FO24 Issue 1 1. When mixing of paint and additives ensure that this is carried out fully to the manufacturers specification 2. Ensure all surfaces to be painted are suitable prepared clean and dry. Manual shot blasting of castings is mandatory. 3. Commence application of the primer coat firstly covering the most inaccessible areas of the valve taking care to produce an even thickness of coating over all surfaces of the valve. 4. Leave the valve sufficient time to dry. This time will be given in the paint manufacturers instruction 5. Repeat stages for all subsequent coating ensuring that at each stage the required drying times are maintained. Contrasting colours for each coat. 6. Inspect D.F.T. after curing of each coat. 7. After curing of final coat inspect D.F.T. to specific build thickness 8. Pack suitably for method of despatch. (See EVC Packing Procedure F025). 9. Coat 1 - two pack zinc rich Epoxy primer D.F.T. 50 - 90 mircons. Coat 2 - two pack high build Epoxy D.F.T. 75 - 100 microns Coat 3 - two pack Solvalitt Aluminium * top coat D.F.T. 50 microns Total D.F.T. 175 - 240 Microns 10. Finish colour. * Factory to confirm colours per coating. STEINBOCK VALVES Painting Specification
1

STEINBOCK VALVES Painting Specification

Feb 17, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STEINBOCK VALVES Painting Specification

FO24 Issue 1

1. When mixing of paint and additives ensure that this is carried out fully to themanufacturers specification

2. Ensure all surfaces to be painted are suitable prepared clean and dry. Manualshot blasting of castings is mandatory.

3. Commence application of the primer coat firstly covering the most inaccessibleareas of the valve taking care to produce an even thickness of coating over allsurfaces of the valve.

4. Leave the valve sufficient time to dry. This time will be given in the paintmanufacturers instruction

5. Repeat stages for all subsequent coating ensuring that at each stage therequired drying times are maintained. Contrasting colours for each coat.

6. Inspect D.F.T. after curing of each coat.

7. After curing of final coat inspect D.F.T. to specific build thickness

8. Pack suitably for method of despatch. (See EVC Packing Procedure F025).

9. Coat 1 - two pack zinc rich Epoxy primer D.F.T. 50 - 90 mircons.Coat 2 - two pack high build Epoxy D.F.T. 75 - 100 micronsCoat 3 - two pack Solvalitt Aluminium * top coat D.F.T. 50 microns

Total D.F.T. 175 - 240 Microns

10. Finish colour.

* Factory to confirm colours per coating.

STEINBOCK VALVES Painting Specification