23.02.09 Oleg Maev 1 Status of Muon chambers and UF/PNPI HV-system. Outline - Status of Muon chambers - HV-system, status, tests and repairing of voltage sensors (VS), recalibration VS in situ, spare channels.
15

Status of Muon chambers and UF/PNPI HV-system.

Jan 13, 2016

Download

Documents

do do

Status of Muon chambers and UF/PNPI HV-system. Outline Status of Muon chambers HV-system, status, tests and repairing of voltage sensors (VS), recalibration VS in situ, spare channels. Status of Muon chambers. M2-M5 stations 1104 Chambers are at 2,5 kV from spring 2008. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 1

Status of Muon chambers and UF/PNPI HV-system.

Outline

- Status of Muon chambers

- HV-system, status, tests and repairing of voltage sensors (VS), recalibration VS in situ, spare channels.

Page 2: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 2

Status of Muon chambers

M2-M5 stations

1104 Chambers are at 2,5 kV

from spring 2008

Page 3: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 3

Status of Muon chambers

Q1:

Page 4: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 4

Status of Muon chambers

Q2:

Page 5: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 5

Status of Muon chambers

Q3:

Page 6: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 6

Status of Muon chambers

Q4:

Page 7: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 7

Status of Muon chambers

• In total from 4416 gaps 99,7 % are OK

Page 8: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 8

Status of Muon chambers

Last spare R4 chambers were delivered from PNPI at the end of 2008.

So we have spare:

M2R4-11 chambers

M3R4-15 chambers

M4R4-15 chambers

They passed gas leak, capacitance and integrity tests successfully and they are awaiting some components to perform final assembling and final tests.

Page 9: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 9

UF/PNPI HV-system

8 Master modules and 56 RDB#36 modules (960 from 1104 chambers)

Status on the end of October 2008.1. Masters work without problems after summer repair.

2. Several RDB channels had a permanent pre-trip status (I > Imax, but ttrip< 1s).

Tests of voltage sensors of RDB channels in “transparent mode”:

(HV on premier PS =2,5 kV, Vset>=2,6kV) 13&20.10.08 have shown many bad channels:

Page 10: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 10

UF/PNPI HV-system

Test 28.11.08 HV on premier PS =2,5 kV, Vset=2,7kV

Page 11: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 11

UF/PNPI HV-system

Page 12: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 12

UF/PNPI HV-system

Page 13: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 13

UF/PNPI HV-system

Page 14: Status of Muon chambers   and UF/PNPI HV-system.

02.02.09Oleg Maev 14

UF/PNPI HV-system. Spare elements.

Master modules:mother board – 1

with 8 channels (repaired by Nikolay last month)

plus 8 spare channels which aren’t checked yet

RDB#36 modules:mother boards – 4

channels – 36 x 3 + 3 =111 chs

to be repaired – 45 chs

Reserve inside system: Master chs. – 8,

RDB chs. 12x8=96

Quality of them is ?

This year our understanding of system really grown up. And now, we ensure that the HV-system is working properly in acceptable and safe mode.

Page 15: Status of Muon chambers   and UF/PNPI HV-system.

23.02.09Oleg Maev 15

Conclusion.1. After about half of year of system in operation we found 2,5%

unstable voltage sensors in RDB modules and approximately the same percentage of noisy (trips of channels) channels.

The reasons of bad channels are various. There is a simple mortality of electronic components and also an inconsistency of component parameters to the design requirements. Part of them have been found and partially fixed by Nikolay.

2. We are sure that the HV-system doesn’t need any global upgrades (replacing of HV-resistors etc.) or principal changes at present! We must provide just a final tuning of system and the permanent monitoring of it during operation.

3. SW for recalibration of voltage sensors in situ under preparation and Evgeny hopes to finish it before end of March. Next task is installation and debugging this SW in the PIT.

UF/PNPI HV-system