    AASHTO/NSBA Steel Bridge Collaboration

    S 4.1 - 2002

    Steel Bridge Fabrication QC/QA Guide Specification

    AASHTO/NSBA Steel Bridge Collaboration

    BR

    IDGE

    ALLIAN

    CE

    NATI

    ONAL STEE

    L

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    2/35

    Preface

    This document is a standard developed by the AASHTO/NSBA Steel Bridge Collaboration. The

    primary goal of the Collaboration is to achieve steel bridges of the highest quality and value

    through standardization of the design, fabrication, and erection processes. Each standard

    represents the consensus of a diverse group of professionals.

    As consensus documents, the Collaboration standards represent the best approach to the

    processes they cover. It is intended that Owners adopt and implement Collaboration standards in

    their entirety to facilitate the achievement of standardization, but it is understood that local

    statutes or preferences may prevent full adoption for some. In such cases Owners should adopt

    these documents with the exceptions they feel are necessary.

    This document establishes and defines the functions, operations, requirements, and activities

    needed to achieve consistent quality in steel bridges. It is based on a cooperative approach to

    achieving quality, where both the Owners and Contractors Inspectors work together with a

    clear understanding of their roles and responsibilities, resulting in steel bridges completed in a

    timely manner and meeting all contractual requirements

    Disclaimer

    All data, specifications, suggested practices presented herein, are based on the best available

    information and delineated in accordance with recognized professional engineering

    principles and practices, and are published for general information only. Procedures and

    products, suggested or discussed, should not be used without first securing competent advice

    respecting their suitability for any given application.

    Publication of the material herein is not to be construed as a warranty on the part of the

    American Association of State Highway and Transportation Officials (AASHTO) or the

    National Steel Bridge Alliance (NSBA) - or that of any person named herein - that these data

    and suggested practices are suitable for any general or particular use, or of freedom frominfringement on any patent or patents. Further, any use of these data or suggested practices

    can only be made with the understanding that neither AASHTO nor NSBA makes any

    warranty of any kind respecting such use and the user assumes all liability arising therefrom.

    AASHTO Document No: SBFQC-1

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    3/35

    EXECUTIVE COMMITTEE

    20012002

    Voting Members

    Officers:

    President: James C. Codell III, Kentucky

    Vice President: Tom Stephens, Nevada

    Secretary-Treasurer: Larry King, Pennsylvania

    Regional Representatives:

    REGION I: Carol Murray, New Hampshire, One-Year Term

    Patricia McDonald, Vermont, Two-Year Term

    REGION II: Fred Van Kirk, West Virginia, One-Year Term

    Whitting Clement, Virginia, Two-Year Term

    REGION III: Henry Hungerbeeler, Missouri, One-Year Term

    Mark Wandro, Iowa, Two-Year Term

    REGION IV: Mike Behrens, Texas, One-Year Term

    Sleeter Dover, Wyoming, Two-Year Term

    Non-Voting Members

    Immediate Past President: Dan Flowers, Arkansas

    AASHTO Executive Director: John Horsley, Washington, D.C.

    i

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    4/35

    HIGHWAY SUBCOMMITTEE ON BRIDGES AND STRUCTURES2002

    Tom Lulay, Oregon, ChairmanSandra Larson, Vice Chairman

    James D. Cooper, Federal Highway Administration, Secretary

    ALABAMA, William F. Conway, George H. Connor

    ALASKA, Richard A. Pratt

    ARIZONA, F. Daniel Davis

    ARKANSAS, Phil Brand

    CALIFORNIA, Richard Land

    COLORADO, Mark A. Leonard

    CONNECTICUT, Gordon Barton

    DELAWARE, Doug Finney, Dennis OShea

    D.C., Donald Cooney

    FLORIDA, William N. Nickas

    GEORGIA, Paul Liles, Brian SummersHAWAII, Paul Santo

    IDAHO, Matthew M. Farrar

    ILLINOIS, Ralph E. Anderson

    INDIANA, Mary Jo Hamman

    IOWA, Norman L. McDonald

    KANSAS, Kenneth F. Hurst, Loren R. Risch

    KENTUCKY, Stephen E. Goodpaster

    LOUISIANA, Hossein Ghara, Mark J. Morvant

    MAINE, James E. Tukey

    MARYLAND, Earle S. Freedman

    MASSACHUSETTS, Alexander K. Bardow

    MICHIGAN, Steve Beck

    MINNESOTA, Dan Dorgan, Kevin Western

    MISSISSIPPI, Harry Lee James

    MISSOURI, Shyam Gupta

    MONTANA, William S. Fullerton

    NEBRASKA, Lyman D. Freemon

    NEVADA, William C. Crawford, Jr.

    NEW HAMPSHIRE, Mark Richardson

    NEW JERSEY, Harry A. Capers, Jr.,

    Richard W. Dunne

    NEW MEXICO, Jimmy D. Camp

    NEW YORK, James O'Connell, George A. Christian

    NORTH CAROLINA, Gregory R. Perfettie

    NORTH DAKOTA, Terry UdlandOHIO, Timothy Keller

    OKLAHOMA, Robert J. Rusch, Veldo Goins

    OREGON, Mark E. Hirota

    PENNSYLVANIA, R. Scott Christie

    PUERTO RICO, Jamie Cabre

    RHODE ISLAND, Kazem Farhoumand

    SOUTH CAROLINA, Randy R. Cannon, Jeff Sizemore

    SOUTH DAKOTA, John Cole

    TENNESSEE, Ed Wasserman

    TEXAS, Mary Lou Ralls

    U.S. DOT, Nick E. Mpras

    UTAH, David Nazare

    VERMONT, James McCarthy

    VIRGINIA, Malcolm T. Kerley

    WASHINGTON, Jerry Weigel, Tony M. AllenWEST VIRGINIA, James Sothen

    WISCONSIN, Stanley W. Woods

    WYOMING, Gregg C. Fredrick, Keith R. Fulton

    ALBERTA, Dilip K. Dasmohapatra, Bob Ramsey

    MANITOBA, Ismail Elkholy

    NORTHERN MARIANA ISLANDS,

    John C. Pangalinan

    NEW BRUNSWICK, David Cogswell

    NORTHAMPTON, R. T. Hughes

    NORTHWEST TERRITORIES, John Bower

    NOVA SCOTIA, Alan MacRae, Mark Pert

    ONTARIO, Vacant

    SASKATCHEWAN, Herv Bachelu

    MASS. METRO. DIST. COMM., David Lenhardt

    N.J. TURNPIKE AUTHORITY, Richard Raczynski

    N.Y. STATE BRIDGE AUTHORITY,

    William Moreau

    PORT AUTHORITY OF N.Y. AND N.J.,

    Joseph J. Kelly, Joseph Zitelli

    BUREAU OF INDIAN AFFAIRS, Wade Casey

    MILITARY TRAFFIC MANAGEMENT

    COMMAND, Robert D. Franz

    U.S. ARMY CORPS OF ENGINEERS-

    DEPARTMENT OF THE ARMY,

    Paul C. T. TanU.S. COAST GUARD, Jacob Patnaik

    U.S. DEPARTMENT OF AGRICULTURE-

    FOREST SERVICE, Nelson Hernandez

    ii

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    5/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Table of Contents

    Introduction ..................................................................................................................................... 1

    Part A General.............................................................................................................................. 2

    Section 1: Definitions................................................................................................................... 21.1 Contractor ....................................................................................................................... 2

    1.2 Engineer .......................................................................................................................... 2

    1.3 Fabricator ........................................................................................................................ 21.4 Inspection ........................................................................................................................ 2

    1.5 Owner .............................................................................................................................. 2

    1.6 Quality Assurance (QA).................................................................................................. 21.7 Quality Assurance Inspector (QAI)................................................................................. 2

    1.8 Quality Assurance Plan (QAP) ....................................................................................... 3

