Top Banner
Steel Bridge Projects in Minnesota Kevin Western | State Bridge Engineer October 26, 2021 mndot.gov/
18

Steel Bridge Projects in Minnesota

Mar 26, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Steel Bridge Projects in Minnesota

Steel Bridge Projects in Minnesota

Kevin Western | State Bridge Engineer

October 26, 2021

mndot.gov/

Page 2: Steel Bridge Projects in Minnesota

Recent Projects

Page 3: Steel Bridge Projects in Minnesota

TH 53 over Rouchleau Pit (69129)

• 3 span, continuous, haunched steel girder bridge

• 270’-480’-375’ span configuration

• Opened to traffic: September 2017

Page 4: Steel Bridge Projects in Minnesota

TH 53 over Rouchleau Pit (69129)

10/28/2021 mndot.gov 4

• Used Construction Manager/General Contractor (CMGC) delivery method

• Used additional steel weight in webs and flanges to cut down on fabrication cost

Page 5: Steel Bridge Projects in Minnesota

Red Wing Bridge (25033)

• TH 61 over the Mississippi River

• Minnesota-Wisconsin border bridge

• Delivered Design-Bid-Build with in-house design and WisDOT peer review

• Opened to traffic: November 2019

10/28/2021 mndot.gov 5

Page 6: Steel Bridge Projects in Minnesota

Red Wing (25033)

10/28/2021 mndot.gov 6

• Second steel tub girder bridge in Minnesota

• 221’-432’-292’ spans for steel tub unit

• Minimum depth is 8’-6”

• Maximum depth at piers is 13’-6”

Page 7: Steel Bridge Projects in Minnesota

Baudette (39016)

10/28/2021 mndot.gov 7

• TH 72 over Rainy River

• Border bridge between Minnesota and Ontario

• Haunched plate girder beams

• Opened to traffic: September 2020

Page 8: Steel Bridge Projects in Minnesota

Baudette (39016)

10/28/2021 mndot.gov 8

• 5 span structure

• 220’-300’-300’-300’-220’

• Web depth varies from 80” to 140”

Page 9: Steel Bridge Projects in Minnesota

Twin Ports Interchange

• I-35/I-535/US-53 interchange project in Duluth

• 3 new steel girder bridges (69902, 69904, 69905)

• Currently under construction

• First steel girders estimated to be set in January 2022

10/28/2021 mndot.gov 9

Page 10: Steel Bridge Projects in Minnesota

Twin Ports Interchange

Bridge Number Span Configuration Web Depth

69902 230’-221’-163’-188’ 90”

69904 183’-154’-182’-181’-180’-154’ 72”

69905 195’-221’ 87”, 93”

10/28/2021 mndot.gov 10

Page 11: Steel Bridge Projects in Minnesota

Potential Projects

Page 12: Steel Bridge Projects in Minnesota

494

• 494 Design Build Project

• Flyover ramp bridge

• 35W NB to 494 WB

• 9289 replacement

• CP Rail over 494

• Through girder

10/28/2021 mndot.gov 12

Page 13: Steel Bridge Projects in Minnesota

Moorhead

• CMGC Moorhead Grade Separation (14016)

• BNSF over 11th Street North

• Could be single span or three span

• Proposed letting January 2023

10/28/2021 mndot.gov 13

Single Span Option Three Span Option

Page 14: Steel Bridge Projects in Minnesota

Moorhead

• CMGC Moorhead Grade Separation (14017)

• BNSF over 11th Street North

• Could be single span or three span

• Proposed letting January 2023

10/28/2021 mndot.gov 14

Single Span Option Three Span Option

Page 15: Steel Bridge Projects in Minnesota

Osceola

• TH 243 over the St. Croix River

• Border bridge with Wisconsin

• 3 span welded plate girder

• 2025 Letting

10/28/2021 mndot.gov 15

Page 16: Steel Bridge Projects in Minnesota

Blatnik

• Blatnik Bridge Replacement

• I-535 over the St. Louis River

• Currently, in alternative development

• Approach spans could be plate girders

10/28/2021 mndot.gov 16

Page 17: Steel Bridge Projects in Minnesota

Blatnik – One of many Alternatives

17

Page 18: Steel Bridge Projects in Minnesota

Thank You!

Kevin Western

[email protected]

651-366-4501