: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Stack Temperature

42

Accurate thermometer

Page 43: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Stack Temperature

43

+ 40 Deg. F

= 1% Efficiency lost

Page 44: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reduce Cycling

Losses can reach 10 – 15%!

44

Page 45: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

High Turndown Burner

45

Page 46: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Fuel/Air Ratio Control

46

Single point

Page 47: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Fuel/Air Ratio Control

47

Parallel Positioning System

Page 48: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Excess Air Losses

OXYGEN TRIM SYSTEM

Compensates for atmospheric changes such as:

• Ambient temperature

• Relative humidity

• Barometric pressure.

48

Page 49: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Stack Economizers

• Noncondensing

• Full Condensing

49

Page 50: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Stack Economizers

• Noncondensing

• Full Condensing

50

Every 40 Degrees Gained = 1% Saved!

Page 51: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Returning Condensate

Deaerator

51

Every 10 degree increase = 1% Saved!

High pressure receiver

Page 52: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Electrical Draw

52

High Efficiency Motors?

Page 53: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Variable Frequency Drives

53

Page 54: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

VFD Analysis

No VFD

@ 100% = 100%

54

Page 55: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

VFD Analysis

No VFD

100% = 100%

W/VFD

@ 70% = 34%

@ 50% = 12.5%

55

Page 56: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Solutions

56

Page 57: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability

57

Page 58: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability

58

Neat & Clean

Page 59: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Boiler Room Equipment Record Keeping

Dynamic records• Start up and tuning reports

• Repair reports

• Inspection reports

• Chemical analysis reports

• Boiler room log

59

Page 60: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Solutions

Scanner

60

Burner

Diffuser BMS

Page 61: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Solutions

61

Throat Tile

Furnace Liner

Dry Oven

Page 62: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Reliability Issues

62

Page 63: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Water Treatment

63

Page 64: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Water Treatment

64

Page 65: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Safety

65

Page 66: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

66

Dryback Wetback

Page 67: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

67

Dryback Wetback

Page 68: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

68

Gun Burner Package Integral Burner Package

Page 69: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

69

Page 70: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Hot Surfaces

70

Page 71: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform
Page 72: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Safety Solutions

72

Page 73: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Electrical Safety

73

Page 74: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Safety Valve Piping

74

Page 75: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Cleaver-Brooks Boiler Room Log

75

Date

Time

Boiler #

Operator

Water visible in gauge glass

Combustion check (visual)

Steam pressure

Feedwater pressure

Feedwater temperature

Flue gas temperature

Burner

Gas pressure

Gas meter reading

Oil pressure (regulated)

Oil temperature

Oil meter reading

Atomizing air pressure

Ambient air temperature

Make-up water

Blowdown water column

Blowdown boiler

Comments/Observations

Chemical analysis

Steam

Note: record water analysis and treatment on separate log

Page 76: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Diligent Monitoring and Recording

76

Page 77: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Evaporation Test

77

Page 78: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

CB Level Master

Features• Low or no float movement

• High and low water alarming

• Column blowdown reminder

• Notes successful or unsuccessful

• LED readout of water level

• Test auxiliary without jumper wire

• Easy tie into PLC platform

78

Page 79: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Operator Training

Cleaver-Brooks “Boiler House” Milwaukee, WI

79

• On-site Tailored programs

• Regional seminars

• Online

Armstrong International Training Center

Page 80: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Troubleshooting and Repair

80

Page 81: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Prioritizing

• Efficiency

• Reliability

• Safety

81

Page 82: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Investing Capital Dollars

82

Everybody is vying for the same bag of

cash…

Normally a simple payback calculation…

Operation’s Guy Facility’s Guy

Page 83: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Investing Capital Dollars

Evaluating Cost & Value• NPV (Net Present Value)

• Time/value of money (opportunity)

• Discounted dollars

• Positive cash flow and/or profitability

• IRR (Internal Rate of Return)• Cost of capital including tax rate

• Hurdle rate

• Competing projects

83

Page 84: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Summary

• Single point positioning systems tend to wear causing poor fuel/air control. A

2% increase in O2 is a 1% loss in efficiency. A parallel positioning system can

remedy this problem.

• Excessive boiler cycling is a huge energy waster. A smaller boiler or high

turndown burner may be the answer.

• Reliability improvement starts with a clean and organized boiler room.

• Burner trips are mainly caused by fouled scanners and bouncing waterlines

due to improper water treatment or condensate fouling.

84

Page 85: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Summary

• The biggest contributors to unsafe boiler rooms are poor maintenance

procedures and low water cutoff failures. Operator Training is critical.

• Low voltage can kill!

• Safe boiler rooms have excellent boiler room policies & procedures which are

diligently followed including documentation.

• Justifying a capital spend goes beyond simple payback. Money has a

time/value component as well as various opportunities for its use. NPV and IRR

are critical methods for analyzing the investment for decisions & prioritizing

purposes.

85

Page 86: Steve Connor - cleaver-brooks.com Boiler Room Log 75 Date Time Boiler # Operator Water visible in gauge glass ... • Test auxiliary without jumper wire • Easy tie into PLC platform

Questions?