    1.9 Quality Control (QC) ...................................................................................................... 31.10 Quality Control Inspector (QCI)..................................................................................... 3

    1.11 Quality Control Plan (QCP)............................................................................................ 3

    1.12 Spot Inspection ............................................................................................................... 3

    Section 2: Responsibilities ........................................................................................................... 42.1 Team Effort ..................................................................................................................... 4

    2.2 Fabricator ........................................................................................................................ 4

    2.3 Owner .............................................................................................................................. 42.4 Prefabrication Meetings .................................................................................................. 5

    Section 3: Qualifications and Equipment..................................................................................... 6

    3.1 QCI and QAI Fabrication Inspection Experience ........................................................... 6

    3.2 QCI and QAI Coatings Inspection Experience ............................................................... 63.3 Recommended Inspection Equipment............................................................................. 6

    Part B Quality Control.................................................................................................................. 8

    Section 4: General ........................................................................................................................ 8

    4.1 Quality Control Plan........................................................................................................ 84.2 QAI Facilities .................................................................................................................. 8

    4.3 Inspection and Testing Equipment.................................................................................. 9

    4.4 Control of raw materials.................................................................................................. 94.5 Welding Procedures and Consumables ........................................................................... 9

    4.6 Nondestructive Examination........................................................................................... 9

    4.7 Nonconformance Control.............................................................................................. 10

    Section 5: Certifications and Qualifications............................................................................... 115.1 QCP Requirements........................................................................................................ 11

    5.2 Fabricator Certifications................................................................................................ 11

    5.3 QCI Certifications and Qualifications........................................................................... 115.4 Welder/Welding Operator Qualifications ..................................................................... 11

    Section 6: Documentation .......................................................................................................... 13

    6.1 QCP Requirements........................................................................................................ 13

    6.2 Records.......................................................................................................................... 136.3 Material Traceability..................................................................................................... 13

    iii

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    6/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 7: Inspection Procedures ............................................................................................... 14

    7.1 QCP Requirements for Inspection................................................................................. 147.2 Preparation of Material.................................................................................................. 14

    7.3 Fitting ............................................................................................................................ 14

    7.4 Welding ......................................................................................................................... 14

    7.5 Cambering, Curving and Straightening......................................................................... 157.6 Shop Assembly of Main Members................................................................................ 15

    7.7 Cleaning ........................................................................................................................ 157.8 Coating .......................................................................................................................... 15

    7.9 High-Strength Fastener Shop Installation ..................................................................... 16

    7.10 Loading and Shipping of Fabricated Members ............................................................ 16

    Part C Quality Assurance ........................................................................................................... 17

    Section 8: General ...................................................................................................................... 178.1 Qualifications of the QAI.............................................................................................. 17

    8.2 Scheduling..................................................................................................................... 17

    Section 9: QAI Responsibilities ................................................................................................. 189.1 Role of the QAI............................................................................................................. 18

    9.2 Interaction with the Fabricator Quality Control Inspector ............................................ 18

    9.3 Interaction with the Engineer ........................................................................................ 189.4 Interpretation of the Contract ........................................................................................ 18

    9.5 Fabrication Observation ................................................................................................ 18

    9.6 Nonconforming Materials and Workmanship............................................................... 18

    9.7 Final Acceptance of the Work....................................................................................... 19

    Section 10: Documentation and References............................................................................... 20

    10.1 Familiarization with Requirements............................................................................... 20

    10.2 Required Documents .................................................................................................... 20

    10.3 Use of Non-Approved Shop Drawings......................................................................... 2010.4 Quality Assurance Inspector Records and Reporting................................................... 2110.5 Mill Test Reports .......................................................................................................... 21

    Section 11: Quality Assurance Functions .................................................................................. 23

    11.1 Inspection of Raw Materials......................................................................................... 23

    11.2 Inspection of Fabricated Members ............................................................................... 2311.3 Assembly ...................................................................................................................... 24

    11.4 Welding......................................................................................................................... 24

    11.5 Use of Approved Welding Consumables ..................................................................... 2511.6 Nondestructive Evaluation............................................................................................ 25

    11.7 Coatings ........................................................................................................................ 2511.8 Bolting .......................................................................................................................... 2611.9 Final Inspection and Loading for Shipment ................................................................. 26

    Commentary.................................................................................................................................. 27

    iv

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    7/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Introduction

    This document is divided into three parts:

    Part A: General Describes general requirements and guidelines applicable to both Ownersand Fabricators.

    Part B: Quality Control Includes minimum requirements for a Fabricators quality controlprogram, with emphasis on the development and implementation of a quality control plan. The Fabricator should have one plan for all work, comprehensive enough to

    address all of the points covered in Part B, but flexible enough to apply to the variety of

    projects that will be fabricated. The Fabricator may want to include addenda to addressspecialty work.

    Fabricators should provide a copy of their quality control plan to Owners to build the

    Owners confidence in the Fabricators means and method for achieving work that will

    satisfy Contract requirements. Owners may offer comments to the Fabricator about theplan as appropriate.

    However, the Owner must recognize that successful implementation of the plandepends on keeping the plan simple and flexible so that it may apply effectively to the

    wide variety of projects undertaken in the shop. Fabricators should not have to rewrite aplan for each project or for each Owner.

    Part C: Quality Assurance Includes minimum requirements for an Owners qualityassurance program. The Owner may implement Part C as a quality assurance plan

    directly. Future Collaboration work will include a Quality Assurance Practice that

    will provide more detail about the work to be performed by the quality assuranceInspector.

    Should conflicts arise between any requirements in this manual and the Contract documents, the

    Contract documents take precedence in all instances.

    1

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    8/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Part A General

    Section 1Definitions

    Terms used in this document are in accordance with the AASHTO/NSBA Steel BridgeCollaboration standards. Terms that are specifically significant to this document are defined

    below.

    1.1 Contractor

    The Contractor is responsible for proper completion of all tasks required by the Contract.Subcontractors, including fabricators, erectors, and field painters, may be used by the

    Contractor, but the Contractor retains responsibility for all material, operations, and the

    final product. The Contractor should permit direct subcontractor interaction with the Ownerto expedite the project, but subcontractors must inform the Contractor of any proposed

    modifications to Contract requirements accepted by the Owner.

    1.2 EngineerIn this document, the Engineer is the Owners authorized representative, responsible formonitoring of the Fabricators work, and other duties and responsibilities detailed by the

    Owner. The Engineer has the authority to allow exceptions to Contract document

    requirements.

    1.3 Fabricator

    In this document, Fabricator refers to the facility(ies) performing such shop activities as

    cutting, welding, drilling, punching, cleaning and painting of structural steel. Fabricator

    also includes any agents of the Fabricator, such as those who prepare shop detail drawings.In some cases the Fabricator may also be the Contractor, but usually the Fabricator is a

    subcontractor.

    1.4 Inspection

    The examination by the Owner or the Fabricator of processes and products to verify

    conformance with Contract requirements.

    1.5 Owner

    In this document, Owner refers to the entity paying the Contractor to fulfill the terms ofthe Contract. The Owner also encompasses the following: those preparing the Contract

    documents, including those responsible for the structures adequate design; and those

    authorized to represent the Owner during construction, commonly called the Engineerand the Inspector. The Engineer and Inspector may be employees either of the Owner or

    of professional firms contracted for the work.

    1.6 Quality Assurance (QA)

    Quality assurance encompasses the activities undertaken by the Owner to verify that thefinal product satisfies Contract requirements, including verifying that quality control is

    performed effectively.

    1.7 Quality Assurance Inspector (QAI)

    The Owners representative responsible for duties specified in the Quality Assurance Plan,with the authority to accept work that meets Contract requirements.

    2

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    9/35

    Steel Bridge Fabrication QC/QA Guide Specification

    1.8 Quality Assurance Plan (QAP)

    The formal written document (based on Part C of this standard) that establishes theactivities the QAI will follow to monitor fabrication and verify that specified criteria are

    achieved.

