    From: Vianney Tumwesige [[email protected]]

    Sent: Tuesday, 3 August 2010 1:05 AM

    To: You 

    Subject: Biogas in Mbarara (Uganda)

    Two large tanks were bought (one slightly smaller).

    The tanks were marked with Chalk prior to cutting

     Note: The digester being constructed here is

    a “Floating Drum” type digester and is“semi continuous” in that it will be fed

     plantain peelings and other waste on a daily

     basis. Some inoculum may be needed tointroduce the right microbes to generate

    methane.

    It is estimated that a unit such as this would

    take 2 people 4-6 hours to construct.

  • 8/18/2019 Step by Step Biogas Mbarara

    2/10

     

    One of the tanks' (the digester) was cut out to match the smaller gas holder tank.

  • 8/18/2019 Step by Step Biogas Mbarara

    3/10

     The Gas holder is made by removing the entire top

    A hot metal pipe is used to make the inlet and outlet holes (on opposite sides)

  • 8/18/2019 Step by Step Biogas Mbarara

    4/10

     

    Inlet (left, also acts as drain for emptying digester) and outlet (right) pipes are pre assembled

    Outlet pipe is fitted

  • 8/18/2019 Step by Step Biogas Mbarara

    5/10

     

    Fitting the inlet pipe

    Outlet pipe is finished

  • 8/18/2019 Step by Step Biogas Mbarara

    6/10

     The Digester is ready (from inlet side)

    Time to rest inside the digester (from top, showing inlet pipe)

  • 8/18/2019 Step by Step Biogas Mbarara

    7/10

     Bricks used to support the gas holder as it falls back (replaced by sand filled bottles below).

    Plastic bottles were used to support the inlet pipe, instead of clay burnt bricks!

  • 8/18/2019 Step by Step Biogas Mbarara

    8/10

     Filling the bottles

    Gas holder goes onto the digester

  • 8/18/2019 Step by Step Biogas Mbarara

    9/10

     Dr GW loved the job (here you ca see the inlet (right) and outlet (left). Gasholder not visible

     prior to filling.

    Sketch of supports for Inlet and Outlet pipes, held by a strap (use your imagination here!).

  • 8/18/2019 Step by Step Biogas Mbarara

    10/10

     Detail of the gas outlet, on the gas holder.

    Time to have a photo! It was a great job. I will test the gas after 14 days

    Share with a friend,

    Cheers

    --Vianney Tumwesige

    Kampala-Uganda

    You can make a difference donate www.hopeforfutureangels.org http://trustvianney.blogspot.com/ 

    "The more people are self sufficient in cooking fuel, the

    more personal and financial freedom they have." -Emma Casson