STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!
6

STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

Dec 14, 2015

Download

Documents

Paloma Goodall
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

STATUS OF THE TPC ANALYSIS

Jaime Ruz Armendáriz Patras, May 23rd, 2006

43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

Page 2: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

2nd Evolution

5.00E-05

6.00E-05

7.00E-05

8.00E-05

9.00E-05

1.00E-04

1.10E-04

1.20E-04

1.30E-04

1.40E-04

1.50E-04

0 5 10 15 20 25 30 35 40 45

Pressure Setting

cou

nts

/keV

/cm

2/se

c

Background [2-10] keV

Tracking [2-10] keV

2005-2006 TPC DATA TAKING2005-2006 TPC DATA TAKING

FROM NOVEMBER 22nd TO DECEMBER 14th FROM JANUARY 19TH TO FEBRUARY 2ND FROM APRIL 29TH TO MAY 14TH

Tracking

Background

Jaime Ruz Armendáriz Patras, May 23rd, 2006

Page 3: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

5.00E-05

6.00E-05

7.00E-05

8.00E-05

9.00E-05

1.00E-04

1.10E-04

1.20E-04

1.30E-04

1.40E-04

1.50E-04

30 32 34 36 38 40 42 44 46

Pressure Setting

cou

nts

/keV

/cm

2/se

c

Tracking

INTERVENTION IN THE TPC SHIELDINGINTERVENTION IN THE TPC SHIELDING

PVC BAG SURROUNDING TPC SHIELDING RADON SHIELDING IMPROVED RATE EVOLUTION AFTER CUTS IS 20 COUNTS PER HOUR AND WINDOW. PROBLEM WITH CALIBRATOR DEVICE (SHIELDING OPEN ON MAY 9TH)

TPC shieldOpen for intervention

Calibrator device was failing09/05/2006

Recovering Radon shielding

Jaime Ruz Armendáriz Patras, May 23rd, 2006

Page 4: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

2005

•Tracking 1.05x10-4 ± 2.01x10-6

•Background 1.05x10-4 ± 5.23x10-7

•Substracted -1.09x10-7 ± 2.09x10-6

2006(I)

•Tracking 1.17x10-4 ± 2.96x10-6

•Background 1.20x10-4 ± 9.05x10-7

•Substracted -3.58x10-6 ± 2.88x10-5

2006(II)

•Tracking 8.48x10-5 ± 2.03x10-6

•Background 8.54x10-5 ± 5.93x10-7

•Substracted -5.27x10-7 ± 2.12x10-5

BACKGROUND & TRACKING LEVELSBACKGROUND & TRACKING LEVELS

TOTAL

•Tracking 1.01x10-4 ± 1.27x10-5

•Background 1.02x10-4 ± 3.60x10-7

•Substracted -1.10x10-6 ± 1.33x10-6

Jaime Ruz Armendáriz Patras, May 23rd, 2006

Page 5: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

Substracted [2-10] keV

-4.41E-05

-2.41E-05

-4.10E-06

1.59E-05

3.59E-05

5.59E-05

0 5 10 15 20 25 30 35 40 45

Pressure Setting

coun

ts/k

eV/c

m2/

sec

Substracted

SUBSTRACTION STABILITY SUBSTRACTION STABILITY -1.10x10-6 ± 1.33x10-6

Jaime Ruz Armendáriz Patras, May 23rd, 2006

Page 6: STATUS OF THE TPC ANALYSIS Jaime Ruz Armendáriz Patras, May 23 rd, 2006 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!!

CONCLUSIONS CONCLUSIONS

ALL PRESSURE SETTING HAVE BEEN ANALIZED

SUBSTRACTION OF BACKGROUND CONSISTENT FOR ALL PRESSURE SETTINGS

Jaime Ruz Armendáriz Patras, May 23rd, 2006