    1.9 Quality Control (QC)

    The activities undertaken by the Contractor/Fabricator to ensure a product is provided thatmeets Contract requirements.

    1.10 Quality Control Inspector (QCI)

    A qualified employee of the Fabricator who performs inspection as defined by theFabricators Quality Control Plan.

    1.11 Quality Control Plan (QCP)

    The formal written document (based on Part B of this standard) prepared by the Fabricator

    that describes the policies and procedures used to verify that fabricated steel will satisfy theContract requirements.

    1.12 Spot Inspection

    The random examination of the Fabricators processes or products for verification of

    conformance with Contract requirements.

    3

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    10/35

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    11/35

    Steel Bridge Fabrication QC/QA Guide Specification

    2.3.9 The QAI will not direct the Fabricators work. However, the QAI should advise the

    Fabricator to discontinue any operation that would result in noncompliance with theContract.

    2.3.10 The QAI will direct all official communications to the Fabricators quality control

    or management.

    2.3.11 The QAI will not convey directives or personal judgments about overall shopquality or concerns about employee competence to production personnel.

    2.3.12 The QAI will not divulge a fabricators proprietary information to anotherfabricator.

    2.3.13 The QAI will not publish, copy or distribute any proprietary information,

    documents, or forms received from the Fabricator for any purpose other than thecontractual needs of the Owner.

    2.4 Prefabrication Meetings

    Prefabrication meetings facilitate effective quality control and quality assurance and should

    be conducted as described in section 2.4 of AASHTO/NSBA Steel Bridge CollaborationS2.1, Steel Bridge Fabrication Guide Specification.

    5

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    12/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 3Qualifications and Equipment

    3.1 QCI and QAI Fabrication Inspection Experience

    3.1.1 In addition to the certification requirements of 5.3 and 8.2, the following minimum

    years of experience in steel bridge fabrication are recommended:

    Project Type

    Minimum Recommended

    Years of Experience

    Rolled beam bridges 1 year

    Welded plate girders (I sections, box sections, etc.) 2 years

    Complex structures, such as trusses, arches, cable-stayed bridges, and moveable bridges

    3 years

    Fracture critical (FC) members 3 years

    3.1.2 Inspectors who have less experience than that specified in 3.1.1 should work under

    the guidance of an inspector having those qualifications.

    3.1.3 Experience in rolled beam bridge inspection should not be counted towards the

    experience needed for plate girders, complex structures, or fracture-criticalmembers.

    3.1.4 Every inspector must be proficient with inspection of the typical fabrication

    processes described in Section 7 of this document.

    3.2 QCI and QAI Coatings Inspection Experience

    3.2.1 Documented training in materials preparation, coatings application, and inspection

    is required for the QC and QA coatings inspectors. Acceptable training includes oneor more of the following:

    American Institute of Steel Construction (AISC) Application and Inspection ofSophisticated Coatings

    National Association of Corrosion Engineers (NACE) - International Coating

    Inspector training and Certification Program Session I: Coating InspectionTraining

    Society for Protective Coatings (SSPC) - C-1 Fundamentals of Protective

    Coatings for Industrial StructuresNational Highway Institute (NHI) - Bridge Coating Inspection Course No. 13079

    Other training acceptable to the Engineer.

    3.2.2 The QA and QC coatings inspectors should each have at least one year ofexperience in surface preparation and painting inspection. Inspectors who have lessexperience should work under the guidance of an inspector having those

    qualifications.

    3.3 Recommended Inspection Equipment

    The following equipment is recommended for the QAI and QCI:

    sling psychrometer

    tape measure, 25 ft. (7 m), 1/32 or 1-mm increments.bevel gauge

    6

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    13/35

    Steel Bridge Fabrication QC/QA Guide Specification

    blast profile comparator or replica tape for direct measurements and a permanent record

    camera, QAI to use only with the approval of the Fabricator, digital recommendeddry film thickness gauge

    feeler gauges

    fillet weld gauges

    flashlight and spare batteriespocket metal ruler(s), 1/32 or 1-mm increments

    metal tape measure, 100 ft. (30 m), 1/8-inch or 0.01-ft (5-mm) incrementsmicrometer

    NDE tools, if applicable

    skewed fillet weld gaugesurface roughness gauges for machine and flame cutting

    (Ref. ANSI B41 or AWS C4.1-G)

    temperature-indicating crayons for 30F (15C) above and below desired temperatures orsurface pyrometer

    thermometers for determining air, paint and metal surface temperatures

    undercut gaugemirror for examining restricted access areas (such as snipes)

    tools for checking surface anomalies, coating adhesion, etc.

    surface profile comparator for media (sand, shot or grit) used and/or deformable replica

    tape and micrometer to check profile depth before coating.

    7

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    14/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Part B Quality Control

    Section 4General

    Part B of this standard describes the minimum quality control requirements for a steel bridgeFabricator. The requirements form the basis for the Fabricators QCP.

    4.1 Quality Control Plan

    4.1.1 Prepare, maintain, and follow a QCP that details the QC procedures, personnel,

    policies, equipment, and records used during planning, ordering, fabrication,inspection, cleaning, painting, and shipping of fabricated members.

    4.1.2 The QCP shall describe the means and methods for ensuring satisfactory materials

    and workmanship, including the following: procurement, maintenance and calibration of testing equipment and supplies

    needed for inspection, measurement, and tests (see 4.3)

    conformance of all raw materials to Contract requirements (see 4.4)preparation and use of welding procedure specifications (WPSs) and control of

    welding consumables (see 4.5)

    proper performance of nondestructive examination (NDE) (see 4.6)handling of nonconformances, including use of standard shop repair methods and

    preapproved procedures for weld repairs (see 4.7)

    use of the latest approved version of shop drawings and approved fabricationprocedures

    other required means and methods described in Sections 5, 6 and 7.

    4.1.3 Provide the signature of the Quality Control Manager indicating the Fabricators

    intent and commitment to implement the QCP to achieve a quality product.4.1.4 Include a statement signed by the Fabricators management affirming that all

    personnel will implement the QCP to achieve quality.

    4.1.5 Describe the Fabricators organization, including the following:clearly established lines of authority

    position titles and the names of the individuals assigned to the positions

    functions and duties of each position.4.1.6 Describe the structure of the QC Department. Include an organization chart

    showing the functions, duties, responsibilities, position titles and lines of authority

    within the QC department.4.1.7 Describe in detail the responsibilities of QCIs, including inspecting material,

    welding, assembly, coating preparation and application, and nondestructive

    examination.

    4.2 QAI Facilities

    4.2.1 Provide and maintain office facilities for QAIs that ensure a reasonable amount of

    privacy and that are clean, properly illuminated, heated or air-conditioned as

    necessary, and reasonably free of shop noise, dust, and odors.4.2.2 Locate the office reasonably close to the work and provide access any time

    fabrication is in progress.4.2.3 Provide a desk, chair, and secure storage (e.g., locking file cabinet) for each

    inspector.

    8

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    15/35

    Steel Bridge Fabrication QC/QA Guide Specification

    4.2.4 Provide a telephone within the office with an outside line suitable for modem

    communication.4.2.5 Provide ready access to the following:

    clean, Fabricator-maintained restrooms

    fax and copy machines

    adequate parking.4.3 Inspection and Testing Equipment

    4.3.1 Check and calibrate testing equipment in accordance with applicable standards.

    4.3.2 Maintain calibration records readily accessible by the QAI.

    4.4 Control of raw materials

    4.4.1 Inspect all incoming raw materials.

    4.4.2 Verify that no repairs have been performed at the producing mill except grinding or

    welded repairs as allowed in ASTM A 6. Fracture-critical materials must notinclude any welded repairs unless authorized in writing by the Owner.

    4.4.3 Verify material surface quality prior to start of fabrication.

    4.4.4 Establish:inspection points (locations)

    responsible party for inspection

    acceptance criteriaprocedures to repair defects.

