VOIDSPAN INSTALLATION GUIDE #W1 JET CLEANING AND WATER MANAGEMENT
John
Rectangle
John
Rectangle
John
Rectangle
John
Group
John
Text Box
Intent of Work- To stabilize dry-laid or partially mortared stone retaining wall construction by consolidating it with solidifying grout. Suitability- The work described herein is best suited for conditions where there is little or no binding mortar within mass stone retaining wall masonry and removal of remaining soil and mortar material will not cause a collapse (otherwise the wall will need to be laterally braced). Required Materials, Products and Equipment- VoidSpan 500 Series PHL Gravity Feed Grout or 600 Series PHLc70 Injection Grout Masonry mortar materials and potable water VoidSpan 1200 Series Jetting Wands VoidSpan 3000 Series Standpipe Piezometers (if utilized) VoidSpan 4000 Series Pressure Pot (or equivalent pressure regulating pump) with 5/8" ID feed lines (if utilized) Color matching repair mortar (if needed) Scope of work- 1. EXPOSE AND EVALUATE RETAINING WALL- A Geotechnical or Structural Engineer should be consulted for walls over four feet tall. Determine requirements and limits for Steps 3 to 6, 7 2. RE-SET FALLEN STONES- Dry set these or with concealed blobs of mortar 3. BRACE REMAINING WALL FACE IF NEEDED- See Step 1 4. JET CLEAN INTERIOR CAVITIES TO REMOVE SOIL- See Step 1 5. BRACE REMAINING WALL FACE IF NEEDED- See Step 1 6. JET CLEAN INTERIOR CAVITIES TO REMOVE SOIL- See Step 1 7. SEAL WALL FACE FOR GROUT- Utilized a grout proof removable material are recessed stay-in-place mortar 8. GROUT WALL STARTING FROM BOTTOM- See INSTALLATION GUIDES "G1, G2, G3" 9. CONTINUE TO GROUT FILL WALL 10. REMOVE TEMPORARY SEALER 11. INSTALL WEEP SYSTEM- See step 1 Responsibility- It is the responsibility of the Specifying Engineer to determine the specifics of the structural design and use of the VoidSpan Reinforcement System and to confirm its appropriateness for the application. Note that the details and suggested methods are presented herein as schematic representations only, and actual field conditions will vary. It is the responsibility of the System Installer to understand the requirements of the installation and execute the installation in a safe and correct manner.
John
Text Box
PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization.
John
Text Box
OUTLINE SPECIFICATION (See DETAILS on second page)
John Wathne
Text Box
JET CLEANING AND WATER MANAGEMENT- Installation Guide # W1
John Wathne
Text Box
© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800-966-VOID / www.voidspan.com
Page 2: Step- 1. EXPOSE AND EVALUATE RETAINING WALL Step- 2. …
John Wathne
Rectangle
John Wathne
Rectangle
John
Rectangle
John
Rectangle
John
Group
John
Text Box
Step- 1. EXPOSE AND EVALUATE RETAINING WALL
John
Text Box
Step- 2. RE-SET FALLEN STONES 3. BRACE REMAINING WALL FACE IF NEEDED 4. JET CLEAN INTERIOR CAVITIES TO REMOVE SOIL
John
Callout
Evaluate condition and stability of wall construction
John
Callout
Clean out cavities with VoidSpan J-1 or J-2 Pressure Washer Jetting Wands
John
Callout
Carefully remove vegetation and topsoil
John
Text Box
Finish- 9. CONTINUE TO GROUT FILL WALL 10. REMOVE TEMPORARY SEALER 11. INSTALL WEEP SYSTEM
John
Line
John
Callout
Fill core with VoidSpan PHLc Gravity Feed Grout or 70 Injection Grout in multiple low lifts
John
Line
John Wathne
Text Box
STONE RETAINING WALL CONSOLIDATION w/ PHLc GROUT
John Wathne
Text Box
Step- 5. BRACE REMAINING WALL FACE IF NEEDED 6. JET CLEAN INTERIOR CAVITIES TO REMOVE SOIL 7. SEAL WALL FACE FOR GROUT 8. GROUT WALL STARTING FROM BOTTOM
John Wathne
Arrow
John Wathne
Callout
Re-set fallen stones in proper position
John Wathne
Arrow
John Wathne
Callout
Brace wall if needed to retain stones if needed
John Wathne
Snapshot
John Wathne
PolyLine
John Wathne
PolyLine
John Wathne
PolyLine
John Wathne
Line
John Wathne
Text Box
© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800-966-VOID / www.voidspan.com
John
Callout
Low-pressure inject with VoidSpan Standpipe Piezometer
John Wathne
Callout
Gravity feed grout into wall, or
John Wathne
Callout
Seal wall face with removable insulation or clay, or recessed pigmented pointing
John Wathne
Callout
Continue to grout fill wall, working from bottom to top
John Wathne
Callout
Remove temporary sealing material
John Wathne
Callout
Core drill grouted wall and insert filtered drainage weeps
John Wathne
Text Box
JET CLEANING AND WATER MANAGEMENT- Installation Guide # W1