Top Banner
Copyright © Tendeka 2013. All rights reserved. [email protected] May 2013 Introduction to Step change improvements to established reservoir completion technology SPE Seminar : Inwell flow surveillance and control: new frontiers [email protected] October 2013
18

Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

May 20, 2018

Download

Documents

vuongcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

[email protected] May 2013

Introduction to

Step change improvements to

established reservoir

completion technology

SPE Seminar : Inwell flow

surveillance and control: new

frontiers

[email protected]

October 2013

Page 2: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

A Presentation of Two Technologies

• Inflow Control Devices

– Horizontal wells: permeability contrasts, fractures, frictional losses, thin oil columns, mobility variations

• Intelligent Completions

– Multiple horizons, horizontal wells: zonal heterogeneity, critical production management

Page 3: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Passive ICD System – viscosity “independent”

• Pressure drop a function of density and rate squared

Page 4: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Autonomous ICD – “A levitator” ??

• Bernoulli – “Sum of Static Pressure, Dynamic Pressure and Friction loss along a streamline is constant”

• Low viscosity - reduces friction pressure, causes high velocity thereby “sucking” the disc against the seat restricting flow

• High viscosity - increases friction pressure – pushing the disc away from the seat and thereby increasing flow

Page 5: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

0

5

10

15

20

25

30

35

40

0 0.5 1 1.5 2 2.5 3 3.5

Dif

fre

nti

al P

ress

ure

(b

ar)

Actual Flow Rate (m3/hour)

TR7 Characteristics - Oil, Gas and Water

Low viscosity -High DP !!

High viscosity - Low DP !!

Gas Control with Choked Flow !!

High viscosity - Valve is open

AICD – viscosity dependency in “reverse”

Page 6: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Performance Simulator – Oil to Gas

SPE 159634– Halvorsen et al.

Page 7: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Performance Simulator– Heavy Oil

Page 8: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Autonomous vs. Passive ICDs

Time to Breakthrough

Vis

cosity R

atio

Page 9: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Intelligent Completions – Cabled Systems

• Surface control systems

• Modified wellheads

• Control line flat packs

• Cable clamps

• Feedthrough packers

• Hydraulic ICV (n+1)

• Electrohydraulic ICV

(<=12)

9

• For

– High cost wells

– New fields

– Main bores

Courtesy SLB

Page 10: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Intelligent Completions – Wireless Systems

• Surface software

• Remote power

and control ICV

10

• For

– Mature fields

– Margin applications

– In laterals

– Liner deployment

– ERD

– Underbalanced

Page 11: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Applications

• Retrofit Intelligent Capability

• Marginal applications

Plug design - commingled production,

water shut-off

Straddle design – zonal control

Page 12: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Applications

• Branch monitoring and control

• Zonal lateral control

• Openhole or cased hole

Page 13: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Pressure Pulse Telemetry for Multi-phase Wells

Input Signal Received Pulse

Page 14: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Pressure Pulse Telegram

Page 15: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Power

• Independent power supply

• Low temperature applications

• Retrofit applications

• Well commissioning applications

HT Lithium batteries used as primary power supply

Page 16: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Power

• Each ICV has an independent

power supply

• Provides long service life in low

temperature applications

• Used for retrofit applications

where the batteries can be

replaced

• Used for high utilisation, well

commissioning applications

16

HT Rechargeable Lithium batteries

Page 17: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

ICDs with ICVs

• “Found to have the best well performance with maximum production and minimum water”

OTC 21910 – Lauritzen et al.

Page 18: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Thank-you

Questions please