    4.5 Welding Procedures and Consumables

    4.5.1 Establish procedures for welding control that address the following:

    responsible parties for welding of test plates, witnessing and documentingwelding parameters, preparing specimens, conducting testing, and preparing the

    reports

    format and use of forms, including the system for numbering or identifying

    WPSsresponsible party to prepare and submit WPSs for approval

    distribution of the approved WPSs in the fabricating shop

    use of the approved WPSs by production and QC personnel

    procedure for revision of WPSs.4.5.2 Establish procedures for control of welding consumables that address the following:

    use of approved consumables

    warehouse storage, including inventory and stock rotationstorage in the fabricating shop of consumables used for welding fracture-critical

    and non-fracture-critical members

    procedures for holding and re-drying shielded metal arc welding (SMAW)

    electrodescontrol for time out of storage oven of SMAW electrodes

    drying and recycling of submerged arc welding (SAW) fluxstorage of SAW flux and electrodes

    storage and moisture control for flux-cored arc welding (FCAW) electrodes

    storage of gas metal arc welding (GMAW) electrodes.

    4.6 Nondestructive Examination

    4.6.1 Establish and follow a practice that conforms to AASHTO/AWS D1.5, BridgeWelding Code, and applicable American Society of Nondestructive Testing (ASNT)

    9

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    16/35

    Steel Bridge Fabrication QC/QA Guide Specification

    SNT-TC-1A requirements for each NDE method employed in the shop. Include the

    following:identification of a certified ASNT Level III in the applicable method(s)

    a written practice approved by the Level III

    ASNT Level II certification of practicing inspectors in the applicable method(s)

    ASTN Level I certification of apprentice inspectors, with proper Level IIoversight

    applicable code requirements for procedures.4.6.2 Where contracted services are used for NDE, ensure that the NDE agencys staff

    also satisfies the applicable ASNT requirements.

    4.6.3 Provide a copy of the written NDE practices to the Owner upon request.4.6.4 Make NDE training and certification records available for the Owners review.

    4.6.5 Permit QAI access to the Fabricators testing facilities and records upon request.

    4.7 Nonconformance Control

    4.7.1 Establish and maintain an effective system for controlling nonconforming material,including procedures for identification, isolation, and disposition.

    4.7.2 Establish standard shop repair methods. Standard repair welding procedures mustbe preapproved by the Owner.

    4.7.3 Describe the equipment, inspections, reports, and systems necessary to segregate

    materials requiring corrective work.

    4.7.4 Follow these steps when a problem is identified that will require a repair approvedby the Engineer:

    Determine the cause for the defect

    Initiate appropriate action to prevent additional deficiencies.Submit a written proposal to the Engineer documenting the situation, suggesting

    corrective actions for repairs or replacement, and, if applicable, recommendingalternate methods for subsequent production to avoid further defects.

    Provide the QAI with copies of appropriate correspondence.Be prepared to provide support information if requested by the Engineer.Notify the Contractor as required.

    4.7.5 Reclaim or rework nonconforming materials only in accordance with procedures

    acceptable to the Owner.

    10

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    17/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 5Certifications and Qualifications

    5.1 QCP Requirements

    5.1.1 Describe the plants level of AISC certification (see 5.2).

    5.1.2 Describe certification and qualification requirements for all QCIs (see 5.3).5.1.3 Describe procedures for qualifying tackers, welders, and welding operators and for

    updating and maintaining their qualification documentation (see 5.4).

    5.2 Fabricator Certifications

    5.2.1 Certification by AISC in the category appropriate for the type of work beingperformed is required. These categories include:

    Simple Steel Bridge Structures (Sbr) - Required for overhead sign trusses, bridge

    parts such as cross frames, and for un-spliced rolled beam bridges

    Major Steel Bridges (Cbr) - Required for all bridges other than unspliced rolled

    beam bridges

    Fracture Critical (F) - Required for fabrication of fracture critical members

    Sophisticated Paint Endorsement (P) - Required for shop priming or shopapplication of multi-coat systems to steel components (see applicable coating

    specification for exceptions). The Society for Protective Coatings SSPC-QP 3,Standard Procedure for Evaluating Qualifications of Shop Painting Contractors,

    may be substituted for the AISC Sophisticated Paint Endorsement.

    5.2.2 Resolve any findings noted in the AISC exit interview reports prior to fabrication.5.2.3 Allow the Owner to review the AISC or SSPC certification records upon request.

    5.2.4 If Owner acceptance is required by the Contract, allow formal review of operations

    by the Owner and secure acceptance prior to fabrication.

    5.3 QCI Certifications and Qualifications

    5.3.1 A QCI performing welding inspection must be a Certified Welding Inspector (CWI)or equivalent, in accordance with theBridge Welding Code.

    5.3.2 QCIs performing NDE must have either an ASNT Level II certification or a Level Icertification with Level II oversight for the NDE method being applied, in

    accordance withBridge Welding Code requirements.

    5.3.3 QCIs for coatings must be qualified in accordance with Section 3.

    5.4 Welder/Welding Operator Qualifications

    5.4.1 Document and maintain the following as a minimum:

    the name of the department or position responsible for administering and

    maintaining documentation on the qualification test programthe extent to which independent testing laboratories will be employed in

    qualificationthe extent to which the QC department will be involved in qualificationthe responsible party for selecting and testing qualification plates, authentication

    of test reports, and the disposition of specimens

    appropriate forms and recordsfabricator method for documenting continuing experience (see the Period of

    Effectiveness portion of theBridge Welding Code)

    the Fabricators master list of qualified welders, welding operators, and tackwelders

    11

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    18/35

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    19/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 6Documentation

    6.1 QCP Requirements

    6.1.1 Describe procedures for maintaining records (see 6.2).

    6.1.2 Describe handling and control of material certifications, mill test reports (MTRs),and other records required for material or weld traceability and verification (see6.3).

    6.1.3 Identify shop personnel responsible for preparation of records and reports.

    6.1.4 Include sample forms.

    6.2 Records

    6.2.1 Maintain current and complete records of inspections, measurements, and tests.

    Shop drawings or standard detail drawings may be used to document inspection.6.2.2 Make records available to the QAI during all work periods.

    6.2.3 Document, report, and keep records of reportable nonconformances. (Minor

    grinding, paint repairs, etc. do not require documentation.) For nonconformance

    reports, include at least:the number, location, and type of deficiencies found

    the nature and frequency of any repairs and corrective actions takena summary of the dispositions (corrected and approved, or rejected)

    6.2.4 For items that require full or partial shop assemblies, submit to the QAI signed

    reports of required measurements, indication of compliance or deviations noted, andpictures if available.

    6.2.5 Provide test reports and summaries of all required NDE to the QAI.

    6.3 Material Traceability

    6.3.1 Review MTRs for specification compliance and for accuracy, completeness, and

    specific project applicability before submittal.6.3.2 Control, identify, and reproduce MTRs for steel materials used from the

    Fabricators stock or from warehouse purchases. Include the MTRs in the projectfile and provide them to the Engineer or QAI as requested.

    6.3.3 Identify and trace material for primary members throughout fabrication.

    6.3.4 Correlate mill-identified materials with shop drawing piece marks, and supply acopy of this information to the QAI.

    13

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    20/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 7Inspection Procedures

    This section includes general requirements for the QCP (7.1) and then a series of points that mustbe addressed in the QCP (7.2 through 7.10)

    7.1 QCP Requirements for Inspection

    7.1.1 Define quality control actions to address all points listed in 7.2 through 7.10. For

    some points, quality control may require formal, documented inspection activitiesby the QCI, but for others informal monitoring activities conducted by production

    personnel may suffice, provided:formal quality control is not required by Contract

    production personnel are trained in acceptance criteria

    production personnel are trained to be responsible for evaluating the work andnoting noncompliance items

    the QCI will perform spot inspection of the work.

    7.1.2 If applicable, include the inspection or monitoring frequency established by the

    fabricator for all points in 7.2 through 7.10. The extent of monitoring may be lessthan 100% provided its basis considers the following criteria:

    the potential effects of undiscovered deficiencies incorporated in the finalstructure

    the production delays and possible problems caused by stopping processes for

    inspection hold pointsthe demonstrated consistency or variability of the process

    recent history of documented nonconformance.

    7.1.3 Describe QCI record-keeping. For inspection, records must be detailed and must beinitialed by QCIs indicating conformance with Contract requirements. Monitoring

    of quality by production personnel does not require record-keeping, but a general

    record must be made of the QCIs inspections.

    7.2 Preparation of Material

    Identification and marking of materials

    Quality of cut and sheared edgesPlate quality, with notation of surface and internal defects and repairNDE requirements and acceptance criteria for repairs

    Dimensional accuracy of component parts, whether fabricated or premanufactured

    7.3 Fitting

    Dimensional accuracy and fit of all componentsSpecified tolerance of members prior to welding

    Mill to bear and tight fit conditions

    7.4 Welding

    Cleanliness (absence or condition of unacceptable mill scale, rust, or contaminants)Joint preparation

    Properly cleaned tack welds of suitable quality and size

    Use of approved welding proceduresWeld quality and soundness requirements perBridge Welding Code

    Welders qualified for process and position to be welded

    Interpass cleaning and temperature

    14

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    21/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Weld backgouging and cleaning

    Fillet weld size, placement and profileGroove weld reinforcement

    Grinding or finishing of welds

    Avoiding, precompensating for, and correcting welding-induced distortion

    Visual weld qualityPostheat as required

    Storage, handling, and reuse of SAW flux and SMAW electrodes

    7.5 Cambering, Curving and Straightening

    Adequate blocking elevations and intervals

    Following Engineer-approved calculations for locations of applied external forces or

    restraints, when required by the contractSize and locations of heating patterns

    Maximum temperatures and proper temperature monitoring

    Controlled coolingFinal dimensions

    7.6 Shop Assembly of Main Members

    Dimensional accuracy of each piece (deviation from specified length, camber, sweep)

    Individual member distortion, local and overall (twist, sweep, out-of-flatness of flange orweb)

    Clearance or bearing fit of adjacent members in assembly

    Assembly blocking dimensions and curve and camber offsets and elevationsSplice plate and secured fill plate dimensions and fit (gaps, non-parallel)

    Bolt hole accuracy, including adequate edge distances

    Bolt hole condition, including shape and squareness to faying surfaceMatch-marking of splice plates and correct location of all piece marks

    Removal of drilling burrsPreparation and documentation of as built shop assembly report

    7.7 Cleaning

    Proper solvent cleaning to remove surface contamination prior to mechanical cleaning

    Blast media gradation and cleanlinessVerification and documentation of required surface cleanliness and profile

    Checking the compressed air system for contaminants, especially if used to remove shot

    Proper functioning of automated blasting equipmentTreatment of material defects (scabs, fins, slivers) exposed by blasting, including

    reblasting if necessary after repairs

    Proper corner and edge treatment as required for coating system

    7.8 CoatingCoating sampling by manufacturer or at the Fabricator, including witnessing and delivery

    to the Engineer.

    Use of Owner-approved coating batchesMaintenance of air-line oil and air moisture traps

    Equipment for mixing, application, repair, film measurement, and safety

    Mixing and agitationMonitoring pot life

    15

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    22/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Application methods: spray nozzles, patterns, and sequencing for typical configurations

    and for areas inaccessible for spraying (snipes, restricted)Coating repair for damage, dry spray, runs, sags, and under- or over-thickness

    Control of thinning, when permitted

    Ambient temperature, steel temperature, relative humidity, and dew point

    Control of millage, wet and/or dry, as applicable (millage control per SSPC PA2)Intervals between coating applications

    Cure assessmentDocumentation for materials used, ambient conditions, cure verification, dry film

    thickness and/or wet film thickness readings, and problems and corrections

    7.9 High-Strength Fastener Shop Installation

    Material verification (manufacturer certifications, tensile tests, chemistries, hardness,rotational capacity test results, evidence of domestic origin) prior to installation

    Fastener markings

    Contact surface and hole qualityFunction and calibration of fastener tension device and torque wrench

    Execution of rotational capacity testingCheck-torque for verification of proper tightening.Fastener dimensions and condition, especially proper lubrication

    Use of hardened washer under the turned element during installation

    Verification that all fasteners in a joint are brought to snug-tight condition prior to finaltightening

    Verification that fasteners are tightened from the most rigid part of a joint towards its free

    edges and that the wrench is returned to previously tightened bolts to touch up anybolts which may have been relaxed from tightening other bolts in the joint

    Verification of full engagement of bolts (tip flush or beyond nut face)7.9.1 Turn-of-nut tightening

    Proper snug-tight sequenceNut rotation (marks on bolt tip and nut)Verification of proper tightening

    7.9.2 Calibrated wrench tightening

    Torque-to-tension relationshipVerification that wrenches are set to provide proper fastener tension and are

    calibrated at proper intervals

    Recalibration of wrenches when necessaryMaximum allowable fastener head or nut rotation

    7.9.3 Alternate Fastener Methods

    Verification of load-indicating washer characteristics

    Placement and interpretation of load-indicating washersSnug-tightening cycles before twist-off of control or indicator element

    Procedures for snugging and full tensioning with lock pin and collar bolts

    7.10 Loading and Shipping of Fabricated Members

    Written acknowledgement of QA acceptance before loading

    Loading, blocking, cushioning, and securing

    Repair of all areas where shop protective coating has been damagedVisual inspection of all loaded members

    16

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    23/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Part C Quality Assurance

    Section 8General

    Part C of this standard provides a QAP that the Owners QAIs will follow, including bothinspection personnel employed by the Owner and contracted inspection personnel acting as

    agents to the Owner. The role of the QAI is defined, and general guidelines are provided for

    monitoring QC procedures, fabrication personnel, qualifications, inspection status, equipmentcondition, record-keeping, and final acceptance of the work.

    QAP Overview

    QAIs will use this plan to verify conformance of the work with Contract requirements. The QAP

    is general in nature, to meet a wide variety of conditions and differing requirements in project

    plans and specifications. It is an inspection practice; it is not a part of the Contract and does notsupersede any project specifications or other job requirements.

    This plan is intended to be comprehensive for typical fabrication specification requirements.

    However, omission of a quality requirement in this plan does not relieve the QAI from inspectionif that requirement is part of the Contract. Contracts, through Owner standard specifications,

    typically address quality assurance inspection as the prerogative of the Owner. Quality assurance

    functions emphasize the review of QC work but also include independent inspections. Owner

    quality assurance is not a substitute for the Fabricators quality control.

    8.1 Qualifications of the QAI

    8.1.1 The QAI must be qualified in accordance withBridge Welding Code requirements.

    QAIs who interpret and perform NDE must be certified in accordance with theapplicable ASNT SNT-TC-1A requirements for each NDE method being used.

    8.1.2 The QAI for coatings must be qualified in accordance with Section 3.8.2 Scheduling

    The scheduling of inspection and other QA functions can have a significant impact on theproject. The QAI shall follow these guidelines:

    Coordinate with the QCI for anticipated production scheduling to anticipate timing and

    staffing needs. Discuss the progress of the work with appropriate Fabrication personneldesignated during the prefabrication conference (see 2.1.2 & 2.4.3).

    Schedule inspections in a timely manner to facilitate fabrication progress, especially if

    multiple shifts are used.Discuss with the Engineer whether additional presence in the shop is required.

    Document problems with scheduling inspection, including inaccurate information from

    fabrication personnel and production delays.

    17

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    24/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 9QAI Responsibilities

    9.1 Role of the QAI

    9.1.1 Perform verification tests, measurements, inspection, or observations to ensure that

    fabricated items conform to the Contract requirements. Although the QAI does notperform QC work, some QA activities may duplicate a portion of QC activity forverification.

    9.1.2 If there are questions about a requirement or level of quality, contact the Engineer

    and, if appropriate, alert the Fabricator.9.1.3 Conduct consistent inspections based on the Contract requirements while providing

    guidance to the Fabricator concerning interpretation of the plan details andspecification mandates. Obtain assistance from the Engineer as needed.

    9.1.4 Be familiar with the QCP to better understand the QC operations of the shop.

    9.2 Interaction with the Fabricator Quality Control Inspector

    9.2.1 Verify the effectiveness of the QCIs evaluation of the work.

    9.2.2 Perform verification inspection after the QCI has completed inspection and testingin accordance with the QCP. However, serious problems noted at any time or stage

    of fabrication must be immediately pointed out to the QCI.9.2.3 Though QA inspection may include all aspects of fabrication, the QAI must not

    supersede QC, which is the responsibility of the Fabricator. If QC is not

    accomplishing its role, the Engineer and Fabricator must determine the necessarycorrections.

    9.3 Interaction with the Engineer

    If the Fabricators inquiries involve design questions, material substitutions, alternate

    fabrication methods, or items that are beyond the authority of the QAI, refer them to the

    Engineer.9.4 Interpretation of the Contract

    Review Contract requirements. If conflicts arise regarding their interpretation or adequacy,

    seek guidance from the Engineer. Inform the QCI of the results of this discussion.

    9.5 Fabrication Observation

    9.5.1 Establish a pattern of regular and frequent observations during the progress of work

    to verify satisfactory workmanship without delaying production or missing critical

    operations.9.5.2 Coordinate verifications with the QCI and accomplish them with minimal

    additional material handling by the Fabricator and with as little interference with

    the work in process as possible.9.5.3 Though there are not designated points during fabrication when the suitability of

    materials must be checked, problems should be discovered and addressed as early

    as possible.

    9.6 Nonconforming Materials and Workmanship

    9.6.1 Bring any nonconformances to the attention of the Fabricator immediately upon

    discovery, and, for more serious deficiencies, notify the Engineer. However, do notdirect corrective action. If the Fabricator fails to take corrective action, or continues

    18

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    25/35

    Steel Bridge Fabrication QC/QA Guide Specification

    to operate in an unacceptable manner, document the event, notify the QCI that the

    work may be rejected and contact the Engineer.9.6.2 Verbal notification of nonconformance is usually sufficient, but if halting an

    operation must be recommended, convey this in writing. Before taking this action,

    discuss the situation with the QCI and obtain direction from the Engineer. If the

    Fabricator continues the operation after receiving the recommendation to cease, allsubsequent production by that method and the Owners potential rejection without

    QA inspection will be at the Fabricators risk.9.6.3 For significant problems, the Fabricator must submit a written proposal concerning

    the issue, providing documentation of the situation and proposed actions to address

    the issue. When the Fabricators proposal is received, reply or, for more seriousdeficiencies, forward the problem to the Engineer. For such serious deficiencies, the

    Fabricator may write directly to the Engineer, Contractor, or both, as directed, and

    send a copy to the QAI.9.6.4 When the Engineers approval is required for a repair, review and confirm the

    Fabricators proposed methods of repair and description of the existing material

    conditions. Seek guidance from the Engineer for clarification when necessary.Follow up to verify that all required corrections and applicable NDE have been

    accomplished.

    9.7 Final Acceptance of the Work

    9.7.1 When fabrication is complete and inspection results demonstrate that all Contractrequirements for the Fabricator have been satisfied, the materials are conditionally

    accepted, with final acceptance at the jobsite, in accordance with the Owners

    customary practice.9.7.2 Affix the Owners stamp or mark on the piece (or a group of parts bundled or

    contained together), if required, during preparation of a member/component forshipping, indicating that a representative of the Owner has inspected and accepted

    the work. Presence of this stamp does not relieve the Contractor of responsibilityfor proper loading, shipping, final fit, and acceptable final condition of the memberor component.

    19

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    26/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Section 10Documentation and References

    10.1 Familiarization with Requirements

    10.1.1 Become familiar with applicable portions of the Contract documents covering the

    work to be inspected. Study the plans and specifications before fabricationcommences to provide ample opportunity to coordinate with the Engineer.

    10.1.2 Have thorough knowledge of the following references:applicable current standard specifications, supplements, special provisions,

    special specifications, and addenda

    approved shop drawings (see 10.3)

    applicable provisions of the AREMA Manual for Railway Engineering, ifrequired for the project

    AASHTO/AWS D1.5,Bridge Welding Code

    fabricators QCP.10.1.3 Be familiar with the following references:

    AWS D1.1, Structural Welding CodeAWS A2.4, Symbols for Welding and Nondestructive Testing

    AWS A3.0, Standard Welding Terms and Definitionsapplicable ASTM or AASHTO specifications

    applicable coating test methods

    applicable SSPC Specificationsprefabrication meeting minutes, if any

    metrication conversion tables, if required.

    10.2 Required Documents

    Acquire the following documents:

    MTRs for material used in fabrication

    list of qualified welders, welding operators, and tack weldersapproved WPSsapproved welding procedure qualification records (PQRs)

    copy of approved nondestructive testing procedures

    list of qualified NDE technicians for the projectNDE reports for all work on this project that has been inspected and accepted by NDE

    project record log sheets.

    10.3 Use of Non-Approved Shop Drawings

    Fabrication should proceed only with approved shop drawings. However, if the Fabricator

    must proceed prior to receipt of approved shop drawings (performing work at their own

    risk), ensure that the Engineer is aware of this activity and proceed with preliminary or

    basic QA functions using non-approved shop drawings. Later, verify notes againstapproved drawings.

    20

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    27/35

    Steel Bridge Fabrication QC/QA Guide Specification

    10.4 Quality Assurance Inspector Records and Reporting

    10.4.1 Maintain a narrative report for each project, as directed by the Owner. The report

    should either be legibly hand-written in a permanently bound book, or bemaintained in an electronic log with automatic date and time recording. Record the

    Fabricators activity on the work inspected, including both positive and negative

    comments, suggestions given to the Fabricator, and any agreements made. Makeentries as soon possible after the events or conversations.

    10.4.2 The Engineer may require a periodic status report. If so, include information about

    the status of the work performed, shop activities, and other events of interest to theEngineer. Number the reports consecutively until completion of the work, with the

    last report noted final.

    10.4.3 Make notes, letters, faxes, reports, and memoranda clear and brief, and keep themon file.

    10.4.4 Do not make or release photographs or digital images without the Fabricators

    approval.10.4.5 Documentation is not a substitute for appropriate dialogue with the Fabricator, but

    should provide a record of important discussions. Sign on-site correspondence as itsoriginator. Correspondence may also be sent to the Fabricator from the Engineersoffice. In some cases, the QAI is more familiar with the events or issues and

    therefore should review and comment on draft copies of the Engineers

    correspondence.

    10.5 Mill Test Reports

    10.5.1 Verify use of proper materials by checking a copy of the MTRs when the material

    arrives and by monitoring heat numbers during fabrication until the material is

    joined into a piece-marked item.10.5.2 Obtain MTRs from the Fabricator in accordance with the Owners customary

    practice, including the number of copies and when and to whom MTRs should besubmitted.

    10.5.3 Periodically verify the following information on MTRs:

    product description (specifications, grade, H or P testing frequency)

    chemistry

    physical test results, including Charpy V-Notch when applicable

    applicable Buy America certification requirementsheat number

    certification signature (Quality Control Department and Notary, when required)

    This information will be checked by the Fabricator.

    10.5.4 Do not accept material if the Fabricator cannot furnish appropriate certifications to

    establish compliance with the required material properties and Buy Americarequirements, if required in the Contract.

    10.5.5 Maintain a record of heat number identification for main members.10.5.6 Accept structural steel based on MTRs. Miscellaneous hardware or other associated

    products may be accepted based on certifications of compliance.

    10.5.7 The Owner may require additional independent physical and chemical tests of thematerials properties. If so, these tests must be performed as soon as practical, and

    prior to fabrication. If the independent tests indicate noncompliance, do not allow

    use of the material until an agreement is reached between the Owner and the

    21

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    28/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Fabricator as to its acceptability. Bring such noncompliance to the attention of the

    QCI for evaluation and disposition.10.5.8 MTRs and laboratory reports must be accepted by the Owner before the material

    can obtain final approval. Verify compliance of MTRs with the requirements of the

    relevant ASTM or AASHTO specification (see 11.1.1).

    22

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    29/35

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    30/35

    Steel Bridge Fabrication QC/QA Guide Specification

    small parts properly packaged or otherwise secured against loss or damage in transit

    loose pieces fastened in place for shipmentapplication of rust-preventive material when required, and covering to prevent

    contamination of painted surfaces.

    11.3 Assembly

    11.3.1 Periodically observe laydowns and shop assembly.11.3.2 Verify the Fabricators geometry control methods and measurements. For full or

    partial shop assemblies, receive the QCIs signed reports of measurements for the

    Owners records. For full assemblies, photographs should also be included in theQAIs report (see 10.4.4).

    11.4 Welding

    11.4.1 Monitor these criteria prior to welding:

    appropriate equipment in acceptable condition and periodically calibrated perQCP

    proper functioning of drying and baking ovens

    Qualified welders, welding operators, and tack weldersappropriate, approved welding procedures for detailed joint

    joint details, including root face and opening, bevel angle, and alignment of parts

    within appropriate welding code tolerancesproper application of extension tabs (run-on and run-off)

    cleanliness of surfaces to be welded

    proper condition and storage of welding consumablessize, quality and location of tack welds.

    11.4.2 Monitor these consumable-handling criteria:

    storage, condition, and exposure times of welding consumablesre-drying and recycling limits.

    11.4.3 Monitor these criteria during welding:following approved welding procedure specifications (WPSs): amperage,

    voltage, speed of travel, electrode extension, shielding gas flowrate, and preheat,

    interpass, and/or post-heat temperatures within applicable welding code andWPS tolerances

    workmanship of individual welders

    use of proper repair procedures for fabrication errors, including, when required,the Engineers approval

    weld starts and stops, securing and removing runon and runoff tabs, stopping

    short of snipes or plate edges, and ending without craters11.4.4 Monitor these final weld quality criteria:

    size, profile, and contour of fillet and groove welds

    no defects in welds or parent metalaccurate interpretation by QCIs for the acceptance or rejection of welds

    cleaning and backgouging of welds, including thorough removal of unsound

    metal and gouging contamination (copper, carbon).

    24

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    31/35

    Steel Bridge Fabrication QC/QA Guide Specification

    11.5 Use of Approved Welding Consumables

    11.5.1 Review the consumable manufacturers certificate of conformance maintained by

    the Fabricator for all consumables used. Obtain copies for project file if required byOwners policy.

    11.5.2 If the Owner maintains a list of approved electrodes, verify that all consumables

    used by the Fabricator are on the list.

    11.6 Nondestructive Evaluation

    11.6.1 Review and approve the qualification documentation of those performing NDE for

    the Fabricator.11.6.2 Periodically witness NDE, review the test results, and verify that reports are

    complete and legible.

    11.6.3 For radiographic testing (RT), conduct the following activities:

    Interpret test results in accordance with Contract requirements.

    Verify that final edges may be properly interpreted. (If the plate will be cut after

    RT, the final edge may be within the plate on the RT film.)

    Verify proper application of edge blocks if necessary (plate edge is final edge instructure).

    Verify that each radiograph represents a unique section or piece by comparing

    punch marks or other approved methods of marking the work and correspondingmarks on the film.

    11.6.4 Periodically observe or conduct, if necessary, ultrasonic testing (UT) to verify the

    Fabricators NDE results. The QAI will determine intervals for observation ofverification testing unless otherwise directed by the Engineer.

    11.6.5 For magnetic particle testing (MT), conduct the following activities:

    Periodically observe the application and interpret the results of MT performed onprimary members to verify that they satisfyBridge Welding Code requirements.

    On ancillary, secondary or miscellaneous items, periodically observe andinterpret MT when required by the Contract.

    Observe MT when needed to verify visual findings.

    Observe and interpret MT applied to evaluate removal of defects and weldedshop repairs for base metal and deficient welds.

    11.6.6 For liquid penetrant testing (PT), periodically observe technique and interpret

    results.

    11.7 Coatings

    11.7.1 When sampling:

    Coordinate coating sampling in the shop with the Fabricator.

    Conduct sampling as early as possible.

    Witness sampling, including mixing or stirring if required for uniformity.Ensure that the required samples are delivered to the Owner in suitable

    containers.11.7.2 If the Owner maintains a list of pre-tested, pre-approved coatings so sampling is not

    required, check the list to ensure that the actual batches or lots of the paint to be

    used are acceptable.11.7.3 If the Owner obtains coating samples directly from the manufacturer, and the

    batches are approved prior to shipment to the Fabricator or jobsite, verify that the

    25

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    32/35

    Steel Bridge Fabrication QC/QA Guide Specification

    batch numbers received correspond to the approved list, and, if applicable, that

    approval stamps are present.11.7.4 Prior to coating application, verify the following:

    Coating containers are properly marked with a batch number.

    Batches have been properly strained and mixed (note when pot life initiates).

    11.7.5 Do not accept coated girders until the Owners lab accepts the coating.11.7.6 For coating application inspection, verify the following:

    proper cleaning and surface preparation of base metal prior to coatingapplication of coating in accordance with manufacturer and/or Contract

    requirements

    adequate curing of each coat as demonstrated by the prescribed test and, whenmulti-coat systems are used, prior to the application of subsequent coats

    thickness of coating, wet or dry, as specified for each system and type

    sufficient drying of coating prior to loading for shipmentabsence of dry spray, runs, sags and other defects

    proper coating of inaccessible and limited access areas

    proper treatment of faying surfaces.11.8 Bolting

    11.8.1 If fasteners to be tested by the Owner are sampled at the Fabricators facility,

    witness and document sampling of components for fastener assemblies in

    accordance with the Owners practice.11.8.2 Verify that all fasteners are properly stored and segregated.

    11.8.3 When fasteners are installed in the shop, ensure that installation and verification

    testing procedures are properly followed.11.8.4 Witness the rotational capacity and verification testing for shop-installed high-

    strength fasteners.

    11.9 Final Inspection and Loading for Shipment

    11.9.1 When all work is complete, conduct a final visual examination of the work.

    11.9.2 The QCI will provide copies of reports covering the materials to be shipped. Verify

    that all data are correct.11.9.3 Randomly observe handling and loading of the work to verify that the methods and

    supports used will prevent significant damage during shipping.

    26

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    33/35

    Steel Bridge Fabrication QC/QA Guide Specification

    Commentary

    C1.2 In fabrication, there are two distinct engineering roles played by the Owner. One is thedesigner, and the other has responsibility for accepting fabricated members. In general, the

    fabrication engineer works with the QA inspectors to ensure the quality of fabricated work, and

    can also judge acceptability of work not fully satisfying the contract, such as material or weld

    defects. The designer must be consulted if there are to be any changes that may affect thebehavior of the structure.

    Open communication between the Fabricator, the fabrication engineer, and the designer is

    important; however, communication between the designer and the fabrication engineer must becoordinated to avoid confusion. A good rule of thumb is that prior to shop drawing submittal, the

    Fabricator should communicate directly with the designer to resolve any technical questions, so

    that resulting agreements will be reflected in the shop drawings. After the shop drawings havebeen approved, the Fabricator should communicate with the fabrication engineer because the QA

    and QC inspectors will be checking the work based on the shop drawings and they must be

    informed of all changes.

    C2.1 All parties involved in fabrication must have a common objective: to provide steel meetingall contract requirements in a timely fashion with minimum repairs. To this end, the Owner and

    the Fabricator should work together in a cooperative spirit, and develop relationships based on

    mutual respect and trust.

    C2.3.12 The Fabricator should inform the QAI when information is proprietary to avoid

    confusion. In general, the QAI should respect the fabricators intellectual property and not

    discuss operations with other fabricators, even if the information is not proprietary.

    C3.1 The objective of this provision is to ensure that the inspector has the experience andknowledge necessary to effectively fulfill the positions responsibilities. The amount of

    experience needed varies with the complexity and criticality of the work. Though these time

    periods should be sufficient to familiarize the inspector with steel bridge fabrication, more timemay be needed to ensure that the inspector has the capability to carry the full responsibility of the

    inspector.

    These time limits normally apply to the inspector with full responsibility for acceptance of the

    work. For the fabricator, this may include the QC manager and lead inspectors in each work area(preparation, welding, painting). For the Owner, this is the projects lead inspector who provides

    final acceptance of the work. These recommendations should not preclude inspectors with less

    experience working under the guidance of more qualified inspectors.

    These time limits are recommended and not required because the amount of time it takes for aninspector to be ready to carry the full responsibility for inspection varies from person to person.

    The Engineer or Fabricator should carefully consider the integrity and the abilities of theindividual before assigning responsibilities for inspection. The time needed for an individual togain adequate competency could be more or less than the recommendations.

    C3.1.3 Usually rolled beam bridges are not very complex and so the guide recommends that

    experience with rolled beams not be counted. However, some rolled beam bridges, especially

    continuous-span bridges, are rather complex, and experience on such structures may beconsidered.

    C4.4.1 Material quality should be verified before use. However, not all surfaces of material areaccessible during receipt inspection, and the Fabricator does not need to move materials just for

    27

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    34/35

    Steel Bridge Fabrication QC/QA Guide Specification

    this inspection. Evaluation of surface quality continues through the fabrication cycle and is

    performed by production as well as inspection personnel.

    C4.5.2 Approved consumables are either on the Owners list of approved consumables or as permitted in the Contract, based on Procedure Qualification Test Report (PQR) test data and

    certificates of conformance from the consumable manufacturer.

    C4.7.4 When problems are found during fabrication that require the involvement of thefabrication engineer or the designer, questions should be submitted through the fabrication

    engineer. There should be only one Owner representative who coordinates all corrections and

    changes to the work. However, when the designer needs to be involved, the fabrication engineershould coordinate direct, informal communication between the fabricator and the designer to

    facilitate a quick resolution to the problem.

    C5.2 The Collaboration requirements for the Fabricators QCP are intended to be compatible

    with the AISC certification program requirements. QCP requirements should not contradict theAISC certification requirements; duplicate work is not desired where the Collaboration and

    AISC programs have like requirements.

    C5.4 Under theBridge Welding Code, qualification of welders is the Fabricators responsibility.

    The Owner is not required to provide or approve welder qualification testing.

    C6.2.1 For projects that are small or non-complex, Fabricators sometimes prefer to keep recordson shop drawings rather than creating additional forms for documentation. This practice is

    acceptable as long as all pertinent information can reasonably be maintained and conveyed.

    C7.1 There are many ways a Fabricator can help ensure quality. This section divides Fabricatoractivities into two parts: (1) formal activities, which include the various functions of the QC

    department, including those stipulated by Contract, such as NDE; and (2) informal quality

    control, such as production personnel checking their own work. Detailing the formal QCactivities is a primary purpose of the QCP, but it does not need to stipulate the informal activities

    of the production personnel. The QCP should reflect the fact that production personnel areresponsible for the quality of their work and should be mindful of their work, but does not need

    to detail production personnel activities to ensure quality.

    C7.7 Though corner grinding or breaking has long been a requirement, recent research reflects

    that corner grinding is not needed for fatigue performance, nor for proper performance of manycoatings. The inspector should check the Contract for any specific corner-grinding requirements

    and inspect the work accordingly.

    C8.2.1 QAIs should be knowledgeable and appropriately trained or certified to properly conduct

    their duties. The QAI routinely observes and reviews the work performed by the fabricator,including NDE, on behalf of the owner. If the QAI performs NDE or interprets the NDE results

    provided by the fabricator, the QAI should be certified in the NDE method. Radiographic testing(RT) is an exception, since the QAI may be able to interpret an RT film without being qualifiedto perform RT.

    C8.3 Schedule coordination between the QAI and the shop is important. Owners want to be

    present for important production events, but it may be unnecessary and impractical for the

    Owner to be present during all production. The plant should provide sufficient information to theOwner about the production schedule, and the QAI should make every effort to be present when

    needed in the plant.

    28

  • 8/6/2019 Steel Bridge Fabrication QC QA Guide Specification

    35/35

    Steel Bridge Fabrication QC/QA Guide Specification

    C9.1 In steel bridge fabrication customary practice, quality assurance (QA) generally refers to

    the role performed by the Owners inspectors, and quality control (QC) is the responsibility of,and therefore performed by, the Fabricators inspectors. Generally speaking, the Fabricator

    performs QC to be sure the work is good. Some QC is specifically prescribed by the Contract,

    but beyond the prescribed work there are many other QC functions that must be performed to

    ensure that the bridge is correctly fabricated. QA work is not intended to be as detailed as QCwork. An important QA function is ensuring that the QC department is properly checking,

    documenting and correcting work. However, this does not preclude inspection by the QAI, andthe QAI should perform some actual measurement and evaluation of the work. However, the

    Owner and Fabricator must be careful to ensure that the QAI does not take on the role of the

    QCI. This can occur especially in less experienced shops without a fully developed andexperienced QC department. Knowing that the QAI will be checking the work, the Fabricator

    may feel that the QA check will be enough and QC is not needed. This is erroneous, both

    because quality is the Fabricators responsibility, and, perhaps more importantly, because to betruly effective QC must be proactive and involved in the work from the start and throughout

    production.

    C9.4 An unrealistic or too literal interpretation of the specifications can disrupt the project.

    C9.6 The resolutions for some problems originate elsewhere, but all issues should be routed

    through the fabrication engineer, particularly after shop drawings are approved. In cases wherethe designers input or approval is needed, the Fabricator may send advance copies of proposed

    resolutions directly to the designer, but the formal submittal should still be through the

    fabrication engineer. The designer should reply directly to the fabrication engineer, who in turnreplies to the Fabricator and ensures that everyone involved is informed of the resolution.

    C10.3 Fabricators should have approved shop drawings before fabrication begins, but often

    shop drawings are not yet approved when the Fabricator wants to begin work. Shop drawings

    should be returned within a reasonable amount of time (see review time recommendations in

    AASHTO/NSBA Steel Bridge Collaboration G1.1, Shop Detail Drawing Review/ApprovalGuidelines) but Owners sometimes take much longer, even several months. In such cases

    Fabricators may request approval to begin fabrication without having approved shop drawings,

    taking responsibility for any changes. Because holding up the Fabricator may delay progress inthe field, Owners should allow the Fabricator to proceed, provided the Fabricator has submitted

    the shop drawings and provides copies of the submitted drawings to the QAI. The QAI should

    use the Fabricators drawings as submitted until the approved drawings are provided. Then the

    QAI and QCI should coordinate with the Fabricators detailer to define any drawing revisionsand verify that changes are incorporated into the work.

    C11.4.2 The QAI must ensure that approved welding procedures are followed. This includes

    observing the QCI periodically monitoring the current and voltage. The QAI should be aware

    that voltage varies over the length of the welding leads and that welding machine gauges oftencannot be trusted. Therefore, current and voltage should be verified as close to the work as

    possible using calibrated ampere and volt meters. Travel speed and wire feed speed should bechecked using a tape measure or ruler and a watch with a second hand.